H.R. 2170
112th Congress
Reported by committee
Cutting Federal Red Tape to Facilitate Renewable Energy Act
Streamlining Federal review to facilitate renewable energy projects.
Introduced
Jun 14, 2011
Committee
Oct 14, 2011
Passed House
Next step
Passed Senate
To President
Became law
+0 sections added
−0 removed
~1 modified
=1 unchanged
+26 words ·
−5 words
SEC. 2. Environmental review for renewable energy projects Modified
SEC. 2. Environmental review for renewable energy projects.
(a) Compliance with NEPA for renewable energy projects. In complying with the National Environmental Policy Act of 1969 (41 U.S.C. 4321 et seq.) with respect to any action authorizing or facilitating a proposed renewable energy project, at the election of the applicant a Federal agency shall—
(1) consider only the proposed action and the no action alternative;
⋯ Show 5 unchanged paragraphs
(2) analyze only the proposed action and the no action alternative; and
(3) identify and analyze potential mitigation measures only for the proposed action and the no action alternative.
(b) Public comment. In complying with the National Environmental Policy Act of 1969 with respect to a proposed renewable energy project, a Federal agency shall only consider public comments that specifically address the proposed action or the no action alternative (or both) and are filed within 30 days after publication of a draft environmental assessment or draft environmental impact statement.
(c) Definitions. For purposes of this section:
(1) Federal waters. The term Federal waters means waters seaward of the coastal zone (as that term is defined in section 304 of the Coastal Zone Management Act of 1972 (16 U.S.C. 1453)), to the limits of the exclusive economic zone or the Outer Continental Shelf, whichever is farther.
(2) Outer Continental Shelf. The term Outer Continental Shelf has the meaning the term outer Continental Shelf has in the Outer Continental Shelf Lands Act (43 U.S.C. 1331 et seq.).
(3) Renewable energy project. The term renewable energy project means a project on Federal lands or in Federal waters, including a project on the Outer Continental Shelf, using wind, solar power, geothermal power, biomass, or tidal or kinetic forces marine and hydrokinetic energy to generate energy. energy, that is constructed encouraging the use of equipment and materials manufactured in the United States.