H.R. 3236
110th Congress
Reported by committee
Energy Efficiency Improvement Act of 2007
To promote greater energy efficiency.
Introduced
Jul 31, 2007
Committee
Aug 3, 2007
Passed House
Next step
Passed Senate
To President
Became law
+0 sections added
−0 removed
~4 modified
=54 unchanged
+13 words ·
−10 words
SEC. 102. Electric motor efficiency standards Modified
SEC. 102. Electric motor efficiency standards.
(a) Definitions. Section 340(13) of the Energy Policy and Conservation Act (42 U.S.C. 6311(13)) is amended—
(1) by redesignating subparagraphs (B) through (H) as subparagraphs (C) through (I), respectively; and
(2) by striking the text of subparagraph (A) and inserting the following:
The term general purpose electric motor (subtype I) means any motor that meets the definition of General Purpose as established in the final rule issued by the Department of Energy for “Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures, Labeling, and Certification Requirements for Electric Motors” (10 CFR C.F.R. 431), as in effect on the date of enactment of the [short title].
(B) The term general purpose electric motor (subtype II) means motors incorporating the design elements of a general purpose electric motor (subtype I) that are configured as one of the following:
⋯ Show 7 unchanged paragraphs
(i) U-Frame Motors.
(ii) Design C Motors.
(iii) Close-coupled pump motors.
(iv) Footless motors.
(v) Vertical solid shaft normal thrust motor (as tested in a horizontal configuration).
(vi) 8-pole motors (~900 rpm).
(vii) All poly-phase motors with voltages up to 600 volts other than 230/460 volts.
(b) Standards. Section 342(b) of the Energy Policy and Conservation Act (42 U.S.C. 6313(b)) is amended by striking the text of paragraph (1) and inserting the following:
(A) Each general purpose electric motor (subtype I), except as provided in subparagraph (B), with a power rating of 1 horsepower or greater, but not greater than 200 horsepower, manufactured (alone or as a component of another piece of equipment) after the 36-month period beginning on the date of enactment of the [short title], shall have a nominal full load efficiency not less than as defined in NEMA MG–1 (2006) Table table 12–12.
(B) Each fire pump motor manufactured (alone or as a component of another piece of equipment) after the 36-month period beginning on the date of enactment of the [short title], shall have nominal full load efficiency not less than as defined in NEMA MG–1 (2006) Table table 12–11.
(C) Each general purpose electric motor (subtype II) with a power rating of 1 horsepower or greater, but not greater than 200 horsepower, manufactured (alone or as a component of another piece of equipment) after the 36-month period beginning on the date of enactment of the [short title], shall have a nominal full load efficiency not less than as defined in NEMA MG–1 (2006) Table table 12–11.
(D) Each NEMA Design B, general purpose electric motor with a power rating of more than 200 horsepower, but not greater than 500 horsepower, manufactured (alone or as a component of another piece of equipment) after the 36-month period beginning on the date of enactment of the [short title], shall have a nominal full load efficiency not less than as defined in NEMA MG–1 (2006) Table table 12–11.
SEC. 122. Incandescent reflector lamps Modified
⋯ Show 30 unchanged paragraphs
SEC. 122. Incandescent reflector lamps.
(a) Definitions. Section 321 of the Energy Policy and Conservation Act (42 U.S.C. 6291) is amended—
(1) in paragraph (30)(C)(ii)—
(A) in the matter preceding subclause (I)—
(i) by striking “or similar bulb shapes (excluding ER or BR)” and inserting “ER, BR, BPAR, or similar bulb shapes”; and
(ii) by striking “2.75” and inserting “2.25”; and
(B) by striking “is either—” and all that follows through subclause (II) and inserting “has a rated wattage that is greater than 40 watts.”; and
(2) by adding at the end the following:
(52) The term BPAR incandescent reflector lamp means a reflector lamp as shown in figure C78.21–278 on page 32 of ANSI C78.21–2003.
(53)
(A) The term BR incandescent reflector lamp means a reflector lamp that has—
(i) a bulged section below the major diameter of the bulb and above the approximate baseline of the bulb, as shown in figure 1 (RB) on page 7 of ANSI C79.1–1994, incorporated by reference in section 430.22 of title 10, Code of Federal Regulations (as in effect on the date of enactment of this paragraph); and
(ii) a finished size and shape shown in ANSI C78.21–1989, including the referenced reflective characteristics in part 7 of ANSI C78.21.
(B) The term BR30 refers to a BR incandescent reflector lamp with a diameter of 30/8ths of an inch and the term BR40 refers to a BR incandescent reflector lamp with a diameter of 40/8ths of an inch.
(54)
(A) The term ER incandescent reflector lamp means a reflector lamp that has—
(i) an elliptical section below the major diameter of the bulb and above the approximate baseline of the bulb, as shown in figure 1 (RE) on page 7 of ANSI C79.1–1994, incorporated by reference in section 430.22 of title 10, Code of Federal Regulations (as in effect on the date of enactment of this paragraph); and
(ii) a finished size and shape shown in ANSI C78.21–1989, incorporated by reference in section 430.22 of title 10, Code of Federal Regulations (as in effect on the date of enactment of this paragraph).
(B) The term ER30 refers to an ER incandescent reflector lamp with a diameter of 30/8ths of an inch and the term ER40 refers to an ER incandescent reflector lamp with a diameter of 40/8ths of an inch.
(55) The term R20 incandescent reflector lamp means a reflector lamp that has a face diameter of approximately 2.5 inches, as shown in figure 1(R) on page 7 of ANSI C79.1–1994.
(b) Standards for fluorescent lamps and incandescent reflector lamps. Section 325(i) of the Energy Policy and Conservation Act (42 U.S.C. 6925(i)) is amended by striking paragraph (1) and inserting the following:
(1) Standards.
(A) Definition of effective date. In this paragraph, except as specified in subparagraphs (C) and (D), the term effective date means, with respect to each type of lamp specified in a table contained in subparagraph (B), the last day of the period of months corresponding to that type of lamp, as specified in the table, that follows the date of enactment of the [short title].
(B) Minimum standards. Each of the following general service fluorescent lamps and incandescent reflector lamps manufactured after the effective date specified in the tables contained in this paragraph shall meet or exceed the following lamp efficacy and CRI standards:
Lamp Type | Nominal Lamp Wattage | Minimum CRI | Minimum Average Lamp Efficacy (LPW) | Effective Date (Period of Months) 4-foot medium bi-pin | >35 W | 69 | 75.0 | 36 ≤35 W | 45 | 75.0 | 36 2-foot U-shaped | >35 W | 69 | 68.0 | 36 ≤35 W | 45 | 64.0 | 18 8-foot slimline | 65 W | 69 | 80.0 | 18 ≤65 W | 45 | 80.0 | 18 8-foot high output | >100 W | 69 | 80.0 | 18 ≤100 W | 45 | 80.0 | 18
Nominal Lamp Wattage | Minimum Average Lamp Efficacy (LPW) | Effective Date (Period of Months) 40–50 | 10.5 | 36 50–66 | 11.0 | 36 67–85 | 12.5 | 36 86–115 | 14.0 | 36 116–155 | 14.5 | 36 156–205 | 15.0 | 36
(C) Exemptions. The standards specified in subparagraph (B) shall not apply to the following types of incandescent reflector lamps:
(i) Lamps rated at 50 watts or less of the following types: ER30, BR30, BR40, and ER40 lamps.
(ii) Lamps rated at 65 watts of the following types: BR30, BR40, and ER40 lamps.
(iii) R20 incandescent reflector lamps of 45 watts or less.
(D) Effective dates.
(i) Er, ER, br, and bpar lamps. Except as provided in subparagraph (A), the standards specified in subparagraph (B) shall apply with respect to ER incandescent reflector lamps, BR incandescent reflector lamps, BPAR incandescent reflector lamps, and similar bulb shapes on and after January 1, 2008.
(ii) Lamps between 2.25–2.75 inches in diameter. The standards specified in subparagraph (B) shall apply with respect to incandescent reflector lamps with a diameter of more than 2.25 inches, but not more than 2.75 inches, on and after January 1, 2008.
SEC. 161. Industrial energy efficiency Modified
⋯ Show 37 unchanged paragraphs
SEC. 161. Industrial energy efficiency.
(a) Amendment. Title III of the Energy Conservation and Policy Act (42 U.S.C. 6201 and following) is amended by adding the following after part D:
E Industrial energy efficiency.
371. Survey of waste industrial energy recovery and potential use. Congress finds that—
(1) the Nation should encourage the use of otherwise wasted energy and the development of combined heat and power and other waste energy recovery projects where there is wasted thermal energy in large volumes at potentially useful temperatures;
(2) such projects would increase energy efficiency and lower pollution by generating power with no incremental fossil fuel consumption;
(3) because recovered waste energy and combined heat and power projects are associated with end-uses of thermal energy and electricity at the local level, they help avoid new transmission lines, reduce line losses, reduce local air pollutant emissions, and reduce vulnerability to extreme weather and terrorism; and
(4) States, localities, electric utilities, and other electricity customers may benefit from private investments in recovered waste energy and combined heat and power projects at industrial and commercial sites by avoiding generation, transmission and distribution expenses, and transmission line loss expenses that may otherwise be required to be recovered from ratepayers.
372. Definitions. For purposes of this Part:
(1) The term Administrator means the Administrator of the Environmental Protection Agency.
(2) The term waste energy means—
(A) exhaust heat and flared gases from any industrial process;
(B) waste gas or industrial tail gas that would otherwise be flared, incinerated or vented;
(C) a pressure drop in any gas, excluding any pressure drop to a condenser that subsequently vents the resulting heat; and
(D) such other forms of waste energy as the Administrator may identify.
(3) The term recoverable waste energy means waste energy from which electricity or useful thermal energy may be recovered through modification of existing facilities or addition of new facilities.
(4) The term net excess power means, for any facility, recoverable waste energy recovered in the form of electricity in amounts exceeding the total consumption of electricity at the specific time of generation on the site where the facility is located.
(5) The term useful thermal energy is energy in the forms of direct heat, steam, hot water, or other thermal forms that is used in production and beneficial measures for heating, cooling, humidity control, process use, or other valid thermal end-use energy requirements, and for which fuel or electricity would otherwise be consumed.
(6) The term combined heat and power system means a facility—
(A) that simultaneously and efficiently produces useful thermal energy and electricity; and
(B) that recovers not less than 60 percent of the energy value in the fuel (on a lower-heating-value basis) in the form of useful thermal energy and electricity.
(7) The terms electric utility, State regulated electric utility, nonregulated electric utility and other terms used in this Part have the same meanings as when such terms are used in title I of the Public Utility Regulatory Policies Act of 1978 (relating to retail regulatory policies for electric utilities).
373. Survey and registry.
(a) Recoverable Waste-Energy Inventory Program. The Administrator, in cooperation with State energy offices, shall establish a Recoverable Waste-Energy Inventory Program. The program shall include an ongoing survey of all major industrial and large commercial combustion sources in the United States and the sites where these are located, together with a review of each for quantity and quality of waste energy.
(b) Criteria. The Administrator shall, within 120 days after the enactment of this section, develop and publish proposed criteria subject to notice and comment, and within 270 days of enactment, establish final criteria, to identify and designate those sources and sites in the inventory under subsection (a) where recoverable waste energy projects or combined heat and power system projects may have economic feasibility with a payback of invested costs within 5 years or less from the date of first full project operation (including incentives offered under this Part). Such criteria will include standards that insure that projects proposed for inclusion in the Registry are not developed for the primary purpose of making sales of excess electric power under the regulatory treatment provided under this Part.
(c) Technical support. The Administrator shall provide to owners or operators of combustion sources technical support and offer partial funding (up to one-half of total costs) for feasibility studies to confirm whether or not investment in recovery of waste energy or combined heat and power at that source would offer a payback period of 5 years or less.
(d) Registry.
(1) The Administrator shall, within one year after the enactment of this section, establish a Registry of Recoverable Waste-energy Sources, and sites on which those sources are located, which meet the criteria set forth under subsection (b). The Administrator shall update the Registry on not less than a monthly basis, and make the Registry accessible to the public on the Environmental Protection Agency web site. Any State or electric utility may contest the listing of any source or site by submitting a petition to the Administrator.
(2) The Administrator shall register and include on the Registry all sites meeting the criteria of subsection (b). The Administrator shall calculate the total amounts of potentially recoverable waste energy from sources at such sites, nationally and by State, and shall make such totals public, together with information on the air pollutant and greenhouse gas emissions savings that might be achieved with recovery of the waste energy from all sources and sites listed in the Registry.
(3) The Administrator shall notify owners or operators of Recoverable Waste-Energy Sources and sites listed in the Registry prior to publishing the listing. The owner or operator of sources at such sites may elect to have detailed quantitative information concerning that site not made public by notifying the Administrator of that election. Information concerning that site shall be included in State totals unless there are fewer than 3 sites in the State.
(4) As waste energy projects achieve successful recovery of waste energy, the Administrator shall remove the related sites or sources from the Registry, and shall designate the removed projects as eligible for the incentive provisions provided under this Part and the regulatory treatment required by this Part. No project shall be removed from the Registry without the consent of the owner or operator of the project if the owner or operator has submitted a petition under section 375 and such petition has not been acted upon or denied.
(5) The Administrator shall not list any source constructed after the date of the enactment of this Part on the Registry if the Administrator determines that such source—
(A) was developed for the primary purpose of making sales of excess electric power under the regulatory treatment provided under this Part; or
(B) does not capture at least 60 percent of the total energy value of the fuels used (on a lower-heating-value basis) in the form of useful thermal energy, electricity, mechanical energy, chemical output, or some combination of them.
(e) Self-certification. Owners, operators, or third-party developers of industrial waste-energy projects that qualify under standards established by the Administrator may self-certify their sites or sources to the Administrator for inclusion in the Registry, subject to procedures adopted by the Administrator. To prevent a fraudulent listing, the sources shall be included on the Registry only if the Administrator confirms the submitted data, at the Administrator’s discretion.
(f) New facilities. As a new energy-consuming industrial facility is developed after the enactment of this Part, to the extent it may constitute a site with recoverable waste energy that may qualify for the Registry, the Administrator may elect to include it in the Registry at the request of its owner or operator or developer on a conditional basis, removing the site if its development ceases or it if fails to qualify for listing under this Part.
(g) Optimum means of recovery. For each site listed in the Registry, at the request of the owner or operator of the site, the Administrator shall offer, in cooperation with Clean Energy Application Centers operated by the Secretary of Energy, suggestions of optimum means of recovery of value from waste energy stream in the form of electricity, useful thermal energy, or other energy-related products.
(h) Revision. Each annual State report under section 548(a) of the National Energy Conservation Policy Act shall include the results of the survey for that State under this section.
(i) Authorization. There are authorized to be appropriated to the Administrator for the purposes of creating and maintaining the Registry and services authorized by this section not more than $1,000,000 for each of fiscal years 2008, 2009, 2010, 2010, and 2012 and not more than $5,000,000 to the States to provide funding for State energy office functions under this section . section.
374. Waste Energy Recovery Incentive Grant Program.
⋯ Show 73 unchanged paragraphs
(a) Establishment of program. There is established in the Environmental Protection Agency a Waste Energy Recovery Incentive Grant Program to provide incentive grants to owners and operators of projects that successfully produce electricity or incremental useful thermal energy from waste energy recovery (and to utilities purchasing or distributing such electricity) and to reward States that have achieved 80 percent or more of identified waste-heat recovery opportunities.
(b) Grants to projects and utilities.
(1) In general. The Administrator shall make grants to the owners or operators of waste energy recovery projects, and, in the case of excess power purchased or transmitted by a electric utility, to such utility. Grants may only be made upon receipt of proof of waste energy recovery or excess electricity generation, or both, from the project in a form prescribed by the Administrator, by rule.
(2) Excess electric energy. In the case of waste energy recovery, the grants under this section shall be made at the rate of $10 per megawatt hour of documented electricity produced from recovered waste energy (or by prevention of waste energy in the case of a new facility) by the project during the first 3 calendar years of such production, beginning on or after the date of enactment of this Part. If the project produces net excess power and an electric utility purchases or transmits the excess power, 50 percent of so much of such grant as is attributable to the net excess power shall be paid to the electric utility purchasing or transporting the net excess power.
(3) Useful thermal energy. In the case of waste energy recovery that produces useful thermal energy that is used for a purpose different from that for which the project is principally designed, the grants under this section shall be made to the owner or operator of the waste energy recovery project at the rate of $10 for each 3,412,000 Btus of such excess thermal energy used for such different purpose.
(c) Grants to States. In the case of States that have achieved 80 percent or more of waste-heat recovery opportunities identified by the Administrator under this Part, the Administrator shall make grants to the States of up to $1,000 per Megawatt of waste-heat capacity recovered (or its thermal equivalent) to support State-level programs to identify and achieve additional energy efficiency.
(d) Eligibility. The Administrator shall establish rules and guidelines to establish eligibility for grants, shall make the grant program known to those listed in the Registry, and shall offer such grants on the basis of the merits of each project in recovering or preventing waste energy throughout the United States on an impartial, objective, and not unduly discriminatory basis.
(e) Authorization.
(1) There is authorized to be appropriated to the Administrator $100,000,000 for fiscal year 2008, and $200,000,000 for each of fiscal years 2009, 2010, 2011, and 2012 for grants under subsection (b) of this section, and such additional amounts during those years and thereafter as may be necessary for administration of the Waste Energy Recovery Incentive Grant Program.
(2) There is authorized to be appropriated to the Administrator not more than $10,000,000 for each of the first five fiscal years after the enactment of this Part, to be available until expended for purposes of grants to States under subsection (c).
375. Additional incentives for recovery, utilization and prevention of industrial waste energy.
(a) Consideration of standard. Not later than 180 days after the receipt by a State regulatory authority (with respect to each electric utility for which it has ratemaking authority), or nonregulated electric utility, of a request from a project sponsor or owner or operator, the State regulatory authority or nonregulated electric utility shall provide public notice and conduct a hearing respecting the standard established by subsection (b) and, on the basis of such hearing, shall consider and make a determination whether or not it is appropriate to implement such standard to carry out the purposes of this Part. For purposes of any such determination and any review of such determination in any court the purposes of this section supplement otherwise applicable State law. Nothing in this Part prohibits any State regulatory authority or nonregulated electric utility from making any determination that it is not appropriate to adopt any such standard, pursuant to its authority under otherwise applicable State law.
(b) Standard for sales of excess power. For purposes of this section, the standard referred to in subsection (a) shall provide that an owner or operator of a waste energy recovery project identified on the Registry who generates net excess power shall be eligible to benefit from at least one of the options described in subsection (c) for disposal of the net excess power in accordance with the rate conditions and limitations described in subsection (d).
(c) Options. The options referred to in subsection (b) are as follows:
(1) Sale of net excess power to utility. The electric utility shall purchase the net excess power from the owner or operator of the eligible waste-energy recovery project during the operation of the project under a contract entered into for that purpose.
(2) Transport by utility for direct sale to third party. The electric utility shall transmit the net excess power on behalf of the project owner or operator to up to three separate locations on that utility’s system for direct sale by that owner or operator to third parties at such locations.
(3) Transport over private transmission lines. The State and the electric utility shall permit, and shall waive or modify such laws as would otherwise prohibit, the construction and operation of private electric wires constructed, owned and operated by the project owner or operator, to transport such power to up to 3 purchasers within a 3-mile radius of the project, allowing such wires to utilize or cross public rights-of-way, without subjecting the project to regulation as a public utility, and according such wires the same treatment for safety, zoning, land-use and other legal privileges as apply or would apply to the utility’s own wires, except that—
(A) there shall be no grant of any power of eminent domain to take or cross private property for such wires, and
(B) such wires shall be physically segregated and not interconnected with any portion of the utility’s system, except on the customer’s side of the utility’s revenue meter and in a manner that precludes any possible export of such electricity onto the utility system, or disruption of such system.
(4) Agreed upon alternatives. The utility and the owner or operator of the project may reach agreement on any alternate arrangement and its associated payments or rates that is mutually satisfactory and in accord with State law.
(d) Rate conditions and criteria.
(1) In general. The options described in paragraphs (1) and (2) in subsection (c) shall be offered under purchase and transport rate conditions reflecting the rate components defined under paragraph (2) of this subsection as applicable under the circumstances described in paragraph (3) of this subsection.
(2) Rate components. For purposes of this section:
(A) Per unit distribution costs. The term per unit distribution costs means the utility’s depreciated book-value distribution system costs divided by the previous year’s volume of utility electricity sales or transmission at the distribution level in kilowatt hours.
(B) Per unit distribution margin. The term per unit distribution margin means:
(i) In the case of a State regulated electric utility, a per-unit gross pretax profit determined by multiplying the utility’s State-approved percentage rate of return for distribution system assets by the per unit distribution costs.
(ii) In the case of an nonregulated utility, a per unit contribution to net revenues determined by dividing the amount of any net revenue payment or contribution to the nonregulated utility’s owners or subscribers in the prior year by the utility’s gross revenues for the prior year to obtain a percentage (but not less than 10 percent) and multiplying that percentage by the per unit distribution costs.
(C) Per unit transmission costs. The term per unit transmission costs means the total cost of those transmission services purchased or provided by a utility on a per-kilowatt-hour basis as included in that utility's retail rate.
(3) Applicable rates.
(A) Rates applicable to sale of net excess power. Sales made by a project owner or operator under the option described in subsection (c) (1) shall be paid for on a per kilowatt hour basis that shall equal the full undiscounted retail rate paid to the utility for power purchased by such a facility minus per unit distribution costs, as applicable to the type of utility purchasing the power. If the net excess power is made available for purchase at voltages that must be transformed to or from voltages exceeding 25 kilovolts to be available for resale by the utility, then the purchase price shall further be reduced by per unit transmission costs.
(B) Rates applicable to transport by utility for direct sale to third parties. Transportation by utilities of power on behalf of the owner or operator of a project under the option described in subsection (c)(2) shall incur a transportation rate equal to the per unit distribution costs and per unit distribution margin, as applicable to the type of utility transporting the power. If the net excess power is made available for transportation at voltages that must be transformed to or from voltages exceeding 25 kilovolts to be transported to the designated third-party purchasers, then the transport rate shall further be increased by per unit transmission costs. In States with competitive retail markets for electricity, the applicable transportation rate for similar transportation shall be applied in lieu of any rate calculated under this paragraph.
(4) Limitations.
(A) Any rate established for sale or transportation under this section shall be modified over time with changes in the electric utility’s underlying costs or rates, and shall reflect the same time-sensitivity and billing periods as are established in the retail sales or transportation rates offered by the utility.
(B) No utility shall be required to purchase or transport an amount of net excess power under this section that exceeds the available capacity of the wires, meter, or other equipment of the electric utility serving the site unless the owner or operator of the project agrees to pay necessary and reasonable upgrade costs.
(e) Procedural Requirements for Consideration and Determination.
(1) The consideration referred to in subsection (b) shall be made after public notice and hearing. The determination referred to in subsection (b) shall be—
(A) in writing,
(B) based upon findings included in such determination and upon the evidence presented at the hearing, and
(C) available to the public.
(2) The Administrator may intervene as a matter of right in a proceeding conducted under this section and may calculate the energy and emissions likely to be saved by electing to adopt one or more of the options, as well as the costs and benefits to ratepayers and the utility and to advocate for the waste-energy recovery opportunity.
(3) Except as otherwise provided in paragraph (1), and paragraph (2), the procedures for the consideration and determination referred to in subsection (a) shall be those established by the State regulatory authority or the nonregulated electric utility. In the instance that there is more than one project seeking such consideration simultaneously in connection with the same utility, such proceeding may encompass all such projects, provided that full attention is paid to their individual circumstances and merits, and an individual judgment is reached with respect to each project.
(f) Implementation.
(1) The State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility may, to the extent consistent with otherwise applicable State law—
(A) implement the standard determined under this section, or
(B) decline to implement any such standard.
(2) If a State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility declines to implement any standard established by this section, such authority or nonregulated electric utility shall state in writing the reasons therefor. Such statement of reasons shall be available to the public, and the Administrator shall include the project in an annual report to Congress concerning lost opportunities for waste-heat recovery, specifically identifying the utility and stating the amount of lost energy and emissions savings calculated. If a State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility declines to implement the standard established by this section, the project sponsor may submit a new petition under this section with respect to such project at any time after 24 months after the date on which the State regulatory authority or nonregulated utility has declined to implement such standard.
376. Clean Energy Application Centers.
(a) Purpose. The purpose of this section is to rename and provide for the continued operation of the United States Department of Energy’s Regional Combined Heat and Power (CHP) Application Centers.
(b) Findings. The Congress finds the Department of Energy’s Regional Combined Heat and Power (CHP) Application Centers program has produced significant energy savings and climate change benefits and will continue to do so through the deployment of clean energy technologies such as Combined Heat and Power (CHP), recycled waste energy and biomass energy systems, in the industrial and commercial energy markets.
(c) Renaming. The Combined Heat and Power Application Centers at the Department of Energy are hereby be redesignated as Clean Energy Application Centers. Any reference in any law, rule or regulation or publication to the Combined Heat and Power Application Centers shall be treated as a reference to the Clean Energy Application Centers.
(d) Relocation. In order to better coordinate efforts with the separate Industrial Assessment Centers and to assure that the energy efficiency and, when applicable, the renewable nature of deploying mature clean energy technology is fully accounted for, the Secretary of Energy shall relocate the administration of the Clean Energy Application Centers to the Office of Energy Efficiency and Renewable Energy within the Department of Energy. The Office of Electricity Delivery and Energy Reliability shall continue to perform work on the role of such technology in support of the grid and its reliability and security, and shall assist the Clean Energy Application Centers in their work with regard to the grid and with electric utilities.
(e) Grants.
(1) In general. The Secretary of Energy shall make grants to universities, research centers, and other appropriate institutions to assure the continued operations and effectiveness of 8 Regional Clean Energy Application Centers in each of the following regions (as designated for such purposes as of the date of the enactment of this section):
(A) Gulf Coast.
(B) Intermountain.
(C) Mid-Atlantic.
(D) Midwest.
(E) Northeast.
(F) Northwest.
(G) Pacific.
(H) Southeast.
(2) Establishment of goals and compliance. In making grants under this section, the Secretary shall ensure that sufficient goals are established and met by each Center throughout the program duration concerning outreach and technology deployment.
(f) Activities. Each Clean Energy Application Center shall operate a program to encourage deployment of clean energy technologies through education and outreach to building and industrial professionals, and to other individuals and organizations with an interest in efficient energy use. In addition, the Centers shall provide project specific support to building and industrial professionals through assessments and advisory activities. Funds made available under this section may be used for the following activities:
(1) Developing and distributing informational materials on clean energy technologies, including continuation of the eight existing Web sites.
(2) Developing and conducting target market workshops, seminars, internet programs and other activities to educate end users, regulators, and stakeholders in a manner that leads to the deployment of clean energy technologies.
(3) Providing or coordinating onsite assessments for sites and enterprises that may consider deployment of clean energy technology.
(4) Performing market research to identify high profile candidates for clean energy deployment.
(5) Providing consulting support to sites considering deployment of clean energy technologies.
(6) Assisting organizations developing clean energy technologies to overcome barriers to deployment.
(7) Assisting companies and organizations with performance evaluations of any clean energy technology implemented.
(g) Duration. A grant awarded under this section shall be for a period of 5 years. Each grant shall be evaluated annually for its continuation based on its activities and results.
(h) Authorization. There is authorized to be appropriated for purposes of this section the sum of $10,000,000 for each of fiscal years 2008, 2009, 2010, 2011, and 2012.
(b) Table of contents. The table of contents for such Act is amended by inserting the following after the items relating to part D of title III:
SEC. 186. Promoting long-term energy savings performance contracts and verifying savings Modified
⋯ Show 9 unchanged paragraphs
SEC. 186. Promoting long-term energy savings performance contracts and verifying savings. Section 801(a)(2) of the National Energy Conservation Policy Act (42 U.S.C. 8287(a)(2)) is amended—
(1) in subparagraph (D), by inserting “beginning on the date of the delivery order” after “25 years”; and
(2) by adding at the end the following:
(F) Promotion of contracts. In carrying out this section, a Federal agency shall not—
(i) establish a Federal agency policy that limits the maximum contract term under subparagraph (D) to a period shorter than 25 years; or
(ii) limit the total amount of obligations under energy savings performance contracts or other private financing of energy savings measures.
(G) Measurement and verification requirements for private financing.
(i) In general. The evaluations and savings measurement and verification required under paragraphs (1) and (3) of section 543(f) shall be used by a Federal agency to meet the requirements for—
(I) in the case of energy savings performance contracts, the need for energy audits, calculation of energy savings, and any other evaluation of costs and savings needed to implement the guarantee of savings under this section; and
(II) in the case of utility energy service contracts, needs that are similar to the purposes described in subclause (I).
(ii) Modification of existing contracts. Not later than 180 days after the date of enactment of this subparagraph, each Federal agency shall, to the maximum extent practicable, modify any indefinite delivery and indefinite quantity energy savings performance contracts, and other indefinite delivery and indefinite quantity contracts using private financing, to conform to the amendments made by subtitle G of title I of the short title. Energy Efficiency Improvement Act of 2007.