H.R. 795 112th Congress Reported by committee
Congress.gov ↗

Small-Scale Hydropower Enhancement Act of 2011

To expand small-scale hydropower.

Introduced Feb 18, 2011
Committee Sep 23, 2011
Passed Senate  
To President  
Became law  
SEC. 1. Short title. This Act may be cited as the “Small-Scale Hydropower Enhancement Act of 2011”.
SEC. 2. Definitions. In this Act:
(1) Conduit. The term conduit means any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
(2) Secretary. The term Secretary means the Secretary of the Interior.
SEC. 3. Applicability of law. Notwithstanding any other provision of law, a hydroelectric project that uses only a non-federally owned conduit to generate electric power that does not exceed 1.5 megawatts and that, on or before the date of enactment of this Act, is not licensed under, or exempted from the license requirements contained in, part I of the Federal Power Act (16 U.S.C. 792 et seq.) shall not be required to be licensed under part I of such Act.
SEC. 4. Inclusion of certain facilities in report and study. The Secretary shall—
(1) not later than 6 months after the date of enactment of this Act, revise and update the study and report required under section 1834 of the Energy Policy Act of 2005 (Public Law 109–58) to include facilities that would result in less than 1 megawatt of capacity;
(2) to the maximum extent practicable, consult with non-Federal and noncontracting interests in implementing this section; and
(3) implement this section on a nonreimbursable basis.