Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
(a)
Short Title.—.
33 USC 2201 note. This Act may be cited as the “Water Resources Reform and Development Act of 2014”.
¶
SEC. 2.
DEFINITION OF SECRETARY..
33 USC 2201 note. In this Act, the term “Secretary” means the Secretary of the Army.128 STAT. 1196
¶
TITLE I — PROGRAM REFORMS AND STREAMLINING
(a)
In General.—.
To the extent practicable, a feasibility study initiated by the Secretary, after the date of enactment of this Act, under section 905(a) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(a)) shall—
¶
(1)
Reports.Deadline. result in the completion of a final feasibility report not later than 3 years after the date of initiation;
¶
(2)
have a maximum Federal cost of $3,000,000; and
¶
(3)
ensure that personnel from the district, division, and headquarters levels of the Corps of Engineers concurrently conduct the review required under that section.
¶
(b)
Extension.—.
Determination.Deadline. If the Secretary determines that a feasibility study described in subsection (a) will not be conducted in accordance with subsection (a), the Secretary, not later than 30 days after the date of making the determination, shall—
¶
(1)
Cost estimate. prepare an updated feasibility study schedule and cost estimate;
¶
(2)
Notification. notify the non-Federal feasibility cost-sharing partner that the feasibility study has been delayed; and
¶
(3)
provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the reasons the requirements of subsection (a) are not attainable.
¶
(c)
Termination of Authorization.—.
Time period. A feasibility study for which the Secretary has issued a determination under subsection (b) is not authorized after the last day of the 1-year period beginning on the date of the determination if the Secretary has not completed the study on or before such last day.
¶
(1)
In general.—.
Time period.Determination. Notwithstanding the requirements of subsection (c), the Secretary may extend the timeline of a study by a period not to exceed 3 years, if the Secretary determines that the feasibility study is too complex to comply with the requirements of subsections (a) and (c).
¶
(2)
Factors.—.
In making a determination that a study is too complex to comply with the requirements of subsections (a) and (c), the Secretary shall consider—
¶
(A)
the type, size, location, scope, and overall cost of the project;
¶
(B)
whether the project will use any innovative design or construction techniques;
¶
(C)
whether the project will require significant action by other Federal, State, or local agencies;
¶
(D)
whether there is significant public dispute as to the nature or effects of the project; and
¶
(E)
whether there is significant public dispute as to the economic or environmental costs or benefits of the project.
¶
(3)
Notification.—.
Each time the Secretary makes a determination under this subsection, the Secretary shall provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation 128 STAT. 1197 and Infrastructure of the House of Representatives as to the results of that determination, including an identification of the specific 1 or more factors used in making the determination that the project is complex.
¶
(4)
Limitation.—.
The Secretary shall not extend the timeline for a feasibility study for a period of more than 7 years, and any feasibility study that is not completed before that date shall no longer be authorized.
¶
(e)
Reviews.—.
Deadline. Not later than 90 days after the date of the initiation of a study described in subsection (a) for a project, the Secretary shall—
¶
(1)
take all steps necessary to initiate the process for completing federally mandated reviews that the Secretary is required to complete as part of the study, including the environmental review process under section 1005;
¶
(2)
Meeting. convene a meeting of all Federal, tribal, and State agencies identified under section 2045(e) of the Water Resources Development Act of 2007 (33 U.S.C. 2348(e)) that may be required by law to conduct or issue a review, analysis, or opinion on or to make a determination concerning a permit or license for the study; and
¶
(3)
take all steps necessary to provide information that will enable required reviews and analyses related to the project to be conducted by other agencies in a thorough and timely manner.
¶
(f)
Interim Report.—.
Public information. Not later than 18 months after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that describes—
¶
(1)
the status of the implementation of the planning process under this section, including the number of participating projects;
¶
(2)
a review of project delivery schedules, including a description of any delays on those studies participating in the planning process under this section; and
¶
(3)
any recommendations for additional authority necessary to support efforts to expedite the feasibility study process for water resource projects.
¶
(g)
Final Report.—.
Public information. Not later than 4 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that describes—
¶
(1)
the status of the implementation of this section, including a description of each feasibility study subject to the requirements of this section;
¶
(2)
the amount of time taken to complete each feasibility study; and
¶
(3)
any recommendations for additional authority necessary to support efforts to expedite the feasibility study process, including an analysis of whether the limitation established by subsection (a)(2) needs to be adjusted to address the impacts of inflation.128 STAT. 1198
¶
(1)
Repeal.—.
Section 905(b) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(b)) is repealed.
¶
(2)
Conforming amendment.—.
Section 905(a)(1) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(a)(1)) is amended by striking “perform a reconnaissance study and”.
¶
(b)
Contents of Feasibility Reports.—.
Section 905(a)(2) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(a)(2)) is amended by adding at the end the following: “A feasibility report shall include a preliminary analysis of the Federal interest and the costs, benefits, and environmental impacts of the project.”.
¶
(c)
Feasibility Studies.—.
Section 905 of the Water Resources Development Act of 1986 (33 U.S.C. 2282) is amended by adding at the end the following:
¶
“(1)
In general.—.
Deadline.Determination. Not later than 180 days after the date of enactment of this subsection, the Secretary shall determine a set of milestones needed for the completion of a feasibility study under this subsection, including all major actions, report submissions and responses, reviews, and comment periods.
¶
“(2)
Detailed project schedule milestones.—.
Each District Engineer shall, to the maximum extent practicable, establish a detailed project schedule, based on full funding capability, that lists all deadlines for milestones relating to feasibility studies in the District developed by the Secretary under paragraph (1).
¶
“(3)
Non-federal interest notification.—.
Certified mail. Each District Engineer shall submit by certified mail the detailed project schedule under paragraph (2) to each relevant non-Federal interest—
¶
“(A)
Time period.Deadlines. for projects that have received funding from the General Investigations Account of the Corps of Engineers in the period beginning on October 1, 2009, and ending on the date of enactment of this subsection, not later than 180 days after the establishment of milestones under paragraph (1); and
¶
“(B)
for projects for which a feasibility cost-sharing agreement is executed after the establishment of milestones under paragraph (1), not later than 90 days after the date on which the agreement is executed.
¶
“(4)
Congressional and public notification.—.
Effective date. Beginning in the first full fiscal year after the date of enactment of this subsection, the Secretary shall—
¶
“(A)
Reports. submit an annual report that lists all detailed project schedules under paragraph (2) and an explanation of any missed deadlines to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives; and
¶
“(B)
Public information.Web posting.Records.Deadline. make publicly available, including on the Internet, a copy of the annual report described in subparagraph (A) not later than 14 days after date on which a report is submitted to Congress.128 STAT. 1199
¶
“(5)
Failure to act.—.
If a District Engineer fails to meet any of the deadlines in the project schedule under paragraph (2), the District Engineer shall—
¶
“(A)
Deadlines.Reports. not later than 30 days after each missed deadline, submit to the non-Federal interest a report detailing—
¶
“(i)
why the District Engineer failed to meet the deadline; and
¶
“(ii)
a revised project schedule reflecting amended deadlines for the feasibility study; and
¶
“(B)
Public information.Web posting.Records. not later than 30 days after each missed deadline, make publicly available, including on the Internet, a copy of the amended project schedule described in subparagraph (A)(ii).”
¶
(d)
Applicability.—.
33 USC 2282 note. The Secretary shall continue to carry out a study for which a reconnaissance level investigation has been initiated before the date of enactment of this Act as if this section, including the amendments made by this section, had not been enacted.
¶
(1)
expedite the completion of any on-going feasibility study for a project initiated before the date of enactment of this Act; and
¶
(2)
Determination. if the Secretary determines that the project is justified in a completed report, proceed directly to preconstruction planning, engineering, and design of the project in accordance with section 910 of the Water Resources Development Act of 1986 (33 U.S.C. 2287).
¶
SEC. 1004.
REMOVAL OF DUPLICATIVE ANALYSES..
Section 911 of the Water Resources Development Act of 1986 (33 U.S.C. 2288) is repealed.
¶
(1)
Amendment.—.
Section 2045 of the Water Resources Development Act of 2007 (33 U.S.C. 2348) is amended to read as follows:
¶
“(1)
Environmental impact statement.—.
The term ‘environmental impact statement’ means the detailed statement of environmental impacts of a project required to be prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
¶
“(A)
In general.—.
The term ‘environmental review process’ means the process of preparing an environmental impact statement, environmental assessment, categorical exclusion, or other document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for a project study.
¶
“(B)
Inclusions.—.
The term ‘environmental review process’ includes the process for and completion of any environmental permit, approval, review, or study required for a project study under any Federal law other than the 128 STAT. 1200 National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
¶
“(3)
Federal jurisdictional agency.—.
The term ‘Federal jurisdictional agency’ means a Federal agency with jurisdiction delegated by law, regulation, order, or otherwise over a review, analysis, opinion, statement, permit, license, or other approval or decision required for a project study under applicable Federal laws (including regulations).
¶
“(5)
Project.—.
The term ‘project’ means a water resources development project to be carried out by the Secretary.
¶
“(6)
Project sponsor.—.
The term ‘project sponsor’ has the meaning given the term ‘non-Federal interest’ in section 221(b) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(b)).
¶
“(7)
Project study.—.
The term ‘project study’ means a feasibility study for a project carried out pursuant to section 905 of the Water Resources Development Act of 1986 (33 U.S.C. 2282).
¶
“(A)
shall apply to each project study that is initiated after the date of enactment of the Water Resources Reform and Development Act of 2014 and for which an environmental impact statement is prepared under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
¶
“(B)
may be applied, to the extent determined appropriate by the Secretary, to other project studies initiated after such date of enactment and for which an environmental review process document is prepared under that Act.
¶
“(2)
Flexibility.—.
Any authority granted under this section may be exercised, and any requirement established under this section may be satisfied, for the conduct of an environmental review process for a project study, a class of project studies, or a program of project studies.
¶
“(A)
In general.—.
Deadline.Public information. The Secretary shall annually prepare, and make publicly available, a separate list of each study that the Secretary has determined—
¶
“(i)
meets the standards described in paragraph (1); and
¶
“(ii)
does not have adequate funding to make substantial progress toward the completion of the project study.
¶
“(B)
Inclusions.—.
The Secretary shall include for each project study on the list under subparagraph (A) a description of the estimated amounts necessary to make substantial progress on the project study.
¶
“(1)
In general.—.
The Secretary shall develop and implement a coordinated environmental review process for the development of project studies.
¶
“(2)
Coordinated review.—.
The coordinated environmental review process described in paragraph (1) shall require that any review, analysis, opinion, statement, permit, license, 128 STAT. 1201 or other approval or decision issued or made by a Federal, State, or local governmental agency or an Indian tribe for a project study described in subsection (b) be conducted, to the maximum extent practicable, concurrently with any other applicable governmental agency or Indian tribe.
¶
“(3)
Timing.—.
Deadline.Consultation. The coordinated environmental review process under this subsection shall be completed not later than the date on which the Secretary, in consultation and concurrence with the agencies identified under subsection (e), establishes with respect to the project study.
¶
“(A)
In general.—.
At the discretion of the Secretary and subject to the requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and the requirements of section 1506.8 of title 40, Code of Federal Regulations (or successor regulations), including the concurrence of the proposed joint lead agency, a project sponsor may serve as the joint lead agency.
¶
“(B)
Project sponsor as joint lead agency.—.
A project sponsor that is a State or local governmental entity may—
¶
“(i)
with the concurrence of the Secretary, serve as a joint lead agency with the Federal lead agency for purposes of preparing any environmental document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
¶
“(ii)
prepare any environmental review process document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) required in support of any action or approval by the Secretary if—
¶
“(I)
the Secretary provides guidance in the preparation process and independently evaluates that document;
¶
“(II)
the project sponsor complies with all requirements applicable to the Secretary under—
¶
“(bb)
any regulation implementing that Act; and
¶
“(cc)
any other applicable Federal law; and
¶
“(III)
the Secretary approves and adopts the document before the Secretary takes any subsequent action or makes any approval based on that document, regardless of whether the action or approval of the Secretary results in Federal funding.
¶
“(A)
the project sponsor complies with all design and mitigation commitments made jointly by the Secretary and the project sponsor in any environmental document prepared by the project sponsor in accordance with this subsection; and
¶
“(B)
any environmental document prepared by the project sponsor is appropriately supplemented to address any changes to the project the Secretary determines are necessary.128 STAT. 1202
¶
“(3)
Adoption and use of documents.—.
Any environmental document prepared in accordance with this subsection shall be adopted and used by any Federal agency making any determination related to the project study to the same extent that the Federal agency could adopt or use a document prepared by another Federal agency under—
¶
“(B)
parts 1500 through 1508 of title 40, Code of Federal Regulations (or successor regulations).
¶
“(4)
Roles and responsibility of lead agency.—.
With respect to the environmental review process for any project study, the Federal lead agency shall have authority and responsibility—
¶
“(A)
to take such actions as are necessary and proper and within the authority of the Federal lead agency to facilitate the expeditious resolution of the environmental review process for the project study; and
¶
“(B)
to prepare or ensure that any required environmental impact statement or other environmental review document for a project study required to be completed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is completed in accordance with this section and applicable Federal law.
¶
“(1)
Identification of jurisdictional agencies.—.
With respect to carrying out the environmental review process for a project study, the Secretary shall identify, as early as practicable in the environmental review process, all Federal, State, and local government agencies and Indian tribes that may—
¶
“(A)
have jurisdiction over the project;
¶
“(B)
be required by law to conduct or issue a review, analysis, opinion, or statement for the project study; or
¶
“(C)
be required to make a determination on issuing a permit, license, or other approval or decision for the project study.
¶
“(2)
State authority.—.
If the environmental review process is being implemented by the Secretary for a project study within the boundaries of a State, the State, consistent with State law, may choose to participate in the process and to make subject to the process all State agencies that—
¶
“(A)
have jurisdiction over the project;
¶
“(B)
are required to conduct or issue a review, analysis, opinion, or statement for the project study; or
¶
“(C)
are required to make a determination on issuing a permit, license, or other approval or decision for the project study.
¶
“(A)
In general.—.
The Federal lead agency shall invite, as early as practicable in the environmental review process, any agency identified under paragraph (1) to become a participating or cooperating agency, as applicable, in the environmental review process for the project study.
¶
“(B)
Deadline.—.
An invitation to participate issued under subparagraph (A) shall set a deadline by which a response to the invitation shall be submitted, which 128 STAT. 1203 may be extended by the Federal lead agency for good cause.
¶
“(4)
Procedures.—.
Section 1501.6 of title 40, Code of Federal Regulations (as in effect on the date of enactment of the Water Resources Reform and Development Act of 2014) shall govern the identification and the participation of a cooperating agency.
¶
“(5)
Federal cooperating agencies.—.
Any Federal agency that is invited by the Federal lead agency to participate in the environmental review process for a project study shall be designated as a cooperating agency by the Federal lead agency unless the invited agency informs the Federal lead agency, in writing, by the deadline specified in the invitation that the invited agency—
¶
“(A)
¶
(i)
¶
(I)
has no jurisdiction or authority with respect to the project;
¶
“(II)
has no expertise or information relevant to the project; or
¶
“(III)
does not have adequate funds to participate in the project; and
¶
“(ii)
does not intend to submit comments on the project; or
¶
“(B)
does not intend to submit comments on the project.
¶
“(6)
Administration.—.
A participating or cooperating agency shall comply with this section and any schedule established under this section.
¶
“(7)
Effect of designation.—.
Designation as a participating or cooperating agency under this subsection shall not imply that the participating or cooperating agency—
¶
“(A)
supports a proposed project; or
¶
“(B)
has any jurisdiction over, or special expertise with respect to evaluation of, the project.
¶
“(A)
carry out the obligations of that agency under other applicable law concurrently and in conjunction with the required environmental review process, unless doing so would prevent the participating or cooperating agency from conducting needed analysis or otherwise carrying out those obligations; and
¶
“(B)
formulate and implement administrative, policy, and procedural mechanisms to enable the agency to ensure completion of the environmental review process in a timely, coordinated, and environmentally responsible manner.
¶
“(1)
In general.—.
Guidance. The Secretary shall issue guidance regarding the use of programmatic approaches to carry out the environmental review process that—
¶
“(A)
eliminates repetitive discussions of the same issues;
¶
“(B)
focuses on the actual issues ripe for analyses at each level of review;
¶
“(C)
establishes a formal process for coordinating with participating and cooperating agencies, including the creation of a list of all data that is needed to carry out an environmental review process; and
¶
“(D)
complies with—128 STAT. 1204
¶
“(ii)
all other applicable laws.
¶
“(A)
Consultation. as the first step in drafting guidance under that paragraph, consult with relevant Federal, State, and local governmental agencies, Indian tribes, and the public on the appropriate use and scope of the programmatic approaches;
¶
“(B)
emphasize the importance of collaboration among relevant Federal, State, and local governmental agencies, and Indian tribes in undertaking programmatic reviews, especially with respect to including reviews with a broad geographical scope;
¶
“(C)
ensure that the programmatic reviews—
¶
“(i)
promote transparency, including of the analyses and data used in the environmental review process, the treatment of any deferred issues raised by Federal, State, and local governmental agencies, Indian tribes, or the public, and the temporal and special scales to be used to analyze those issues;
¶
“(ii)
use accurate and timely information in the environmental review process, including—
¶
“(I)
criteria for determining the general duration of the usefulness of the review; and
¶
“(II)
the timeline for updating any out-of-date review;
¶
“(iii)
describe—
¶
“(I)
the relationship between programmatic analysis and future tiered analysis; and
¶
“(II)
the role of the public in the creation of future tiered analysis; and
¶
“(iv)
are available to other relevant Federal, State, and local governmental agencies, Indian tribes, and the public;
¶
“(D)
Deadline.Public information. allow not fewer than 60 days of public notice and comment on any proposed guidance; and
¶
“(E)
address any comments received under subparagraph (D).
¶
“(i)
In general.—.
Consultation. The Federal lead agency shall, after consultation with and with the concurrence of each participating and cooperating agency and the project sponsor or joint lead agency, as applicable, establish a plan for coordinating public and agency participation in, and comment on, the environmental review process for a project study or a category of project studies.
¶
“(ii)
Incorporation.—.
The plan established under clause (i) shall be incorporated into the project schedule milestones set under section 905(g)(2) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(g)(2)).
¶
“(i)
In general.—.
Deadline.Consultation. As soon as practicable but not later than 45 days after the close of the public comment period on a draft environmental impact statement, the Federal lead agency, after consultation with and the concurrence of each participating and cooperating agency and the project sponsor or joint lead agency, as applicable, shall establish, as part of the coordination plan established in subparagraph (A), a schedule for completion of the environmental review process for the project study.
¶
“(ii)
Factors for consideration.—.
In establishing a schedule, the Secretary shall consider factors such as—
¶
“(I)
the responsibilities of participating and cooperating agencies under applicable laws;
¶
“(II)
the resources available to the project sponsor, joint lead agency, and other relevant Federal and State agencies, as applicable;
¶
“(III)
the overall size and complexity of the project;
¶
“(IV)
the overall schedule for and cost of the project; and
¶
“(V)
the sensitivity of the natural and historical resources that could be affected by the project.
¶
“(I)
lengthen a schedule established under clause (i) for good cause; and
¶
“(II)
shorten a schedule only with concurrence of the affected participating and cooperating agencies and the project sponsor or joint lead agency, as applicable.
¶
“(I)
provided to each participating and cooperating agency and the project sponsor or joint lead agency, as applicable; and
¶
“(II)
Public information. made available to the public.
¶
“(2)
Comment deadlines.—.
Time periods. The Federal lead agency shall establish the following deadlines for comment during the environmental review process for a project study:
¶
“(A)
Draft environmental impact statements.—.
Federal Register, publication.Notice. For comments by Federal and States agencies and the public on a draft environmental impact statement, a period of not more than 60 days after publication in the Federal Register of notice of the date of public availability of the draft environmental impact statement, unless—
¶
“(i)
a different deadline is established by agreement of the Federal lead agency, the project sponsor or joint lead agency, as applicable, and all participating and cooperating agencies; or
¶
“(ii)
the deadline is extended by the Federal lead agency for good cause.
¶
“(B)
Other environmental review processes.—.
For all other comment periods established by the Federal lead agency for agency or public comments in the environmental review process, a period of not more than 30 days after 128 STAT. 1206 the date on which the materials on which comment is requested are made available, unless—
¶
“(i)
a different deadline is established by agreement of the Federal lead agency, the project sponsor, or joint lead agency, as applicable, and all participating and cooperating agencies; or
¶
“(ii)
the deadline is extended by the Federal lead agency for good cause.
¶
“(3)
Deadlines for decisions under other laws.—.
Notifications. In any case in which a decision under any Federal law relating to a project study, including the issuance or denial of a permit or license, is required to be made by the date described in subsection (h)(5)(B)(ii), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives—
¶
“(A)
as soon as practicable after the 180-day period described in subsection (h)(5)(B)(ii), an initial notice of the failure of the Federal agency to make the decision; and
¶
“(B)
every 60 days thereafter until such date as all decisions of the Federal agency relating to the project study have been made by the Federal agency, an additional notice that describes the number of decisions of the Federal agency that remain outstanding as of the date of the additional notice.
¶
“(4)
Involvement of the public.—.
Nothing in this subsection reduces any time period provided for public comment in the environmental review process under applicable Federal law (including regulations).
¶
“(A)
Reporting requirements.—.
Database.Public information. Not later than 1 year after the date of enactment of the Water Resources Reform and Development Act of 2014, the Secretary shall establish and maintain an electronic database and, in coordination with other Federal and State agencies, issue reporting requirements to make publicly available the status and progress with respect to compliance with applicable requirements of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et. seq.) and any other Federal, State, or local approval or action required for a project study for which this section is applicable.
¶
“(B)
Project study transparency.—.
Publication. Consistent with the requirements established under subparagraph (A), the Secretary shall publish the status and progress of any Federal, State, or local decision, action, or approval required under applicable laws for each project study for which this section is applicable.
¶
“(1)
Cooperation.—.
The Federal lead agency, the cooperating agencies, and any participating agencies shall work cooperatively in accordance with this section to identify and resolve issues that could delay completion of the environmental review process or result in the denial of any approval required for the project study under applicable laws.
¶
“(A)
In general.—.
The Federal lead agency shall make information available to the cooperating agencies and participating agencies as early as practicable in the environmental review process regarding the environmental and socioeconomic resources located within the project area and the general locations of the alternatives under consideration.
¶
“(B)
Data sources.—.
The information under subparagraph (A) may be based on existing data sources, including geographic information systems mapping.
¶
“(3)
Cooperating and participating agency responsibilities.—.
Based on information received from the Federal lead agency, cooperating and participating agencies shall identify, as early as practicable, any issues of concern regarding the potential environmental or socioeconomic impacts of the project, including any issues that could substantially delay or prevent an agency from granting a permit or other approval that is needed for the project study.
¶
“(A)
In general.—.
Meeting. On the request of a participating or cooperating agency or project sponsor, the Secretary shall convene an issue resolution meeting with the relevant participating and cooperating agencies and the project sponsor or joint lead agency, as applicable, to resolve issues that may—
¶
“(i)
delay completion of the environmental review process; or
¶
“(ii)
result in denial of any approval required for the project study under applicable laws.
¶
“(B)
Meeting date.—.
Deadline. A meeting requested under this paragraph shall be held not later than 21 days after the date on which the Secretary receives the request for the meeting, unless the Secretary determines that there is good cause to extend that deadline.
¶
“(C)
Notification.—.
On receipt of a request for a meeting under this paragraph, the Secretary shall notify all relevant participating and cooperating agencies of the request, including the issue to be resolved and the date for the meeting.
¶
“(D)
Elevation of issue resolution.—.
Time period. If a resolution cannot be achieved within the 30 day-period beginning on the date of a meeting under this paragraph and a determination is made by the Secretary that all information necessary to resolve the issue has been obtained, the Secretary shall forward the dispute to the heads of the relevant agencies for resolution.
¶
“(E)
Convention by secretary.—.
The Secretary may convene an issue resolution meeting under this paragraph at any time, at the discretion of the Secretary, regardless of whether a meeting is requested under subparagraph (A).
¶
“(A)
In general.—.
A Federal jurisdictional agency shall complete any required approval or decision for the environmental review process on an expeditious basis using the shortest existing applicable process.
¶
“(i)
In general.—.
Deadline. If a Federal jurisdictional agency fails to render a decision required under any Federal law relating to a project study that requires the preparation of an environmental impact statement or environmental assessment, including the issuance or denial of a permit, license, statement, opinion, or other approval by the date described in clause (ii), the amount of funds made available to support the office of the head of the Federal jurisdictional agency shall be reduced by an amount of funding equal to the amounts specified in subclause (I) or (II) and those funds shall be made available to the division of the Federal jurisdictional agency charged with rendering the decision by not later than 1 day after the applicable date under clause (ii), and once each week thereafter until a final decision is rendered, subject to subparagraph (C)—
¶
“(I)
$20,000 for any project study requiring the preparation of an environmental assessment or environmental impact statement; or
¶
“(II)
$10,000 for any project study requiring any type of review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) other than an environmental assessment or environmental impact statement.
¶
“(I)
the date that is 180 days after the date on which an application for the permit, license, or approval is complete; and
¶
“(II)
the date that is 180 days after the date on which the Federal lead agency issues a decision on the project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
¶
“(i)
In general.—.
No transfer of funds under subparagraph (B) relating to an individual project study shall exceed, in any fiscal year, an amount equal to 1 percent of the funds made available for the applicable agency office.
¶
“(ii)
Failure to decide.—.
The total amount transferred in a fiscal year as a result of a failure by an agency to make a decision by an applicable deadline shall not exceed an amount equal to 5 percent of the funds made available for the applicable agency office for that fiscal year.
¶
“(iii)
Aggregate.—.
Notwithstanding any other provision of law, for each fiscal year, the aggregate amount of financial penalties assessed against each applicable agency office under the Water Resources Reform and Development Act of 2014 and any other Federal law as a result of a failure of the agency to make a decision by an applicable deadline for environmental review, including the total amount transferred under this paragraph, shall not exceed an amount equal to 9.5 percent of the funds made available for the agency office for that fiscal year.128 STAT. 1209
¶
“(i)
In general.—.
A transfer of funds under this paragraph shall not be made if the applicable agency described in subparagraph (A) notifies, with a supporting explanation, the Federal lead agency, cooperating agencies, and project sponsor, as applicable, that—
¶
“(I)
the agency has not received necessary information or approvals from another entity in a manner that affects the ability of the agency to meet any requirements under Federal, State, or local law;
¶
“(II)
significant new information, including from public comments, or circumstances, including a major modification to an aspect of the project, requires additional analysis for the agency to make a decision on the project application; or
¶
“(III)
the agency lacks the financial resources to complete the review under the scheduled time frame, including a description of the number of full-time employees required to complete the review, the amount of funding required to complete the review, and a justification as to why not enough funding is available to complete the review by the deadline.
¶
“(ii)
Lack of financial resources.—.
If the agency provides notice under clause (i)(III), the Inspector General of the agency shall—
¶
“(I)
Audit. conduct a financial audit to review the notice; and
¶
“(II)
Deadline.Reports. not later than 90 days after the date on which the review described in subclause (I) is completed, submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report on the notice.
¶
“(E)
Limitation.—.
The Federal agency from which funds are transferred pursuant to this paragraph shall not reprogram funds to the office of the head of the agency, or equivalent office, to reimburse that office for the loss of the funds.
¶
“(F)
Effect of paragraph.—.
Nothing in this paragraph affects or limits the application of, or obligation to comply with, any Federal, State, local, or tribal law.
¶
“(A)
the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process should cooperate with each other, State agencies, and Indian tribes on environmental review and project delivery activities at the earliest practicable time to avoid delays and duplication of effort later in the process, prevent potential conflicts, and ensure that planning and project development decisions reflect environmental values; and128 STAT. 1210
¶
“(B)
the cooperation referred to in subparagraph (A) should include the development of policies and the designation of staff that advise planning agencies and project sponsors of studies or other information foreseeably required for later Federal action and early consultation with appropriate State and local agencies and Indian tribes.
¶
“(2)
Technical assistance.—.
If requested at any time by a State or project sponsor, the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process, shall, to the maximum extent practicable and appropriate, as determined by the agencies, provide technical assistance to the State or project sponsor in carrying out early coordination activities.
¶
“(3)
Memorandum of agency agreement.—.
Consultation. If requested at any time by a State or project sponsor, the Federal lead agency, in consultation with other Federal agencies with relevant jurisdiction in the environmental review process, may establish memoranda of agreement with the project sponsor, Indian tribe, State and local governments, and other appropriate entities to carry out the early coordination activities, including providing technical assistance in identifying potential impacts and mitigation issues in an integrated fashion.
¶
“(1)
any obligation to comply with the provisions of any Federal law, including—
¶
“(B)
any other Federal environmental law;
¶
“(2)
the reviewability of any final Federal agency action in a court of the United States or in the court of any State;
¶
“(3)
any requirement for seeking, considering, or responding to public comment; or
¶
“(4)
any power, jurisdiction, responsibility, duty, or authority that a Federal, State, or local governmental agency, Indian tribe, or project sponsor has with respect to carrying out a project or any other provision of law applicable to projects.
¶
“(A)
In general.—.
Deadline. Notwithstanding any other provision of law, a claim arising under Federal law seeking judicial review of a permit, license, or other approval issued by a Federal agency for a project study shall be barred unless the claim is filed not later than 3 years after publication of a notice in the Federal Register announcing that the permit, license, or other approval is final pursuant to the law under which the agency action is taken, unless a shorter time is specified in the Federal law that allows judicial review.
¶
“(B)
Applicability.—.
Nothing in this subsection creates a right to judicial review or places any limit on filing a claim that a person has violated the terms of a permit, license, or other approval.
¶
“(A)
In general.—.
The Secretary shall consider new information received after the close of a comment period 128 STAT. 1211 if the information satisfies the requirements for a supplemental environmental impact statement under title 40, Code of Federal Regulations (including successor regulations).
¶
“(B)
Separate action.—.
Deadline. The preparation of a supplemental environmental impact statement or other environmental document, if required under this section, shall be considered a separate final agency action and the deadline for filing a claim for judicial review of the action shall be 3 years after the date of publication of a notice in the Federal Register announcing the action relating to such supplemental environmental impact statement or other environmental document.
¶
“(1)
In general.—.
Deadline. Not later than 180 days after the date of enactment of the Water Resources Reform and Development Act of 2014, the Secretary shall—
¶
“(A)
Survey. survey the use by the Corps of Engineers of categorical exclusions in projects since 2005;
¶
“(B)
Publication. publish a review of the survey that includes a description of—
¶
“(i)
the types of actions that were categorically excluded or could be the basis for developing a new categorical exclusion; and
¶
“(ii)
any requests previously received by the Secretary for new categorical exclusions; and
¶
“(C)
solicit requests from other Federal agencies and project sponsors for new categorical exclusions.
¶
“(2)
New categorical exclusions.—.
Deadline.Publication.Notice. Not later than 1 year after the date of enactment of the Water Resources Reform and Development Act of 2014, if the Secretary has identified a category of activities that merit establishing a categorical exclusion that did not exist on the day before the date of enactment of the Water Resources Reform and Development Act of 2014 based on the review under paragraph (1), the Secretary shall publish a notice of proposed rulemaking to propose that new categorical exclusion, to the extent that the categorical exclusion meets the criteria for a categorical exclusion under section 1508.4 of title 40, Code of Federal Regulations (or successor regulation).
¶
“(A)
assess the reforms carried out under this section; and
¶
“(B)
Deadlines.Reports. not later than 5 years and not later than 10 years after the date of enactment of the Water Resources Reform and Development Act of 2014, submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that describes the results of the assessment.
¶
“(2)
Contents.—.
Evaluation. The reports under paragraph (1) shall include an evaluation of impacts of the reforms carried out under this section on—
¶
“(A)
project delivery;
¶
“(B)
compliance with environmental laws; and128 STAT. 1212
¶
“(C)
the environmental impact of projects.
¶
“(n)
Performance Measurement.—.
Reports. The Secretary shall establish a program to measure and report on progress made toward improving and expediting the planning and environmental review process.
¶
“(o)
Implementation Guidance.—.
Consultation. The Secretary shall prepare, in consultation with the Council on Environmental Quality and other Federal agencies with jurisdiction over actions or resources that may be impacted by a project, guidance documents that describe the coordinated environmental review processes that the Secretary intends to use to implement this section for the planning of projects, in accordance with the civil works program of the Corps of Engineers and all applicable law.”
¶
(2)
Clerical amendment.—.
The table of contents contained in section 1(b) of the Water Resources Development Act of 2007 (121 Stat. 1042) is amended by striking the item relating to section 2045 and inserting the following:
¶
(b)
Categorical Exclusions in Emergencies.—.
33 USC 2349. For the repair, reconstruction, or rehabilitation of a water resources project that is in operation or under construction when damaged by an event or incident that results in a declaration by the President of a major disaster or emergency pursuant to the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5121 et seq.), the Secretary shall treat such repair, reconstruction, or rehabilitation activity as a class of action categorically excluded from the requirements relating to environmental assessments or environmental impact statements under section 1508.4 of title 40, Code of Federal Regulations (or successor regulations), if the repair or reconstruction activity is—
¶
(1)
in the same location with the same capacity, dimensions, and design as the original water resources project as before the declaration described in this section; and
¶
(2)
Time period. commenced within a 2-year period beginning on the date of a declaration described in this subsection.
¶
SEC. 1006.
EXPEDITING THE EVALUATION AND PROCESSING OF PERMITS..
Section 214 of the Water Resources Development Act of 2000 (Public Law 106–541; 33 U.S.C. 2201 note) is amended—
¶
(1)
in subsection (a)—
¶
(A)
by striking “(a) In General.—The Secretary” and inserting the following:
¶
“(A)
Natural gas company.—.
The term ‘natural gas company’ has the meaning given the term in section 1262 of the Public Utility Holding Company Act of 2005 (42 U.S.C. 16451), except that the term also includes a person engaged in the transportation of natural gas in intrastate commerce.
¶
“(B)
Public-utility company.—.
The term ‘public-utility company’ has the meaning given the term in section 1262 of the Public Utility Holding Company Act of 2005 (42 U.S.C. 16451).
¶
128 STAT. 1213
¶
(B)
in paragraph (2) (as so designated)—
¶
(i)
by inserting “or a public-utility company or natural gas company” after “non-Federal public entity”; and
¶
(ii)
by inserting “or company” after “that entity”; and
¶
(C)
by adding at the end the following:
¶
“(3)
Limitation for public-utility and natural gas companies.—.
Expiration date.The authority provided under paragraph (2) to a public-utility company or natural gas company shall expire on the date that is 7 years after the date of enactment of this paragraph.
¶
“(4)
Effect on other entities.—.
To the maximum extent practicable, the Secretary shall ensure that expediting the evaluation of a permit through the use of funds accepted and expended under this section does not adversely affect the timeline for evaluation (in the Corps district in which the project or activity is located) of permits under the jurisdiction of the Department of the Army of other entities that have not contributed funds under this section.
¶
“(5)
GAO study.—.
Deadline. Not later than 4 years after the date of enactment of this paragraph, the Comptroller General of the United States shall carry out a study of the implementation by the Secretary of the authority provided under paragraph (2) to public-utility companies and natural gas companies.”
¶
; and
¶
(2)
by striking subsections (d) and (e) and inserting the following:
¶
“(1)
In general.—.
The Secretary shall ensure that all final permit decisions carried out using funds authorized under this section are made available to the public in a common format, including on the Internet, and in a manner that distinguishes final permit decisions under this section from other final actions of the Secretary.
¶
“(A)
use a standard decision document for evaluating all permits using funds accepted under this section; and
¶
“(B)
make the standard decision document, along with all final permit decisions, available to the public, including on the Internet.
¶
“(3)
Agreements.—.
The Secretary shall make all active agreements to accept funds under this section available on a single public Internet site.
¶
“(1)
In general.—.
The Secretary shall prepare an annual report on the implementation of this section, which, at a minimum, shall include for each district of the Corps of Engineers that accepts funds under this section—
¶
“(A)
a comprehensive list of any funds accepted under this section during the previous fiscal year;
¶
“(B)
a comprehensive list of the permits reviewed and approved using funds accepted under this section during the previous fiscal year, including a description of the size and type of resources impacted and the mitigation required for each permit; and128 STAT. 1214
¶
“(C)
a description of the training offered in the previous fiscal year for employees that is funded in whole or in part with funds accepted under this section.
¶
“(A)
submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives the annual report described in paragraph (1); and
¶
“(B)
Public information.Web posting. make each report received under subparagraph (A) available on a single publicly accessible Internet site.”
¶
SEC. 1007.
EXPEDITING APPROVAL OF MODIFICATIONS AND ALTERATIONS OF PROJECTS BY NON-FEDERAL INTERESTS..
33 USC 408a.
¶
(a)
Section 14 Application Defined.—.
In this section, the term “section 14 application” means an application submitted by an applicant to the Secretary requesting permission for the temporary occupation or use of a public work, or the alteration or permanent occupation or use of a public work, under section 14 of the Act of March 3, 1899 (commonly known as the “Rivers and Harbors Appropriation Act of 1899”) (33 U.S.C. 408).
¶
(b)
Review.—.
Deadline. Not later than 1 year after the date of enactment of this Act, the Secretary, after providing notice and an opportunity for comment, shall establish a process for the review of section 14 applications in a timely and consistent manner.
¶
(A)
establish benchmark goals for determining the amount of time it should take the Secretary to determine whether a section 14 application is complete;
¶
(B)
establish benchmark goals for determining the amount of time it should take the Secretary to approve or disapprove a section 14 application; and
¶
(C)
to the extent practicable, use such benchmark goals to make a decision on section 14 applications in a timely and consistent manner.
¶
(A)
Benchmark goals for determining whether section 14 applications are complete.—.
To the extent practicable, the benchmark goals established under paragraph (1) shall provide that—
¶
(i)
the Secretary reach a decision on whether a section 14 application is complete not later than 15 days after the date of receipt of the application; and
¶
(ii)
Determination.Notification. if the Secretary determines that a section 14 application is not complete, the Secretary promptly notify the applicant of the specific information that is missing or the analysis that is needed to complete the application.
¶
(B)
Benchmark goals for reviewing completed applications.—.
To the extent practicable, the benchmark goals established under paragraph (1) shall provide that—
¶
(i)
the Secretary generally approve or disapprove a completed section 14 application not later than 45 128 STAT. 1215 days after the date of receipt of the completed application; and
¶
(ii)
in a case in which the Secretary determines that additional time is needed to review a completed section 14 application due to the type, size, cost, complexity, or impacts of the actions proposed in the application, the Secretary generally approve or disapprove the application not later than 180 days after the date of receipt of the completed application.
¶
(3)
Notice.—.
In any case in which the Secretary determines that it will take the Secretary more than 45 days to review a completed section 14 application, the Secretary shall—
¶
(A)
provide written notification to the applicant; and
¶
(B)
include in the written notice a best estimate of the Secretary as to the amount of time required for completion of the review.
¶
(d)
Failure To Achieve Benchmark Goals.—.
Notification. In any case in which the Secretary fails make a decision on a section 14 application in accordance with the process established under this section, the Secretary shall provide written notice to the applicant, including a detailed description of—
¶
(1)
why the Secretary failed to make a decision in accordance with such process;
¶
(2)
the additional actions required before the Secretary will issue a decision; and
¶
(3)
the amount of time the Secretary will require to issue a decision.
¶
(1)
Submission to congress.—.
Records. The Secretary shall provide a copy of any written notice provided under subsection (d) to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives.
¶
(2)
Public availability.—.
Database. The Secretary shall maintain a publicly available database, including on the Internet, on—
¶
(A)
all section 14 applications received by the Secretary; and
¶
(B)
the current status of such applications.
¶
(1)
the development of non-Federal hydroelectric power at Corps of Engineers civil works projects, including locks and dams, shall be given priority;
¶
(2)
Corps of Engineers approval of non-Federal hydroelectric power at Corps of Engineers civil works projects, including permitting required under section 14 of the Act of March 3, 1899 (33 U.S.C. 408), shall be completed by the Corps of Engineers in a timely and consistent manner; and
¶
(3)
approval of hydropower at Corps of Engineers civil works projects shall in no way diminish the other priorities and missions of the Corps of Engineers, including authorized project purposes and habitat and environmental protection.
¶
(b)
Report.—.
Public information. Not later than 2 years after the date of enactment of this Act and biennially thereafter, the Secretary shall submit 128 STAT. 1216 to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that, at a minimum, shall include—
¶
(1)
a description of initiatives carried out by the Secretary to encourage the development of hydroelectric power by non-Federal entities at Corps of Engineers civil works projects;
¶
(2)
a list of all new hydroelectric power activities by non-Federal entities approved at Corps of Engineers civil works projects in that fiscal year, including the length of time the Secretary needed to approve those activities;
¶
(3)
a description of the status of each pending application from non-Federal entities for approval to develop hydroelectric power at Corps of Engineers civil works projects;
¶
(4)
a description of any benefits or impacts to the environment, recreation, or other uses associated with Corps of Engineers civil works projects at which non-Federal entities have developed hydroelectric power in the previous fiscal year; and
¶
(5)
the total annual amount of payments or other services provided to the Corps of Engineers, the Treasury, and any other Federal agency as a result of approved non-Federal hydropower projects at Corps of Engineers civil works projects.
¶
(a)
Report.—.
Public information. Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report describing the actions of the Secretary in carrying out section 2301 of title 41, United States Code, regarding the use of electronic commerce in Federal procurement.
¶
(b)
Contents.—.
The report submitted under subsection (a) shall include, with respect to the 2 fiscal years most recently ended before the fiscal year in which the report is submitted—
¶
(1)
an identification of the number, type, and dollar value of procurement solicitations with respect to which the public was permitted to respond to the solicitation electronically, which shall differentiate between solicitations that allowed full or partial electronic submission;
¶
(2)
an analysis of the information provided under paragraph (1) and actions that could be taken by the Secretary to refine and improve the use of electronic submission for procurement solicitation responses;
¶
(3)
an analysis of the potential benefits of and obstacles to full implementation of electronic submission for procurement solicitation responses, including with respect to cost savings, error reduction, paperwork reduction, increased bidder participation, and competition, and expanded use of electronic bid data collection for cost-effective contract management and timely reporting; and
¶
(4)
an analysis of the options and technologies available to facilitate expanded implementation of electronic submission for procurement solicitation responses and the suitability of each option and technology for contracts of various types and sizes.128 STAT. 1217
¶
(a)
In General.—.
Notification. The Secretary shall notify the applicable non-Federal interest when construction of a water resources project or a functional portion of the project is completed so the non-Federal interest may commence responsibilities, as applicable, for operating and maintaining the project.
¶
(1)
In general.—.
Deadline. Not later than 7 days after receiving a notification under subsection (a), the non-Federal interest may appeal the completion determination of the Secretary in writing with a detailed explanation of the basis for questioning the completeness of the project or functional portion of the project.
¶
(A)
In general.—.
Contracts. On notification that a non-Federal interest has submitted an appeal under paragraph (1), the Secretary shall contract with 1 or more independent, non-Federal experts to evaluate whether the applicable water resources project or functional portion of the project is complete.
¶
(B)
Timeline.—.
Deadline. An independent review carried out under subparagraph (A) shall be completed not later than 180 days after the date on which the Secretary receives an appeal from a non-Federal interest under paragraph (1).
¶
(1)
Priority.—.
For authorized projects and ongoing feasibility studies with a primary purpose of hurricane and storm damage risk reduction, the Secretary shall give funding priority to projects and ongoing studies that—
¶
(A)
address an imminent threat to life and property;
¶
(B)
prevent storm surge from inundating populated areas;
¶
(C)
prevent the loss of coastal wetlands that help reduce the impact of storm surge;
¶
(D)
protect emergency hurricane evacuation routes or shelters;
¶
(E)
prevent adverse impacts to publicly owned or funded infrastructure and assets;
¶
(F)
minimize disaster relief costs to the Federal Government; and
¶
(G)
address hurricane and storm damage risk reduction in an area for which the President declared a major disaster in accordance with section 401 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5170).
¶
(2)
Expedited consideration of currently authorized projects.—.
Deadline.Not later than 180 days after the date of enactment of this Act, the Secretary shall—
¶
(A)
Lists. submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a list of all—128 STAT. 1218
¶
(i)
ongoing hurricane and storm damage reduction feasibility studies that have signed feasibility cost-share agreements and have received Federal funds since 2009; and
¶
(ii)
authorized hurricane and storm damage reduction projects that—
¶
(I)
have been authorized for more than 20 years but are less than 75 percent complete; or
¶
(II)
are undergoing a post-authorization change report, general reevaluation report, or limited reevaluation report;
¶
(B)
identify those projects on the list required under subparagraph (A) that meet the criteria described in paragraph (1); and
¶
(C)
Plan. provide a plan for expeditiously completing the projects identified under subparagraph (B), subject to available funding.
¶
(b)
Prioritization of Ecosystem Restoration Efforts.—.
For authorized projects with a primary purpose of ecosystem restoration, the Secretary shall give funding priority to projects—
¶
(1)
that—
¶
(A)
address an identified threat to public health, safety, or welfare;
¶
(B)
preserve or restore ecosystems of national significance; or
¶
(C)
preserve or restore habitats of importance for federally protected species, including migratory birds; and
¶
(2)
for which the restoration activities will contribute to other ongoing or planned Federal, State, or local restoration initiatives.
¶
(a)
In General.—.
On the request of a non-Federal interest, the Secretary shall provide to the non-Federal interest a detailed accounting of the Federal expenses associated with a water resources project.
¶
(1)
In general.—.
Contracts. The Secretary shall contract with the National Academy of Public Administration to carry out a study on the efficiency of the Corps Engineers current staff salaries and administrative expense procedures as compared to using a separate administrative expense account.
¶
(2)
Contents.—.
Recommenda-tions. The study under paragraph (1) shall include any recommendations of the National Academy of Public Administration for improvements to the budgeting and administrative processes that will increase the efficiency of the Corps of Engineers project delivery.
¶
(a)
In General.—.
Review. The Secretary shall contract with the National Academy of Public Administration to carry out a comprehensive review of the process for preparing, negotiating, and approving Project Partnership Agreements and the Project Partnership Agreement template, which shall include—
¶
(1)
an evaluation of the process for preparing, negotiating, and approving Project Partnership Agreements, as in effect on the day before the date of enactment of this Act, including 128 STAT. 1219 suggested modifications to the process provided by non-Federal interests; and
¶
(2)
Recommenda-tions. recommendations based on the evaluation under paragraph (1) to improve the Project Partnership Agreement template and the process for preparing, negotiating, and approving Project Partnership Agreements.
¶
(1)
In general.—.
The Secretary shall submit the findings of the National Academy of Public Administration to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives.
¶
(2)
Report.—.
Not later than 180 days after the date on which the findings are received under paragraph (1), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a detailed response, including any recommendations the Secretary plans to implement, on the process for preparing, negotiating, and approving Project Partnership Agreements and the Project Partnership Agreement template.
¶
SEC. 1014.
STUDY AND CONSTRUCTION OF WATER RESOURCES DEVELOPMENT PROJECTS BY NON-FEDERAL INTERESTS..
¶
(a)
Studies.—.
Section 203 of the Water Resources Development Act of 1986 (33 U.S.C. 2231) is amended to read as follows:
¶
“(1)
In general.—.
A non-Federal interest may undertake a feasibility study of a proposed water resources development project and submit the study to the Secretary.
¶
“(2)
Guidelines.—.
To assist non-Federal interests, the Secretary, as soon as practicable, shall issue guidelines for feasibility studies of water resources development projects to provide sufficient information for the formulation of the studies.
¶
“(b)
Review by Secretary.—.
The Secretary shall review each feasibility study received under subsection (a)(1) for the purpose of determining whether or not the study, and the process under which the study was developed, each comply with Federal laws and regulations applicable to feasibility studies of water resources development projects.
¶
“(c)
Submission to Congress.—.
Deadline.Reports. Not later than 180 days after the date of receipt of a feasibility study of a project under subsection (a)(1), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that describes—
¶
“(1)
the results of the Secretary’s review of the study under subsection (b), including a determination of whether the project is feasible;
¶
“(2)
any recommendations the Secretary may have concerning the plan or design of the project; and
¶
“(3)
any conditions the Secretary may require for construction of the project.
¶
“(d)
Credit.—.
If a project for which a feasibility study has been submitted under subsection (a)(1) is authorized by a Federal 128 STAT. 1220 law enacted after the date of the submission to Congress under subsection (c), the Secretary shall credit toward the non-Federal share of the cost of construction of the project an amount equal to the portion of the cost of developing the study that would have been the responsibility of the United States if the study had been developed by the Secretary.”
¶
(1)
In general.—.
Section 204 of the Water Resources Development Act of 1986 (33 U.S.C. 2232) is amended to read as follows:
¶
“(a)
Water Resources Development Project Defined.—.
In this section, the term ‘water resources development project’ means a project recommendation that results from—
¶
“(1)
a feasibility report, as such term is defined in section 7001(f) of the Water Resources Reform and Development Act of 2014;
¶
“(2)
a completed feasibility study developed under section 203; or
¶
“(3)
a final feasibility study for water resources development and conservation and other purposes that is specifically authorized by Congress to be carried out by the Secretary.
¶
“(1)
In general.—.
A non-Federal interest may carry out a water resources development project, or separable element thereof—
¶
“(A)
in accordance with a plan approved by the Secretary for the project or separable element; and
¶
“(B)
subject to any conditions that the Secretary may require, including any conditions specified under section 203(c)(3).
¶
“(2)
Conditions.—.
Before carrying out a water resources development project, or separable element thereof, under this section, a non-Federal interest shall—
¶
“(A)
obtain any permit or approval required in connection with the project or separable element under Federal or State law; and
¶
“(B)
ensure that a final environmental impact statement or environmental assessment, as appropriate, for the project or separable element has been filed.
¶
“(c)
Studies and Engineering.—.
When requested by an appropriate non-Federal interest, the Secretary may undertake all necessary studies and engineering for any construction to be undertaken under subsection (b), and provide technical assistance in obtaining all necessary permits for the construction, if the non-Federal interest contracts with the Secretary to furnish the United States funds for the studies, engineering, or technical assistance in the period during which the studies and engineering are being conducted.
¶
“(1)
General rule.—.
Subject to paragraph (3), a project or separable element of a project carried out by a non-Federal interest under this section shall be eligible for credit or reimbursement for the Federal share of work carried out on a project or separable element of a project if—128 STAT. 1221
¶
“(A)
before initiation of construction of the project or separable element—
¶
“(i)
the Secretary approves the plans for construction of the project or separable element of the project by the non-Federal interest;
¶
“(ii)
Determination. the Secretary determines, before approval of the plans, that the project or separable element of the project is feasible; and
¶
“(iii)
Contracts. the non-Federal interest enters into a written agreement with the Secretary under section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b), including an agreement to pay the non-Federal share, if any, of the cost of operation and maintenance of the project; and
¶
“(B)
Determination. the Secretary determines that all Federal laws and regulations applicable to the construction of a water resources development project, and any conditions identified under subsection (b)(1)(B), were complied with by the non-Federal interest during construction of the project or separable element of the project.
¶
“(A)
the non-Federal share of authorized separable elements of the same project; or
¶
“(B)
subject to the requirements of this section and section 1020 of the Water Resources Reform and Development Act of 2014, at the request of the non-Federal interest, the non-Federal share of a different water resources development project.
¶
“(3)
Requirements.—.
The Secretary may only apply credit or provide reimbursement under paragraph (1) if—
¶
“(A)
Congress has authorized construction of the project or separable element of the project; and
¶
“(B)
Certification. the Secretary certifies that the project has been constructed in accordance with—
¶
“(i)
all applicable permits or approvals; and
¶
“(ii)
this section.
¶
“(4)
Monitoring.—.
Audit. The Secretary shall regularly monitor and audit any water resources development project, or separable element of a water resources development project, constructed by a non-Federal interest under this section to ensure that—
¶
“(A)
the construction is carried out in compliance with the requirements of this section; and
¶
“(B)
the costs of the construction are reasonable.
¶
“(e)
Notification of Committees.—.
If a non-Federal interest notifies the Secretary that the non-Federal interest intends to carry out a project, or separable element thereof, under this section, the Secretary shall provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives concerning the intent of the non-Federal interest.
¶
“(f)
Operation and Maintenance.—.
Whenever a non-Federal interest carries out improvements to a federally authorized harbor or inland harbor, the Secretary shall be responsible for operation and maintenance in accordance with section 101(b) if—
¶
“(1)
before construction of the improvements—128 STAT. 1222
¶
“(A)
Determination. the Secretary determines that the improvements are feasible and consistent with the purposes of this title; and
¶
“(B)
Contracts. the Secretary and the non-Federal interest execute a written agreement relating to operation and maintenance of the improvements;
¶
“(2)
Certification. the Secretary certifies that the project or separable element of the project is constructed in accordance with applicable permits and appropriate engineering and design standards; and
¶
“(3)
the Secretary does not find that the project or separable element is no longer feasible.”
¶
(1)
Section 404 of the Water Resources Development Act of 1990 (33 U.S.C. 2232 note; 104 Stat. 4646) and the item relating to that section in the table of contents contained in section 1(b) of that Act.
¶
(2)
Section 206 of the Water Resources Development Act of 1992 (33 U.S.C. 426i–1) and the item relating to that section in the table of contents contained in section 1(b) of that Act.
¶
(3)
Section 211 of the Water Resources Development Act of 1996 (33 U.S.C. 701b–13) and the item relating to that section in the table of contents contained in section 1(b) of that Act.
¶
(d)
Savings Provision.—.
22 USC 2232 note. Nothing in this section may be construed to affect an agreement in effect on the date of enactment of this Act, or an agreement that is finalized between the Corps of Engineers and a non-Federal interest on or before December 31, 2014, under any of the following sections (as such sections were in effect on the day before such date of enactment):
¶
(1)
by inserting “and other non-Federal interests” after “States and political subdivisions thereof” each place it appears;
¶
(2)
by inserting “, including a project for navigation on the inland waterways,” after “study or project”;
¶
(3)
Determination. by striking “Provided, That when” and inserting “Provided, That the Secretary is authorized to receive and expend funds from a State or a political subdivision thereof, and other non-Federal interests or private entities, to operate a hurricane barrier project to support recreational activities at or in the vicinity of the project, at no cost to the Federal Government, if the Secretary determines that operation for such purpose is not inconsistent with the operation and maintenance of the project for the authorized purposes of the project:Provided further, That when”; and
¶
(4)
by striking the period at the end and inserting the following: “: Provided further, That the term ‘non-Federal 128 STAT. 1223 interest’ has the meaning given that term in section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b).”.
¶
(b)
Notification for Contributed Funds.—.
33 USC 701h note. Prior to accepting funds contributed under section 5 of the Act of June 22, 1936 (33 U.S.C. 701h), the Secretary shall provide written notice of the funds to the Committee on Environment and Public Works and the Committee on Appropriations of the Senate and the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives.
¶
(c)
Technical Amendment.—.
Section 111(b) of the Energy and Water Development and Related Agencies Appropriations Act, 2012 (125 Stat. 858) is repealed.
¶
SEC. 1016.
OPERATION AND MAINTENANCE OF CERTAIN PROJECTS..
33 USC 2232 note. The Secretary may assume responsibility for operation and maintenance in accordance with section 101(b) of the Water Resources Development Act of 1986 (33 U.S.C. 2211(b)) (as amended by section 2102(b)) for improvements to a federally authorized harbor or inland harbor that are carried out by a non-Federal interest prior to December 31, 2014, if the Secretary determines that the requirements under paragraphs (2) and (3) of section 204(f) of the Water Resources Development Act of 1986 (33 U.S.C. 2232(f)) are met.
¶
(a)
In General.—.
The Secretary, after providing public notice, shall establish a pilot program for the acceptance and expenditure of funds contributed by non-Federal interests to increase the hours of operation of locks at water resources development projects.
¶
(b)
Applicability.—.
The establishment of the pilot program under this section shall not affect the periodic review and adjustment of hours of operation of locks based on increases in commercial traffic carried out by the Secretary.
¶
(c)
Public Comment.—.
Not later than 180 days before a proposed modification to the operation of a lock at a water resources development project will be carried out, the Secretary shall—
¶
(1)
publish the proposed modification in the Federal Register; and
¶
(2)
accept public comment on the proposed modification.
¶
(1)
In general.—.
Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that evaluates the cost-savings resulting from reduced lock hours and any economic impacts of modifying lock operations.
¶
(2)
Review of pilot program.—.
Not later than September 30, 2017, and each year thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that describes the effectiveness of the pilot program under this section.
¶
(e)
Annual Review.—.
The Secretary shall carry out an annual review of the commercial use of locks and make any necessary adjustments to lock operations based on that review.128 STAT. 1224
¶
(f)
Termination.—.
The authority to accept funds under this section shall terminate 5 years after the date of enactment of this Act.
¶
(a)
In General.—.
Section 221(a)(4) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)) is amended—
¶
(1)
in subparagraph (A), in the matter preceding clause (i), by inserting “or a project under an environmental infrastructure assistance program” after “law”;
¶
(2)
in subparagraph (C) by striking “In any case” and all that follows through the period at the end and inserting the following:
¶
“(I)
In general.—.
Contracts. In any case in which the non-Federal interest is to receive credit under subparagraph (A) for the cost of construction carried out by the non-Federal interest before execution of a partnership agreement and that construction has not been carried out as of November 8, 2007, the Secretary and the non-Federal interest shall enter into an agreement under which the non-Federal interest shall carry out such work and shall do so prior to the non-Federal interest initiating construction or issuing a written notice to proceed for the construction.
¶
“(II)
Eligibility.—.
Construction that is carried out after the execution of an agreement to carry out work described in subclause (I) and any design activities that are required for that construction, even if the design activity is carried out prior to the execution of the agreement to carry out work, shall be eligible for credit.
¶
“(I)
In general.—.
Contracts. In any case in which the non-Federal interest is to receive credit under subparagraph (A) for the cost of planning carried out by the non-Federal interest before execution of a feasibility cost-sharing agreement, the Secretary and the non-Federal interest shall enter into an agreement under which the non-Federal interest shall carry out such work and shall do so prior to the non-Federal interest initiating that planning.
¶
“(II)
Eligibility.—.
Planning that is carried out by the non-Federal interest after the execution of an agreement to carry out work described in subclause (I) shall be eligible for credit.”
¶
(3)
in subparagraph (D)(iii) by striking “sections 101 and 103” and inserting “sections 101(a)(2) and 103(a)(1)(A) of the Water Resources Development Act of 1986 (33 U.S.C. 2211(a)(2); 33 U.S.C. 2213(a)(1)(A))”;
¶
(4)
by redesignating subparagraph (E) as subparagraph (H);
¶
(5)
by inserting after subparagraph (D) the following:
¶
“(E)
Analysis of costs and benefits.—.
In the evaluation of the costs and benefits of a project, the Secretary 128 STAT. 1225 shall not consider construction carried out by a non-Federal interest under this subsection as part of the future without project condition.
¶
“(F)
Transfer of credit between separable elements of a project.—.
Credit for in-kind contributions provided by a non-Federal interest that are in excess of the non-Federal cost share for an authorized separable element of a project may be applied toward the non-Federal cost share for a different authorized separable element of the same project.
¶
“(i)
In general.—.
To the extent that credit for in-kind contributions, as limited by subparagraph (D), and credit for required land, easements, rights-of-way, dredged material disposal areas, and relocations provided by the non-Federal interest exceed the non-Federal share of the cost of construction of a project other than a navigation project, the Secretary, subject to the availability of funds, shall enter into a reimbursement agreement with the non-Federal interest, which shall be in addition to a partnership agreement under subparagraph (A), to reimburse the difference to the non-Federal interest.
¶
“(ii)
Priority.—.
If appropriated funds are insufficient to cover the full cost of all requested reimbursement agreements under clause (i), the Secretary shall enter into reimbursement agreements in the order in which requests for such agreements are received.”
¶
; and
¶
(6)
in subparagraph (H) (as redesignated by paragraph (4))—
¶
(A)
in clause (i) by inserting “, and to water resources projects authorized prior to the date of enactment of the Water Resources Development Act of 1986 (Public Law 99–662), if correction of design deficiencies is necessary” before the period at the end; and
¶
(B)
by striking clause (ii) and inserting the following:
¶
“(ii)
Authorization as addition to other authorizations.—.
The authority of the Secretary to provide credit for in-kind contributions pursuant to this paragraph shall be in addition to any other authorization to provide credit for in-kind contributions and shall not be construed as a limitation on such other authorization.Applicability. The Secretary shall apply the provisions of this paragraph, in lieu of provisions under other crediting authority, only if so requested by the non-Federal interest.”
¶
(b)
Applicability.—.
Section 2003(e) of the Water Resources Development Act of 2007 (42 U.S.C. 1962d–5b note) is amended—
¶
(1)
by inserting “, or construction of design deficiency corrections on the project,” after “construction on the project”; and
¶
(2)
by inserting “, or under which construction of the project has not been completed and the work to be performed by 128 STAT. 1226 the non-Federal interests has not been carried out and is creditable only toward any remaining non-Federal cost share,” after “has not been initiated”.
¶
(c)
Effective Date.—.
42 USC1962d–5b note. The amendments made by subsections (a) and (b) take effect on November 8, 2007.
¶
(1)
In general.—.
Deadline. Not later than 1 year after the date of enactment of this Act, the Secretary shall update any guidance or regulations for carrying out section 221(a)(4) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)) (as amended by subsection (a)) that are in existence on the date of enactment of this Act or issue new guidelines, as determined to be appropriate by the Secretary.
¶
(2)
Inclusions.—.
Any guidance, regulations, or guidelines updated or issued under paragraph (1) shall include, at a minimum—
¶
(A)
the milestone for executing an in-kind memorandum of understanding for construction by a non-Federal interest;
¶
(B)
criteria and procedures for evaluating a request to execute an in-kind memorandum of understanding for construction by a non-Federal interest that is earlier than the milestone under subparagraph (A) for that execution; and
¶
(C)
criteria and procedures for determining whether work carried out by a non-Federal interest is integral to a project.
¶
(3)
Public and stakeholder participation.—.
Before issuing any new or revised guidance, regulations, or guidelines or any subsequent updates to those documents, the Secretary shall—
¶
(A)
Consultation. consult with affected non-Federal interests;
¶
(B)
Federal Register, publication. publish the proposed guidelines developed under this subsection in the Federal Register; and
¶
(C)
Public information. provide the public with an opportunity to comment on the proposed guidelines.
¶
(e)
Other Credit.—.
42 USC1962d–5b note. Nothing in section 221(a)(4) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)) (as amended by subsection (a)) affects any eligibility for credit under section 104 of the Water Resources Development of 1986 (33 U.S.C. 2214) that was approved by the Secretary prior to the date of enactment of this Act.
¶
(a)
Non-Federal Cost Share.—.
Section 7007 of the Water Resources Development Act of 2007 (121 Stat. 1277) is amended—
¶
(1)
in subsection (a), by inserting “, on, or after” after “before”;
¶
(2)
by striking subsection (d) and inserting the following:
¶
“(d)
Treatment of Credit Between Projects.—.
The value of any land, easements, rights-of-way, relocations, and dredged material disposal areas and the costs of planning, design, and construction work provided by the non-Federal interest that exceed the non-Federal cost share for a study or project under this title may be applied toward the non-Federal cost share for any other study or project carried out under this title.”
¶
; and
¶
(3)
by adding at the end the following:128 STAT. 1227
¶
“(g)
Definition of Study or Project.—.
In this section, the term ‘study or project’ includes any eligible activity that is—
¶
“(1)
carried out pursuant to the coastal Louisiana ecosystem science and technology program authorized under section 7006(a); and
¶
“(2)
in accordance with the restoration plan.”
¶
(b)
Implementation.—.
Deadline.Louisiana. Not later than 90 days after the date of enactment of this Act, the Secretary, in coordination with any relevant agencies of the State of Louisiana, shall establish a process by which to carry out the amendment made by subsection (a)(2).
¶
(a)
In General.—.
Subject to subsection (b), the Secretary may apply credit for in-kind contributions provided by a non-Federal interest that are in excess of the required non-Federal cost share for a water resources development study or project toward the required non-Federal cost share for a different water resources development study or project.
¶
(1)
In general.—.
Except for subsection (a)(4)(D)(i) of that section, the requirements of section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b) (as amended by section 1018(a)) shall apply to any credit under this section.
¶
(2)
Conditions.—.
Credit in excess of the non-Federal share for a study or project may be approved under this section only if—
¶
(A)
the non-Federal interest submits a comprehensive plan to the Secretary that identifies—
¶
(i)
the studies and projects for which the non-Federal interest intends to provide in-kind contributions for credit that are in excess of the non-Federal cost share for the study or project; and
¶
(ii)
the authorized studies and projects to which that excess credit would be applied;
¶
(B)
the Secretary approves the comprehensive plan; and
¶
(C)
the total amount of credit does not exceed the total non-Federal share for the studies and projects in the approved comprehensive plan.
¶
(c)
Additional Criteria.—.
In evaluating a request to apply credit in excess of the non-Federal share for a study or project toward a different study or project, the Secretary shall consider whether applying that credit will—
¶
(1)
help to expedite the completion of a project or group of projects;
¶
(2)
reduce costs to the Federal Government; and
¶
(3)
aid the completion of a project that provides significant flood risk reduction or environmental benefits.
¶
(d)
Termination of Authority.—.
The authority provided in this section shall terminate 10 years after the date of enactment of this Act.
¶
(A)
In general.—.
Not later than 2 years after the date of enactment of this Act, and once every 2 years 128 STAT. 1228 thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available an interim report on the use of the authority under this section.
¶
(B)
Final report.—.
Not later than 10 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a final report on the use of the authority under this section.
¶
(A)
a description of the use of the authority under this section during the reporting period;
¶
(B)
an assessment of the impact of the authority under this section on the time required to complete projects; and
¶
(C)
an assessment of the impact of the authority under this section on other water resources projects.
¶
SEC. 1021.
CREDITING AUTHORITY FOR FEDERALLY AUTHORIZED NAVIGATION PROJECTS..
33 USC 2224. A non-Federal interest may carry out operation and maintenance activities for an authorized navigation project, subject to the condition that the non-Federal interest complies with all Federal laws and regulations applicable to such operation and maintenance activities, and may receive credit for the costs incurred by the non-Federal interest in carrying out such activities towards the share of construction costs of that non-Federal interest for another element of the same project or another authorized navigation project, except that in no instance may such credit exceed 20 percent of the total costs associated with construction of the general navigation features of the project for which such credit may be applied pursuant to this section.
¶
(a)
Requests for Credits.—.
With respect to an authorized flood damage reduction project, or separable element thereof, that has been constructed by a non-Federal interest under section 211 of the Water Resources Development Act of 1996 (33 U.S.C. 701b–13) before the date of enactment of this Act, the Secretary may provide to the non-Federal interest, at the request of the non-Federal interest, a credit in an amount equal to the estimated Federal share of the cost of the project or separable element, in lieu of providing to the non-Federal interest a reimbursement in that amount.
¶
(b)
Application of Credits.—.
At the request of the non-Federal interest, the Secretary may apply such credit to the share of the cost of the non-Federal interest of carrying out other flood damage reduction projects or studies.
¶
SEC. 1023.
ADDITIONAL CONTRIBUTIONS BY NON-FEDERAL INTERESTS..
Section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280) is amended—128 STAT. 1229
¶
(1)
by striking “In order to insure” and inserting “(a) In General.—In order to insure”; and
¶
(2)
by adding at the end the following:
¶
“(b)
Contributions by Non-Federal Interests.—.
Notwithstanding subsection (a), in accordance with section 5 of the Act of June 22, 1936 (33 U.S.C. 701h), the Secretary may accept funds from a non-Federal interest for any authorized water resources development project that has exceeded its maximum cost under subsection (a), and use such funds to carry out such project, if the use of such funds does not increase the Federal share of the cost of such project.”
¶
(a)
In General.—.
Subject to subsection (b), the Secretary is authorized to accept and use materials and services contributed by a non-Federal public entity, a nonprofit entity, or a private entity for the purpose of repairing, restoring, or replacing a water resources development project that has been damaged or destroyed as a result of an emergency if the Secretary determines that the acceptance and use of such materials and services is in the public interest.
¶
(b)
Limitation.—.
Any entity that contributes materials or services under subsection (a) shall not be eligible for credit or reimbursement for the value of such materials or services.
¶
(c)
Report.—.
Not later than 60 days after initiating an activity under this section, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that includes—
¶
(1)
a description of the activities undertaken, including the costs associated with the activities; and
¶
(2)
a comprehensive description of how the activities are necessary for maintaining a safe and reliable water resources project.
¶
(a)
In General.—.
Subject to subsection (b), the Secretary may carry out an authorized water resources development project on Federal land that is under the administrative jurisdiction of another Federal agency where the cost of the acquisition of such Federal land has been paid for by the non-Federal interest for the project.
¶
(b)
MOU Required.—.
The Secretary may carry out a project pursuant to subsection (a) only after the non-Federal interest has entered into a memorandum of understanding with the Federal agency that includes such terms and conditions as the Secretary determines to be necessary.
¶
(c)
Applicability.—.
Nothing in this section alters any non-Federal cost-sharing requirements for the project.
¶
SEC. 1026.
CLARIFICATION OF IMPACTS TO OTHER FEDERAL FACILITIES..
33 USC 2227. In any case where the modification or construction of a water resources development project carried out by the Secretary adversely impacts other Federal facilities, the Secretary may accept from other Federal agencies such funds as may be necessary to address the adverse impact, including by removing, relocating, or reconstructing those facilities.128 STAT. 1230
¶
(a)
In General.—.
The Secretary may implement any response action the Secretary determines to be necessary at a site where—
¶
(1)
the Secretary has carried out a project under civil works authority of the Secretary that includes placing sand on a beach; and
¶
(2)
as a result of the project described in paragraph (1), military munitions that were originally released as a result of Department of Defense activities are deposited on the beach, posing a threat to human health or the environment.
¶
(b)
Response Action Funding.—.
A response action described in subsection (a) shall be funded from amounts made available to the agency within the Department of Defense responsible for the original release of the munitions.
¶
(a)
In General.—.
The Secretary may carry out measures to improve fish species habitat within the boundaries and downstream of a water resources project constructed by the Secretary that includes a fish hatchery if the Secretary—
¶
(1)
has been explicitly authorized to compensate for fish losses associated with the project; and
¶
(2)
determines that the measures are—
¶
(A)
feasible;
¶
(B)
consistent with authorized project purposes and the fish hatchery; and
¶
(C)
in the public interest.
¶
(1)
In general.—.
Subject to paragraph (2), the non-Federal interest shall contribute 35 percent of the total cost of carrying out activities under this section, including the costs relating to the provision or acquisition of required land, easements, rights-of-way, dredged material disposal areas, and relocations.
¶
(2)
Operation and maintenance.—.
The non-Federal interest shall contribute 100 percent of the costs of operation, maintenance, replacement, repair, and rehabilitation of the measures carried out under this section.
¶
SEC. 1029.
CLARIFICATION OF INTERAGENCY SUPPORT AUTHORITIES..
Section 234 of the Water Resources Development Act of 1996 (33 U.S.C. 2323a) is amended—
¶
(1)
in subsection (a), by striking “other Federal agencies,” and inserting “Federal departments or agencies, nongovernmental organizations,”;
¶
(2)
in subsection (b), by inserting “or foreign governments” after “organizations”;
¶
(3)
in subsection (c), by inserting “and restoration” after “protection”; and
¶
(4)
in subsection (d)—
¶
(A)
in the first sentence, by striking “There is” and inserting “(1) In general.—There is”; and
¶
(B)
in the second sentence—
¶
(i)
by striking “The Secretary” and inserting “(2) Acceptance of funds.—The Secretary”; and
¶
(ii)
by striking “other Federal agencies,” and inserting “Federal departments or agencies, nongovernmental organizations,”.128 STAT. 1231
¶
(1)
Definition of continuing authority program project.—.
In this subsection, the term “continuing authority program” means 1 of the following authorities:
¶
(H)
Section 103 of the River and Harbor Act of 1962 (Public Law 87–874; 76 Stat. 1178).
¶
(2)
Prioritization.—.
Deadline.Federal Register, publication.Web posting.Criteria. Not later than 1 year after the date of enactment of this Act, the Secretary shall publish in the Federal Register and on a publicly available website, the criteria the Secretary uses for prioritizing annual funding for continuing authority program projects.
¶
(3)
Annual report.—.
Federal Register, publication.Web posting. Not later than 1 year after the date of enactment of this Act and each year thereafter, the Secretary shall publish in the Federal Register and on a publicly available website, a report on the status of each continuing authority program, which, at a minimum, shall include—
¶
(A)
the name and a short description of each active continuing authority program project;
¶
(B)
the cost estimate to complete each active project; and
¶
(C)
the funding available in that fiscal year for each continuing authority program.
¶
(4)
Congressional notification.—.
Records. On publication in the Federal Register under paragraphs (2) and (3), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a copy of all information published under those paragraphs.
¶
(b)
Small River and Harbor Improvement Projects.—.
Section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577) is amended—
¶
(1)
in subsection (a), by striking “$35,000,000” and inserting “$50,000,000”; and
¶
(2)
in subsection (b), by striking “$7,000,000” and inserting “$10,000,000”.128 STAT. 1232
¶
(c)
Shore Damage Prevention or Mitigation.—.
Section 111(c) of the River and Harbor Act of 1968 (33 U.S.C. 426i(c)) is amended by striking “$5,000,000” and inserting “$10,000,000”.
¶
(1)
In general.—.
Section 204 of the Water Resources Development Act of 1992 (33 U.S.C. 2326) is amended—
¶
(A)
in subsection (c)(1)(C), by striking “$5,000,000” and inserting “$10,000,000”; and
¶
(B)
in subsection (g), by striking “$30,000,000” and inserting “$50,000,000”.
¶
(2)
Applicability.—.
Section 2037 of the Water Resources Development Act of 2007 (121 Stat. 1094)33 USC 2326 note. is amended by adding at the end the following:
¶
“(c)
Applicability.—.
The amendment made by subsection (a) shall not apply to any project authorized under this Act if a report of the Chief of Engineers for the project was completed prior to the date of enactment of this Act.”
¶
(e)
Small Flood Control Projects.—.
Section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s) is amended in the third sentence by striking “$7,000,000” and inserting “$10,000,000”.
¶
(f)
Project Modifications for Improvement of Environment.—.
Section 1135(d) of the Water Resources Development Act of 1986 (33 U.S.C. 2309a(d)) is amended—
¶
(1)
in the second sentence, by striking “Not more than 80 percent of the non-Federal share may be” and inserting “The non-Federal share may be provided”; and
¶
(2)
in the third sentence, by striking “$5,000,000” and inserting “$10,000,000”.
¶
(g)
Aquatic Ecosystem Restoration.—.
Section 206(d) of the Water Resources Development Act of 1996 (33 U.S.C. 2330(d)) is amended by striking “$5,000,000” and inserting “$10,000,000”.
¶
(h)
Floodplain Management Services.—.
Section 206(d) of the Flood Control Act of 1960 (33 U.S.C. 709a(d)) is amended by striking “$15,000,000” and inserting “$50,000,000”.
¶
(i)
Emergency Streambank and Shoreline Protection.—.
Section 14 of the Flood Control Act of 1946 (33 U.S.C. 701r) is amended—
¶
(1)
by striking “$15,000,000” and inserting “$20,000,000”; and
¶
(2)
by striking “$1,500,000” and inserting “$5,000,000”.
¶
(a)
In General.—.
Section 203 of the Water Resources Development Act of 2000 (33 U.S.C. 2269) is amended—
¶
(1)
in subsection (d)(1)(B)—
¶
(A)
by striking “The ability” and inserting the following:
¶
; and
¶
(B)
by adding at the end the following:
¶
“(ii)
Determination.—.
Deadline.Guidance. Not later than 180 days after the date of enactment of this clause, the Secretary shall issue guidance on the procedures described in clause (i).”
¶
; and
¶
(2)
by striking subsection (e) and inserting the following:
¶
“(e)
Restrictions.—.
The Secretary is authorized to carry out activities under this section for fiscal years 2015 through 2024.”
¶
128 STAT. 1233
¶
(b)
Cooperative Agreements With Indian Tribes.—.
33 USC 2339a. The Secretary may enter into a cooperative agreement with an Indian tribe (or a designated representative of an Indian tribe) to carry out authorized activities of the Corps of Engineers to protect fish, wildlife, water quality, and cultural resources.
¶
SEC. 1032.
TERRITORIES OF THE UNITED STATES..
Section 1156 of the Water Resources Development Act of 1986 (33 U.S.C. 2310) is amended—
¶
(1)
by striking “The Secretary shall waive” and inserting “(a) In General.—The Secretary shall waive”;
¶
(2)
in subsection (a) (as so designated), by inserting “Puerto Rico,” before “and the Trust Territory of the Pacific Islands”; and
¶
(3)
by adding at the end the following:
¶
“(b)
Inflation Adjustment.—.
Time period. The Secretary shall adjust the dollar amount specified in subsection (a) for inflation for the period beginning on November 17, 1986, and ending on the date of enactment of this subsection.”
¶
(a)
In General.—.
To the greatest extent practicable, the Secretary shall encourage and incorporate corrosion prevention activities at water resources development projects.
¶
(b)
Activities.—.
In carrying out subsection (a), the Secretary, to the greatest extent practicable, shall ensure that contractors performing work for water resources development projects—
¶
(1)
use best practices to carry out corrosion prevention activities in the field;
¶
(2)
use industry-recognized standards and corrosion mitigation and prevention methods when—
¶
(A)
determining protective coatings;
¶
(B)
selecting materials; and
¶
(C)
determining methods of cathodic protection, design, and engineering for corrosion prevention;
¶
(3)
use certified coating application specialists and cathodic protection technicians and engineers;
¶
(4)
use best practices in environmental protection to prevent environmental degradation and to ensure careful handling of all hazardous materials;
¶
(5)
demonstrate a history of employing industry-certified inspectors to ensure adherence to best practices and standards; and
¶
(6)
demonstrate a history of compliance with applicable requirements of the Occupational Safety and Health Administration.
¶
(c)
Corrosion Prevention Activities Defined.—.
In this section, the term “corrosion prevention activities” means—
¶
(1)
the application and inspection of protective coatings for complex work involving steel and cementitious structures, including structures that will be exposed in immersion;
¶
(2)
the installation, testing, and inspection of cathodic protection systems; and
¶
(3)
any other activities related to corrosion prevention the Secretary determines appropriate.128 STAT. 1234
¶
(a)
In General.—.
To the greatest extent practicable, the Secretary shall encourage and incorporate advanced modeling technologies, including 3-dimensional digital modeling, that can expedite project delivery or improve the evaluation of water resources development projects that receive Federal funding by—
¶
(1)
accelerating and improving the environmental review process;
¶
(2)
increasing effective public participation;
¶
(3)
enhancing the detail and accuracy of project designs;
¶
(4)
increasing safety;
¶
(5)
accelerating construction and reducing construction costs; or
¶
(6)
otherwise achieving the purposes described in paragraphs (1) through (5).
¶
(b)
Activities.—.
In carrying out subsection (a), the Secretary, to the greatest extent practicable, shall—
¶
(1)
compile information related to advanced modeling technologies, including industry best practices with respect to the use of the technologies;
¶
(2)
disseminate to non-Federal interests the information described in paragraph (1); and
¶
(3)
promote the use of advanced modeling technologies.
¶
(a)
Definition of Floating Cabin.—.
In this section, the term “floating cabin” means a vessel (as defined in section 3 of title 1, United States Code) that has overnight accommodations.
¶
(b)
Recreational Access.—.
The Secretary shall allow the use of a floating cabin on waters under the jurisdiction of the Secretary in the Cumberland River basin if—
¶
(1)
the floating cabin—
¶
(A)
is in compliance with regulations for recreational vessels issued under chapter 43 of title 46, United States Code, and section 312 of the Federal Water Pollution Control Act (33 U.S.C. 1322);
¶
(B)
is located at a marina leased by the Corps of Engineers; and
¶
(C)
is maintained by the owner to required health and safety standards; and
¶
(2)
the Secretary has authorized the use of recreational vessels on such waters.
¶
(a)
In General.—.
Determination. If requested by a non-Federal interest, the Secretary shall carry out a locally preferred plan that provides a higher level of protection than a flood risk management project authorized under this Act if the Secretary determines that—
¶
(1)
the plan is technically feasible and environmentally acceptable; and
¶
(2)
the benefits of the plan exceed the costs of the plan.
¶
(b)
Non-Federal Cost Share.—.
If the Secretary carries out a locally preferred plan under subsection (a), the Federal share of the cost of the project shall be not greater than the share as provided by law for elements of the national economic development plan.128 STAT. 1235
¶
(a)
In General.—.
Section 156 of the Water Resources Development Act of 1976 (42 U.S.C. 1962d–5f) is amended—
¶
(1)
by striking “The Secretary” and inserting the following:
¶
; and
¶
(2)
by adding at the end the following:
¶
“(b)
Review.—.
Study.Time period. Notwithstanding subsection (a), the Secretary shall, at the request of the non-Federal interest, carry out a study to determine the feasibility of extending the period of nourishment described in subsection (a) for a period not to exceed 15 additional years beyond the maximum period described in subsection (a).
¶
“(1)
In general.—.
As part of the review described in subsection (b), the non-Federal interest shall submit to the Secretary a plan for reducing risk to people and property during the life of the project.
¶
“(2)
Inclusion of plan in recommendation to congress.—.
The Secretary shall include the plan described in subsection (a) in the recommendations to Congress described in subsection (d).
¶
“(d)
Report to Congress.—.
Recommenda-tions. Upon completion of the review described in subsection (b), the Secretary shall—
¶
“(1)
submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives any recommendations of the Secretary related to the review; and
¶
“(2)
include in the subsequent annual report to Congress required under section 7001 of the Water Resources Reform and Development Act of 2014, any recommendations that require specific congressional authorization.
¶
“(e)
Special Rule.—.
Time periods. Notwithstanding any other provision of this section, for any existing authorized water resources development project for which the maximum period for nourishment described in subsection (a) will expire within the 5 year-period beginning on the date of enactment of the Water Resources Reform and Development Act of 2014, that project shall remain eligible for nourishment for an additional 3 years after the expiration of such period.”
¶
(1)
In general.—.
Deadline. Not later than 90 days after the date of enactment of this Act, the Secretary shall initiate a review of all authorized water resources development projects for which the Secretary is authorized to provide periodic nourishment under section 156 of the Water Resources Development Act of 1976 (42 U.S.C. 1962d–5f).
¶
(2)
Scope of review.—.
In carrying out the review under paragraph (1), the Secretary shall assess the Federal costs associated with that nourishment authority and the projected benefits of each project.
¶
(3)
Report to congress.—.
Public information. Upon completion of the review under paragraph (1), the Secretary shall issue to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report on the results of that review, including any proposed changes the Secretary may recommend to the nourishment authority.128 STAT. 1236
¶
SEC. 1038.
REDUCTION OF FEDERAL COSTS FOR HURRICANE AND STORM DAMAGE REDUCTION PROJECTS..
Section 204 of the Water Resources Development Act of 1992 (33 U.S.C. 2326) (as amended by section 1030(d)(1)) is amended—
¶
(1)
in subsection (a)—
¶
(A)
in paragraph (1), by inserting “or used in” after “obtained through”;
¶
(B)
in paragraph (3)(C), by inserting “for the purposes of improving environmental conditions in marsh and littoral systems, stabilizing stream channels, enhancing shorelines, and supporting State and local risk management adaptation strategies” before the period at the end; and
¶
(C)
by adding at the end the following:
¶
“(4)
Reducing costs.—.
To reduce or avoid Federal costs, the Secretary shall consider the beneficial use of dredged material in a manner that contributes to the maintenance of sediment resources in the nearby coastal system.”
¶
(2)
in subsection (d)—
¶
(A)
by striking the subsection designation and heading and inserting the following:
¶
“(d)
Selection of Dredged Material Disposal Method for Purposes Related to Environmental Restoration or Storm Damage and Flood Reduction.—.
”
¶
; and
¶
(B)
in paragraph (1), by striking “in relation to” and all that follows through the period at the end and inserting
¶
“in relation to—
¶
“(A)
the environmental benefits, including the benefits to the aquatic environment to be derived from the creation of wetlands and control of shoreline erosion; or
¶
“(B)
the flood and storm damage and flood reduction benefits, including shoreline protection, protection against loss of life, and damage to improved property.”
¶
; and
¶
(3)
in subsection (e), by striking paragraph (1) and inserting the following:
¶
“(1)
cooperate with any State or group of States in the preparation of a comprehensive State or regional sediment management plan within the boundaries of the State or among States;”
¶