H.R. 267
113th Congress
Became law
Public Law 113-23
Hydropower Regulatory Efficiency Act of 2013
To improve hydropower, and for other purposes.
Introduced
Jan 15, 2013
Committee
Feb 4, 2013
Passed House
Feb 13, 2013
Passed Senate
Aug 1, 2013
To President
Aug 6, 2013
Became law
Aug 9, 2013
+2 sections added
−0 removed
~7 modified
=0 unchanged
+134 words ·
−89 words
Appropriations Added
Hydropower Regulatory Efficiency Actof 2013.16 USC 791a note.
SECTION 1. SHORT TITLE; TABLE OF CONTENTS. Modified
(a) Short title. Title.— This Act may be cited as the “Hydropower Regulatory Efficiency Act of 2013”.
(b) Table of contents. Contents.— The table of contents of this Act is as follows:
SEC. 2. FINDINGS. Modified
SEC. 2. Findings. FINDINGS. 16 USC 791 note prec. Congress finds that—
(1) the hydropower industry currently employs approximately 300,000 workers across the United States;
⋯ Show 6 unchanged paragraphs
(2) hydropower is the largest source of clean, renewable electricity in the United States;
(3) as of the date of enactment of this Act, hydropower resources, including pumped storage facilities, provide—
(A) nearly 7 percent of the electricity generated in the United States; and
(B) approximately 100,000 megawatts of electric capacity in the United States;
(4) only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for adding hydropower generation to nonpowered dams; and
(5) according to one study, by utilizing currently untapped resources, the United States could add approximately 60,000 megawatts of new hydropower capacity by 2025, which could create 700,000 new jobs over the next 13 years.
SEC. 3. PROMOTING SMALL HYDROELECTRIC POWER PROJECTS. Modified
SEC. 3. Promoting small hydroelectric power projects. PROMOTING SMALL HYDROELECTRIC POWER PROJECTS. Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2705) is amended by striking “5,000” and inserting “10,000”. “10,000”.127 STAT. 494
SEC. 4. PROMOTING CONDUIT HYDROPOWER PROJECTS. Modified
SEC. 4. Promoting conduit hydropower projects. PROMOTING CONDUIT HYDROPOWER PROJECTS.
(a) Applicability of, and exemption from, licensing requirements. Exemption From, Licensing Requirements.— Section 30 of the Federal Power Act (16 U.S.C. 823a) is amended—
(1) by striking subsections (a) and (b) and inserting the following:
(1) A qualifying conduit hydropower facility shall not be required to be licensed under this part.
(A) Notice. Any person, State, or municipality proposing to construct a qualifying conduit hydropower facility shall file with the Commission a notice of intent to construct such facility. The notice shall include sufficient information to demonstrate that the facility meets the qualifying criteria.
(2) in subsection (c), by striking “subsection (a)” and inserting “subsection (b)”; and
(3) in subsection (d), by striking “subsection (a)” and inserting “subsection (b)”.
(b) Conforming amendment. Amendment.— Subsection (d) of section 405 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2705), as amended, is further amended by striking “subsection (a) of such section 30” and inserting “subsection (b) of such section 30”.
SEC. 5. FERC AUTHORITY TO EXTEND PRELIMINARY PERMIT PERIODS. Modified
SEC. 5. FERC authority to extend preliminary permit periods. AUTHORITY TO EXTEND PRELIMINARY PERMIT PERIODS. Section 5 of the Federal Power Act (16 U.S.C. 798) is amended—
(1) by designating the first, second, and third sentences as subsections (a), (c), and (d), respectively; and
(2) by inserting after subsection (a) (as so designated) the following:
SEC. 6. PROMOTING HYDROPOWER DEVELOPMENT AT NONPOWERED DAMS AND CLOSED LOOP PUMPED STORAGE PROJECTS. Modified
SEC. 6. Promoting hydropower development at nonpowered dams and closed loop pumped storage projects. PROMOTING HYDROPOWER DEVELOPMENT AT NONPOWERED DAMS AND CLOSED LOOP PUMPED STORAGE PROJECTS. 16 USC 797 note.
(a) In general. General.— Time period. To improve the regulatory process and reduce delays and costs for hydropower development at nonpowered dams and closed loop pumped storage projects, the Federal Energy Regulatory Commission (referred to in this section as the Commission) “Commission”) shall investigate the feasibility of the issuance of a license for hydropower development at nonpowered dams and closed loop pumped storage projects in a 2-year period (referred to in this section as a 2-year process). “2-year process”). Such a 2-year process shall include any prefiling licensing process of the Commission.
(b) Workshops and pilots. Pilots.— Deadlines. The Commission shall—
(1) not later than 60 days after the date of enactment of this Act, hold an initial workshop to solicit public comment and recommendations on how to implement a 2-year process;
(2) Criteria. develop criteria for identifying projects featuring hydropower development at nonpowered dams and closed loop pumped storage projects that may be appropriate for licensing within a 2-year process;
(3) not later than 180 days after the date of enactment of this Act, develop and implement pilot projects to test a 2-year process, if practicable; and
(4) not later than 3 years after the date of implementation of the final pilot project testing a 2-year process, hold a final workshop to solicit public comment on the effectiveness of each tested 2-year process.
(c) Memorandum of understanding. Understanding.— The Commission shall, to the extent practicable, enter into a memorandum of understanding with any applicable Federal or State agency to implement a pilot project described in subsection (b).
(d) Reports. Reports.— 127 STAT. 496
(1) Pilot projects not implemented. implemented.— Determination. If the Commission determines that no pilot project described in subsection (b) is practicable because no 2-year process is practicable, not later than 240 days after the date of enactment of this Act, the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—
(A) describes the public comments received as part of the initial workshop held under subsection (b)(1); and
(B) identifies the process, legal, environmental, economic, and other issues that justify the determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.
(2) Pilot projects implemented. implemented.— If the Commission develops and implements pilot projects involving a 2-year process, not later than 60 days after the date of completion of the final workshop held under subsection (b)(4), the Commission shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that—
(A) describes the outcomes of the pilot projects;
⋯ Show 5 unchanged paragraphs
(B) describes the public comments from the final workshop on the effectiveness of each tested 2-year process; and
(C)
(i) outlines how the Commission will adopt policies under existing law (including regulations) that result in a 2-year process for appropriate projects;
(ii) outlines how the Commission will issue new regulations to adopt a 2-year process for appropriate projects; or
(iii) identifies the process, legal, environmental, economic, and other issues that justify a determination of the Commission that no 2-year process is practicable, with recommendations on how Congress may address or remedy the identified issues.
SEC. 7. DOE STUDY OF PUMPED STORAGE AND POTENTIAL HYDROPOWER FROM CONDUITS. Modified
SEC. 7. DOE study of pumped storage and potential hydropower from conduits. STUDY OF PUMPED STORAGE AND POTENTIAL HYDROPOWER FROM CONDUITS.
(a) In general. General.— The Secretary of Energy shall conduct a study—
(1)
⋯ Show 4 unchanged paragraphs
(A) of the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such existing facilities to be upgraded or retrofitted with advanced commercially available technology; and
(B) of the technical potential of existing pumped storage facilities and new advanced pumped storage facilities, to provide grid reliability benefits; and
(2)
(A) to identify the range of opportunities for hydropower that may be obtained from conduits (as defined by the Secretary) in the United States; and
(B) through case studies, to assess amounts of potential energy generation from such conduit hydropower projects.
(b) Report. Report.— Not later than 1 year after the date of enactment of this Act, the Secretary of Energy shall submit to the Committee 127 STAT. 497 on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that describes the results of the study conducted under subsection (a), including any recommendations.
Appropriations Added
Approved August 9, 2013.