H.R. 2845
112th Congress
Became law
Public Law 112-90
Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011
To amend title 49, United States Code, to provide for enhanced safety and environmental protection in pipeline transportation, to provide for enhanced reliability in the transportation of the Nation's energy products by pipeline, and for other purposes.
Introduced
Sep 7, 2011
Committee
Dec 1, 2011
Passed House
Dec 12, 2011
Passed Senate
Dec 13, 2011
To President
Dec 23, 2011
Became law
Jan 3, 2012
+0 sections added
−11 removed
~20 modified
=1 unchanged
+531 words ·
−3,578 words
SEC. 1. Short title; amendment of title 49, United States Code; definitions; table of contents Modified
SEC. 1. Short title; amendment of title 49, United States Code; definitions; table of contents.
(a) Short title. This Act may be cited as the “Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011”.
(b) Amendment of title 49, United States Code. Except as otherwise expressly provided, whenever in this Act an amendment or repeal is expressed in terms of an amendment to, or a repeal of, a section or other provision, the reference shall be considered to be made to a section or other provision of title 49, United States Code.
(d) Table of contents. The table of contents for this Act is as follows:
SEC. 2. Civil penalties Modified
SEC. 2. Civil penalties.
(a) General penalties; penalty Penalty considerations. Section 60122 is amended—
(1) in subsection (a)(1)—
(A) in the first sentence by striking “$100,000” and inserting “$200,000”; “$175,000”; and
(B) in the last sentence by striking “$1,000,000” and inserting “$2,000,000”; “$1,750,000”; and
(2) in subsection (b)(1)(B) by striking “the ability to pay,”.
(b) Operator assistance Assistance in investigations. Investigations. Section 60118(e) is amended to read as follows:
(e) Operator assistance Assistance in investigations. Investigations.
(1) Assistance and access. If the Secretary or the National Transportation Safety Board investigates an accident or incident involving a pipeline facility, the operator of the facility shall—
(A) make available to the Secretary or the Board all records and information that in any way pertain to the accident or incident, including (including integrity management plans and test results; results); and
(B) afford all reasonable assistance in the investigation of the accident or incident. accident.
(2) Operator assistance in investigations.
(A) In general. The Secretary may impose a civil penalty under section 60122 on a person who obstructs or prevents the Secretary from carrying out inspections or investigations under this chapter.
(B) Obstructs defined. Definitions. In this paragraph, the following definitions apply:
(i) In general. In this paragraph, the Obstructs. The term “obstructs” includes actions that were known, or reasonably should have been known, to prevent, hinder, or impede an investigation without good cause.
(ii) Good cause. In clause (i), the The term “good cause” may include actions such as includes, at a minimum, restricting access to facilities that are not secure or safe for nonpipeline non-pipeline personnel or visitors.
(c) Administrative penalty caps inapplicable. Section 60120(a)(1) is amended by adding at the end the following: “The maximum amount of civil penalties for administrative enforcement actions under section 60122 shall not apply to enforcement actions under this section.”.
(d) Judicial review of administrative enforcement orders. Section 60119(a) is amended—
(1) in the subsection heading by striking “and Waiver Orders” and inserting “, Orders, and Other Final Agency Actions”; and
(2) by striking “about an application for a waiver under section 60118(c) or (d) of this title” and inserting “under this chapter”.
SEC. 3. Pipeline damage prevention Modified
SEC. 3. Pipeline damage prevention.
(a) Minimum standards for State state one-Call notification programs. Section 6103(a) is amended to read as follows:
(a) Minimum standards.
⋯ Show 3 unchanged paragraphs
(1) In general. In order to qualify for a grant under section 6106, a State one-call notification program, at a minimum, shall provide for—
(A) appropriate participation by all underground facility operators, including all government operators;
(B) appropriate participation by all excavators, including all government and contract excavators; and
(C) flexible and effective enforcement under State law with respect to participation in, and use of, one-call notification systems.
(2) Exemptions prohibited. In order to qualify for a grant under section 6106, a State one-call notification program may not exempt municipalities, State agencies, or their contractors from the its one-call notification system requirements of the program. requirements.
(b) State damage prevention programs. Section 60134(a) is amended—
(1) in paragraph (1) by striking “and” after the semicolon;
(2) in paragraph (2)(B) by striking “(b).” and inserting “(b); and”; and
(3) by adding at the end the following:
(3) does not provide any exemptions to municipalities, State agencies, or their contractors from the its one-call notification system requirements of the program. requirements.
(c) Effective date. The amendments made by this section shall take effect 2 years after the date of enactment of this Act.
(d) Excavation Third party damage.
(1) Study. The Secretary of Transportation shall conduct a study on the impact of excavation third party damage on pipeline safety.
(2) Contents. The study shall include—
(A) an analysis of the frequency and severity of different types of excavation third party damage incidents;
(B) an analysis of exemptions to the one-call notification system requirements in each State;
(C) a comparison of exemptions to the one-call notification system requirements in each State to the types of excavation third party damage incidents in that State; and
(D) an analysis of the potential safety benefits and adverse consequences of eliminating all exemptions for mechanized excavation from State one-call notification systems.
(3) Report. Not later than 2 years after the date of enactment of this Act, the Secretary shall submit to the House of Representatives Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives and the Senate Committee on Commerce, Science, and Transportation of the Senate a report on the results of the study.
SEC. 4. Automatic and remote-controlled shut-off valves Modified
SEC. 4. Automatic and remote-controlled shut-off valves. Section 60102 is amended—
(1) by striking subsection (j)(3); and
(2) by adding at the end the following:
(n) Automatic and remote-Controlled shut-off shut-Off valves for new transmission pipelines.
(1) In general. Not later than 2 years after the date of enactment of this subsection, and after considering the factors specified in subsection (b)(2), The Secretary may require by regulation, if determined appropriate by the Secretary, if appropriate, shall require by regulation the use of automatic or remote-controlled shut-off valves, or equivalent technology, where economically, technically, and operationally feasible on transmission pipeline facilities constructed or entirely replaced after the date on which the Secretary issues the final rule containing such requirement.
(2) Factors for consideration. In determining whether to proceed with a rulemaking under paragraph (1), the Secretary shall consider the factors specified in subsection (b)(2).
SEC. 5. Integrity management Modified
SEC. 5. Integrity management.
(a) Evaluation. Not later than 18 months 2 years after the date of enactment of this Act, the Secretary of Transportation shall evaluate—
(1) whether integrity management system requirements, or elements thereof, should be expanded beyond high-consequence high consequence areas; and
(2) with respect to gas transmission pipeline facilities, whether applying integrity management program requirements, or elements thereof, to additional areas would mitigate the need for class location requirements.
(b) Factors. Repair criteria. In conducting the evaluation under subsection (a), the Secretary shall consider, at a minimum, the following: consider applying repair criteria, such as pressure reductions and special requirements for scheduling remediation, to areas that are not high consequence areas.
(c) Report. Not later than 2 years after Based on the date of enactment of this Act, evaluation to be conducted under subsection (a), the Secretary shall submit to the House of Representatives Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives and the Senate Committee on Commerce, Science, and Transportation of the Senate a report, based on the evaluation conducted under subsection (a), report containing the Secretary’s analysis and findings regarding—
(1) expansion of integrity management requirements, or elements thereof, beyond high-consequence high consequence areas; and
(2) with respect to gas transmission pipeline facilities, whether applying the integrity management program requirements, or elements thereof, to additional areas would mitigate the need for class location requirements.
(d) Data reporting. The Secretary shall collect any relevant data necessary to complete the evaluation required by subsection (a).
(e) Technical correction. Section 60109(c)(3)(B) is amended to read as follows:
(B) Subject to paragraph (5), periodic reassessments of the facility, at a minimum of once every 7 calendar years, using methods described in subparagraph (A). The Secretary may extend such Such deadline shall be extended for an additional 6 months if the operator submits written notice to the Secretary with sufficient justification that includes an explanation of the need for the extension.
(f) Rulemaking requirements.
(1) Review period defined. In this subsection, the term “review period” means the period beginning on the date of enactment of this Act and ending on the earlier of—
(A) the date that is 1 year after the date of completion of the report under subsection (c); or
(B) the date that is 3 years after the date of enactment of this Act.
(2) Congressional authority. In order to provide Congress the necessary time to review the results of the report required by subsection (c) and implement appropriate recommendations, the Secretary shall not, during the review period, issue final proceed with a rulemaking to prescribe regulations described in paragraph (3)(B). (3).
(3) Standards. Following the review period, the Secretary may, as appropriate, prescribe regulations that—
(4) Savings clause.
(A) In general. Notwithstanding any other provision of this subsection, the Secretary, during the review period, may issue final proceed to a rulemaking to prescribe regulations described in paragraph (3)(B), (3), and may prescribe the regulations, if the Secretary determines that a condition that poses a risk to public safety, property, or the environment is present or an imminent hazard exists and that the regulations rulemaking will address the risk or hazard.
(B) Imminent hazard defined. In subparagraph (A), the term “imminent hazard” means the existence of a condition related to pipelines or pipeline operations that presents a substantial likelihood that death, serious illness, severe personal injury, or substantial endangerment to health, property, or the environment may occur.
(g) Report to Congress on risk-Based pipeline reassessment intervals. Not later than 2 years after the date of enactment of this Act, the Comptroller General of the United States shall evaluate—
(1) whether risk-based reassessment intervals are a more effective alternative for managing risks to pipelines in high-consequence areas once baseline assessments are complete when compared to the a 7-year reassessment interval specified in section 60109(c)(3)(B) of title 49, United States Code; interval;
(2) the number of anomalies found in baseline assessments required under section 60109(c)(3)(A) of title 49, United States Code, as compared to the number of anomalies found in reassessments required under section 60109(c)(3)(B) of such title; and
(3) the progress made in implementing incorporating the recommendations in GAO Report 06–945 and the current relevance of those recommendations that have not been implemented. incorporated to date.
(h) High consequence area defined. In this section, the term “high consequence area” means an area described in section 60109(a) of title 49, United States Code.
SEC. 6. Public education and awareness Modified
SEC. 6. Public education and awareness.
(a) National pipeline mapping system. Section 60132 is amended by adding at the end the following:
(b) Information to emergency response agencies.
(1) Guidance. Not later than 18 months after the date of enactment of this Act, the Secretary shall issue guidance to owners and operators of pipeline facilities on the importance of providing system-specific information about their pipeline facilities to emergency response agencies of the communities and jurisdictions in which those facilities are located.
(2) Consultation. Before issuing guidance under paragraph (1), the Secretary shall consult with owners and operators of pipeline facilities to determine the extent to which the owners and operators are already providing system-specific information about their pipeline facilities to emergency response agencies.
SEC. 7. Cast iron gas pipelines Modified
SEC. 7. Cast iron gas pipelines.
(a) Follow-Up surveys. Section 60108(d) is amended by adding at the end the following:
(4) Not later than December 31, 2012, and every 2 years thereafter, the Secretary shall conduct a follow-up survey to measure the progress that owners and operators of pipeline facilities have made in adopting and implementing their plans for the safe management and replacement of cast iron gas pipelines.
(b) Status report. Not later than December 31, 2013, the Secretary of Transportation shall transmit to the House of Representatives Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives and the Senate Committee on Commerce, Science, and Transportation of the Senate a report that—
(1) identifies the total mileage of cast iron gas pipelines in the United States; and
(2) evaluates the progress that owners and operators of pipeline facilities have made in implementing their plans for the safe management and replacement of cast iron gas pipelines.
SEC. 8. Leak detection Modified
SEC. 8. Leak detection.
(a) Leak detection report.
(1) In general. Not later than 1 year after the date of enactment of this Act, the Secretary of Transportation shall submit to the Senate Committee on Commerce, Science, and Transportation of the Senate and the House of Representatives Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives a report on leak detection systems utilized by operators of hazardous liquid pipeline facilities and transportation-related flow lines.
(2) Contents. The report shall include—
(A) an analysis of the technical limitations of current leak detection systems, including the systems’ ability of the systems to detect ruptures and small leaks that are ongoing or intermittent, and what can be done to foster development of better technologies; and
(B) an analysis of the practicability feasibility of establishing technically, operationally, and economically feasible standards for the capability of such systems to detect leaks, and the safety benefits and adverse consequences of requiring operators to use leak detection systems.
(b) Rulemaking requirements.
(1) Review period defined. In this subsection, the term “review period” means the period beginning on the date of enactment of this Act and ending on the earlier of—
(A) the date that is 1 year after the date of completion of the report under subsection (a); or
(B) the date that is 2 years after the date of enactment of this Act.
(2) Congressional authority. In order to provide Congress the necessary time to review the results of the report required by subsection (a) and implement appropriate recommendations, the Secretary, Secretary shall not, during the review period, shall not issue final proceed with a rulemaking to prescribe regulations described in paragraph (3).
(3) Standards. As soon as practicable following Following the review period, if the report required by subsection (a) finds that it is practicable to establish technically, operationally, and economically feasible standards for the capability of leak detection systems to detect leaks, the Secretary shall issue final may, as appropriate, prescribe regulations that—
(A) require operators of hazardous liquid pipeline facilities to use leak detection systems where practicable; systems; and
(B) establish technically, operationally, and economically feasible standards for the capability of such systems to detect leaks.
(4) Savings clause.
(A) In general. Notwithstanding any other provision of this subsection, the Secretary, during the review period, may issue final proceed to a rulemaking to prescribe regulations described in paragraph (3) (3), and may prescribe the regulations, if the Secretary determines that a condition that poses a risk to public safety, property, or the environment is present or an imminent hazard exists and that the regulations rulemaking will address the risk or hazard.
(B) Imminent hazard defined. In subparagraph (A), the term “imminent hazard” means the existence of a condition related to pipelines or pipeline operations that presents a substantial likelihood that death, serious illness, severe personal injury, or substantial endangerment to health, property, or the environment may occur.
SEC. 9. Accident and incident notification Modified
SEC. 9. Accident and incident notification.
(a) Revision of regulations. Not later than 18 months after the date of enactment of this Act, the Secretary of Transportation shall revise regulations issued under sections 191.5 and 195.52 of title 49, Code of Federal Regulations, to establish specific time limits for telephonic or electronic notice of accidents and incidents involving pipeline facilities to the Secretary and the National Response Center.
(b) Minimum requirements. In revising the regulations, the Secretary, at a minimum, shall—
(1) establish time limits for telephonic or electronic notification of an accident or incident to require such notification at the earliest practicable moment following confirmed discovery of an accident or incident and not later less than 1 hour following and not more than 2 hours after discovery of the time of such confirmed discovery; accident or incident;
(2) review procedures for owners and operators of pipeline facilities and the National Response Center to provide thorough and coordinated notification to all relevant State and local emergency response officials, including 911 emergency call centers, for the jurisdictions in which those pipeline facilities are located in the event of an accident or incident, and revise such procedures as appropriate; and
(3) require such owners and operators to revise their initial telephonic or electronic notice to the Secretary and the National Response Center with an estimate of the estimated amount of the product released, an estimate of the estimated number of fatalities and injuries, if any, and any other information determined appropriate by the Secretary within 24 to 48 hours of the accident or incident, to the extent practicable.
(c) Updating of reports. After receiving revisions described in subsection (b)(3), the National Response Center shall update the initial report on an accident or incident instead of generating a new report.
SEC. 11. Pipeline infrastructure data collection Removed
SEC. 11. Transportation-related oil flow lines Modified
SEC. 12. 11. Transportation-related oil flow lines. Section 60102, as amended by this Act, is further amended by adding at the end the following:
(o) Transportation-Related oil flow lines.
(1) Data collection. The Secretary may collect geospatial or technical data on transportation-related oil flow lines, including unregulated transportation-related oil flow lines.
(2) Transportation-related oil flow line defined. In this subsection, the term “transportation-related transportation-related oil flow line” line means a pipeline transporting oil off of the grounds of the well where it originated and across areas not owned by the producer, regardless of the extent to which the oil has been processed, if at all.
(3) Limitation. Nothing in this subsection authorizes the Secretary to prescribe standards for the movement of oil through production, refining, or manufacturing facilities facilities, or through oil production flow lines located on the grounds of wells.
SEC. 12. Cost recovery for design reviews Modified
SEC. 13. 12. Cost recovery for design reviews.
(a) In general. Section 60117(n) is amended to read as follows:
(n) Cost recovery for design reviews.
(1) In general.
(A) Review costs. For any project described in subparagraph (B), if the Secretary conducts facility design safety reviews in connection with a proposal to construct, expand, or operate a new gas or hazardous liquid pipeline facility or liquefied natural gas pipeline facility, including construction inspections and oversight, the Secretary may require the person proposing the project to pay the costs incurred by the Secretary relating to such reviews. If the Secretary exercises the cost recovery authority described in this paragraph, subsection, the Secretary shall prescribe a fee structure and assessment methodology that is based on the costs of providing these reviews and shall prescribe procedures to collect fees under this paragraph. subsection. The Secretary may shall not collect design safety review fees under this paragraph chapter and section 60301 for the same design safety review.
(B) Projects to which applicable. Subparagraph (A) applies to any project that—
(i) has design and construction costs totaling at least $2,500,000,000, $3,400,000,000, as periodically adjusted for inflation, based on a good faith estimate developed by the Secretary to take into account increases in person proposing the Consumer Price Index for all-urban consumers published by the Department of Labor, based on— project; or
(ii) uses new or novel technologies or design, as determined by the Secretary. design.
(2) Notification. For any new pipeline facility construction project in for which the Secretary will conduct design reviews, the person proposing the project shall notify the Secretary and provide the design specifications, construction plans and procedures, and related materials at least 120 days prior to the commencement of construction. To If the maximum extent practicable, not later than 90 days after receiving such Secretary determines that the proposed design specifications, construction plans and procedures, and related materials, of the project is inconsistent with pipeline safety, the Secretary shall provide written comments, feedback, and guidance on the project on or before the 60th day following the date of receipt of the design specifications, construction plans and procedures, and related materials for the project.
(3) Pipeline Safety Design Review Fund.
(A) Establishment. There is established a Pipeline Safety Design Review Fund in the Treasury of the United States.
(B) Deposits. The Secretary shall deposit funds paid under this subsection into the Fund.
(C) Use. Amounts in the Fund shall be available to the Secretary, in amounts specified in appropriations Acts, to offset the costs of conducting facility design safety reviews under this subsection.
(4) No additional permitting authority. Nothing in this subsection may shall be construed as authorizing the Secretary to require a person to obtain a permit before beginning design and construction in connection with a project described in paragraph (1)(B).
(b) Guidance. Not later than 1 year after the date of enactment of this Act, the Secretary of Transportation shall issue guidance to clarify the meaning of the term “new new or novel technologies or design” design as used in section 60117(n)(1)(B)(ii) 60117(n) of title 49, United States Code, as amended by subsection (a) of this section.
SEC. 13. Biofuel pipelines Modified
SEC. 14. 13. Biofuel pipelines. Section 60101(a)(4) is amended—
(1) in subparagraph (A) by striking “and” after the semicolon;
(2) by redesignating subparagraph (B) as subparagraph (C); and
(3) by inserting after subparagraph (A) the following:
(B) nonpetroleum fuel, non-petroleum fuels, including biofuel, biofuels, that is are flammable, toxic, or corrosive or would be harmful to the environment if released in significant quantities; and
SEC. 14. Carbon dioxide pipelines Modified
SEC. 15. 14. Carbon dioxide pipelines. Section 60102(i) is amended— amended to read as follows:
(i) Pipelines transporting carbon dioxide.
SEC. 15. Study of transportation of diluted bitumen Modified
SEC. 16. 15. Study of transportation of diluted bitumen. Not later than 18 months after the date of enactment of this Act, the Secretary of Transportation shall complete a comprehensive review of hazardous liquid pipeline facility regulations to determine whether the these regulations are sufficient to regulate pipeline facilities used for the transportation of diluted bitumen. In conducting the this review, the Secretary shall conduct an analysis of whether any increase in the risk of a release exists for pipeline facilities transporting diluted bitumen. The Secretary shall report the results of the this review to the Senate Committee on Commerce, Science, and Transportation of the Senate and the House of Representatives Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives. Commerce.
SEC. 16. Study of non-petroleum hazardous liquids transported by pipeline Modified
SEC. 17. 16. Study of nonpetroleum non-petroleum hazardous liquids transported by pipeline. The Secretary of Transportation may conduct an analysis of the transportation of nonpetroleum non-petroleum hazardous liquids by pipeline facility for the purpose of identifying the extent to which pipeline facilities are currently being used to transport nonpetroleum non-petroleum hazardous liquids, such as chlorine, from chemical production facilities across land areas not owned by the producer that are accessible to the public. The analysis should identify the extent to which the safety of the pipeline facilities is unregulated by the States and evaluate whether the transportation of such chemicals by pipeline facility across areas accessible to the public would present significant risks to public safety, property, or the environment in the absence of regulation. The results of the analysis shall be made available to the Senate Committee on Commerce, Science, and Transportation of the Senate and the House of Representatives Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives. Commerce.
SEC. 17. Clarifications Modified
SEC. 18. 17. Clarifications.
(a) Inspection and maintenance. Amendment of procedures clarification. Section 60108(a)(1) is amended by striking “an intrastate” and inserting “a”.
(b) Owner and operator. operator clarification. Section 60102(a)(2)(A) is amended by striking “owners and operators” and inserting “any or all of the owners or operators”.
SEC. 18. Maintenance of effort Modified
SEC. 19. 18. Maintenance of effort. Section 60107(b) is amended by adding at the end the following: “For each of fiscal years 2012 and 2013, the Secretary shall grant such a waiver wavier to a State if the State can demonstrate an inability to maintain or increase the required funding share of its pipeline safety program at or above the level required by this subsection due to economic hardship in that State. For fiscal year 2014, 2014 and each fiscal year thereafter, the Secretary may grant such a waiver to a State if the State can make the demonstration described in the preceding sentence.”.
SEC. 19. Administrative enforcement process Modified
SEC. 20. 19. Administrative enforcement process.
(a) Issuance of regulations.
(1) In general. Not later than 2 years after the date of enactment of this Act, the Secretary of Transportation shall issue prescribe regulations—
(A) requiring hearings under sections 60112, 60117, 60118, and 60122 of title 49, United States Code, to be convened before a presiding official;
(B) providing the opportunity for any person requesting a hearing under section 60112, 60117, 60118, or 60122 of such title to arrange for a transcript of the that hearing, at the expense of the requesting person;
(C) ensuring expedited review of any order issued pursuant to section 60112(e) of such title; 60112(e);
(D) implementing a separation of functions between personnel involved with the investigation investigative and prosecution of an enforcement case prosecutorial activities and advising the Secretary on findings and determinations; and
(E) prohibiting ex-parte communication relevant to the question to be decided in such a the case by parties to an investigation or hearing.
(2) Presiding official. The regulations issued prescribed under this subsection shall—
(A) define the term “presiding official” presiding official to mean the person who conducts any hearing relating to civil penalty assessments, compliance orders, safety orders, or corrective action orders; and
(B) require that the presiding official must be an attorney on the staff of the Deputy Chief Counsel of the Pipeline and Hazardous Materials Safety Administration that is not engaged in investigative or prosecutorial functions, including the preparation of notices of probable violations, notices relating to civil penalty assessments, notices relating to compliance, or notices of proposed corrective actions.
(3) Expedited review. The regulations issued prescribed under this subsection shall define the term “expedited review” expedited review for the purposes of paragraph (1)(C).
(b) Standards of judicial review. Section 60119(a) is amended by adding at the end the following new paragraph:
(3) A judicial review of agency action under this section shall apply the standards of review established in section 706 of title 5.
SEC. 20. Gas and hazardous liquid gathering lines Modified
SEC. 21. 20. Gas and hazardous liquid gathering lines.
(a) Review. The Secretary of Transportation shall conduct complete a review of existing Federal and State regulations for gas and hazardous liquid gathering lines located onshore and offshore in the United States, including within the inlets of the Gulf of Mexico.
(b) Report to Congress.
(1) In general. Not later than 2 years after the date of enactment of this Act, the Secretary shall submit to the House of Representatives Committee on Transportation and Infrastructure and the Committee on Energy and Commerce of the House of Representatives and the Senate Committee on Commerce, Science, and Transportation of the Senate a report on the results of the review.
(2) Recommendations. The report shall include the Secretary’s recommendations with respect to—
(A) the sufficiency of existing Federal and State laws and regulations to ensure the safety of gas and hazardous liquid gathering lines;
(B) quantifying the economic impacts, economical and technical practicability, practicability and challenges of applying existing Federal regulations to gathering lines that are currently not currently subject to Federal regulation when compared to the public safety benefits; and
(C) subject to a risk-based assessment, the need to modify or revoke existing exemptions from Federal regulation for gas and hazardous liquid gathering lines.
SEC. 22. Excess flow valves Removed
SEC. 23. Maximum allowable operating pressure Removed
SEC. 24. Limitation on incorporation of documents by reference Removed
SEC. 25. Pipeline safety training for State and local government personnel Removed
SEC. 26. Report on minority-owned, woman-owned, and disadvantaged businesses Removed
SEC. 27. Report on pipeline projects Removed
SEC. 28. Cover over buried pipelines Removed
SEC. 29. Seismicity Removed
SEC. 30. Tribal consultation for pipeline projects Removed
SEC. 31. Pipeline inspection and enforcement needs Removed
SEC. 21. Authorization of appropriations Modified
SEC. 32. 21. Authorization of appropriations.
(a) Gas and hazardous liquid. Section 60125(a) is amended to read as follows:
(a) Gas and hazardous liquid.
(1) In general. To carry out the provisions of this chapter related to gas and hazardous liquid and section 12 of the Pipeline Safety Improvement Act of 2002 (49 U.S.C. 60101 note; Public Law 107–355), there is authorized to be appropriated to the Department of Transportation for each of fiscal years 2012 through 2015, from fees collected under section 60301, $90,679,000, $88,014,000, of which $4,746,000 $4,686,000 is for carrying out such section 12 and $36,194,000 $34,461,000 is for making grants.
(2) Trust fund amounts. In addition to the amounts authorized to be appropriated by paragraph (1), there is authorized to be appropriated for each of fiscal years 2012 through 2015 from the Oil Spill Liability Trust Fund to carry out the provisions of this chapter related to hazardous liquid and section 12 of the Pipeline Safety Improvement Act of 2002 (49 U.S.C. 60101 note; Public Law 107–355), $18,573,000, $18,905,000, of which $2,174,000 $2,185,000 is for carrying out such section 12 and $4,558,000 $4,985,000 is for making grants.
(b) Emergency response grants. Section 60125(b)(2) is amended by striking “2007 through 2010” and inserting “2012 through 2015”.
⋯ Show 4 unchanged paragraphs
(c) One-Call notification programs. Section 6107 is amended—
(1) in subsection (a) by striking “2007 through 2010.” and inserting “2012 through 2015.”;
(2) in subsection (b) by striking “2007 through 2010.” and inserting “2012 through 2015.”; and
(3) by striking subsection (c).
(d) State damage prevention programs. Section 60134 is amended by adding at the end the following:
(i) Authorization of Appropriations. appropriations. There is authorized to be appropriated to the Secretary to provide grants under this section $1,500,000 for each of fiscal years 2012 through 2015. Such funds shall remain available until expended.
(e) Community pipeline safety information grants. Section 60130 is amended—
(1) in subsection (a)(1) by striking “$50,000” and inserting “$100,000”; (b)—
(A) by inserting “to grant recipients and their contractors” after “this section”; and
(B) by inserting “, for direct any type of advocacy activity for or against a pipeline construction or expansion project,” after “for lobbying”; and
(f) Pipeline transportation research and development. Section 12 of the Pipeline Safety Improvement Act of 2002 (49 U.S.C. 60101 note) is amended—
(1) in subsection (d) by adding at the end the following:
(3) Ongoing pipeline transportation research and development.
(A) In general. After the initial 5-year program plan has been carried out by the participating agencies, the Secretary of Transportation, in coordination with the Director of the National Institute of Standards and Technology, as appropriate, Transportation shall prepare a research and development program plan every 5 years thereafter and shall transmit a report to Congress on the status and results-to-date of implementation of the program every 2 years. The biennial report shall include a summary of updated research needs and priorities identified through the consultation requirements of paragraph (2).
(B) Consultation. The Secretary of Transportation shall comply with the consultation requirements of paragraph (2) subsection (d)(2) when preparing the program plan and in the selection and prioritization of research and development projects.
(C) Funding from non-Federal sources. When carrying out research and development activities, the Secretary, to the greatest extent practicable, shall obtain funding for research and development projects from non-Federal sources.
; and
(2) in subsection (f) by striking “2003 through 2006.” and inserting “2012 through 2015.”.