H.R. 1963
113th Congress
Passed House
Bureau of Reclamation Conduit Hydropower Development Equity and Jobs Act
To amend the Water Conservation and Utilization Act to authorize the development of non-Federal hydropower and issuance of leases of power privileges at projects constructed pursuant to the authority of the Water Conservation and Utilization Act, and for other purposes.
Introduced
May 14, 2013
Committee
Oct 22, 2013
Passed House
Dec 3, 2013
Passed Senate
Next step
To President
Became law
+2 sections added
−0 removed
~1 modified
=1 unchanged
+508 words ·
−84 words
SEC. 2. Amendment Modified
SEC. 2. Amendment. Section 9 of the Act entitled “An Act authorizing construction of water conservation and utilization projects in the Great Plains and arid semiarid areas of the United States”, approved August 11, 1939 (16 U.S.C. 590z–7; commonly known as the “Water Conservation and Utilization Act”), is amended—
(1) by striking “In connection with” and inserting “(a) In connection with”; and
(b) The Notwithstanding subsection (a), the Secretary is authorized to enter into leases of power privileges for electric power generation in connection with any project constructed under this Act, and shall have authority in addition to and alternative to any authority in existing laws related relating to particular projects, including small conduit hydropower development, consistent with the terms of this Act, the Reclamation Project Act of 1939 (43 U.S.C. 485h), and other Federal reclamation laws. development.
(c) When entering into leases of power privileges under subsection (b), the Secretary shall use the processes applicable to such leases under section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)).
(d) Lease of power privilege contracts shall be at such rates as, in the Secretary’s judgment, will produce revenues at least sufficient to cover the appropriate share of the annual operation and maintenance cost of the project and such fixed charges, including interest, as the Secretary deems proper. Lease of power privilege contracts shall be for periods not to exceed 40 years.
(e) No findings under section 3 shall be required for a lease under subsection (b).
(f) All right, title, and interest to installed power facilities constructed by non-Federal entities pursuant to a lease of power privilege, and direct revenues derived therefrom, shall remain with the lessee unless otherwise required under subsection (g).
(g) Notwithstanding section 8, lease revenues and fixed charges, if any, shall be covered into the Reclamation Fund to be credited to the project from which those revenues or charges were derived.
(1) Conduit. The term conduit means any Bureau of Reclamation tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
(2) Irrigation district. The term irrigation district means any irrigation, water conservation or conservancy, multi-county water conservation or conservancy district, or any separate public entity composed of two or more such districts and jointly exercising powers of its member districts.
(3) Reserved conduit. The term reserved conduit means any conduit that is included in project works the care, operation, and maintenance of which has been reserved by the Secretary, through the Commissioner of the Bureau of Reclamation.
(4) Transferred conduit. The term transferred conduit means any conduit that is included in project works the care, operation, and maintenance of which has been transferred to a legally organized water users association or irrigation district.
(5) Small conduit hydropower. The term small conduit hydropower means a facility capable of producing 5 megawatts or less of electric capacity.
SEC. 1. Short title Added
SEC. 1. Short title. This Act may be cited as the “Bureau of Reclamation Hydropower Development Equity and Jobs Act”.
SEC. 2. Amendment Added
SEC. 2. Amendment. Section 9 of the Act of August 11, 1939 (commonly known as the “Water Conservation and Utilization Act”) (16 U.S.C. 590z–7) is amended—
(1) by striking “In connection with” and inserting “(a) In general.—In connection with”; and
(2) by adding at the end the following:
(b) Certain leases authorized.
(1) In general. Notwithstanding subsection (a), the Secretary—
(A) may enter into leases of power privileges for electric power generation in connection with any project constructed pursuant to this Act; and
(B) shall have authority over any project constructed pursuant to this Act in addition to and alternative to any existing authority relating to a particular project.
(2) Process. In entering into a lease of power privileges under paragraph (1), the Secretary shall use the processes, terms, and conditions applicable to the lease under section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)).
(3) Findings not required. No findings under section 3 shall be required for a lease under paragraph (1).
(4) Rights retained by lessee. Except as otherwise provided under paragraph (5), all right, title, and interest in and to installed power facilities constructed by non-Federal entities pursuant to a lease under paragraph (1), and any direct revenues derived from that lease, shall remain with the lessee.
(5) Lease charges. Notwithstanding section 8, lease charges shall be credited to the project from which the power is derived.
(6) Effect. Nothing in this section alters or affects any agreement in effect on the date of enactment of the Bureau of Reclamation Hydropower Development Equity and Jobs Act for the development of hydropower projects or disposition of revenues.