North American Energy Infrastructure Act
To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.
Introduced
Oct 22, 2013
Committee
Jun 19, 2014
Passed House
Jun 24, 2014
Passed Senate
Next step
To President
Became law
+3 sections added
−0 removed
~3 modified
=3 unchanged
+584 words ·
−361 words
SEC. 2. Finding Modified
SEC. 2. Finding. Congress finds that the United States should establish a more uniform, transparent, and modern process for the construction, connection, operation, and maintenance of oil and natural gas pipelines and electric transmission facilities for the import and export of oil, oil and natural gas, gas and the transmission of electricity to and from Canada and Mexico, in pursuit of a more secure and efficient North American energy market.
SEC. 3. Authorization of certain energy infrastructure projects at the national boundary of the United States Modified
SEC. 3. Authorization of certain energy infrastructure projects at the national boundary of the United States.
(a) Authorization. Except as provided in subsections (d) subsection (c) and (e), section 7, no person may construct, connect, operate, or maintain a cross-border segment of an oil or natural gas pipeline or electric transmission facility at the national boundary of the United States for the import or export of oil, natural gas, oil or the transmission of electricity to or from Canada or Mexico without obtaining approval a certificate of crossing for the construction, connection, operation, or maintenance of the cross-border segment under this section.
(b) Approval. Certificate of crossing.
(1) Requirement. Not later than 120 days after receiving final action is taken under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to a cross-border segment for which a request for approval of construction, connection, operation, or maintenance is received under this section, the relevant official identified under paragraph (2), in consultation with appropriate Federal agencies, shall approve issue a certificate of crossing for the request cross-border segment unless the relevant official finds that the construction, connection, operation, or maintenance of the cross-border segment is not in the national security interests public interest of the United States.
(2) Relevant official. The relevant official referred to in paragraph (1) is—
(A) the Secretary of Commerce State with respect to oil pipelines; and
(B) the Federal Secretary of Energy Regulatory Commission with respect to natural gas pipelines; and electric transmission facilities.
(A) the Electric Reliability Organization and the applicable regional entity; and
(B) any Regional Transmission Organization or Independent System Operator with operational or functional control over the cross-border segment of the electric transmission facility.
(1) if the pipeline or facility cross-border segment is operating at such national boundary for such import import, export, or export transmission as of the date of enactment of this Act;
(2) if a permit described in subsection (c) section 6 for such construction, connection, operation, or maintenance has been issued;
(3) if approval a certificate of crossing for such construction, connection, operation, or maintenance has previously been obtained issued under this section; or
(4) if an application for a permit described in subsection (c) section 6 for such construction, connection, operation, or maintenance is pending on the date of enactment of this Act, until the earlier of—
(A) the date on which such application is denied; or
(B) July 1, 2016.
(d) Effect of other laws.
(2) Natural Gas Act. Nothing in this section or section 7 shall affect the requirement to obtain approval or authorization under sections 3 and 7 of the Natural Gas Act for the siting, construction, or operation of any facility to import or export natural gas.
(3) Energy Policy and Conservation Act. Nothing in this section or section 7 shall affect the authority of the President under section 103(a) of the Energy Policy and Conservation Act.
SEC. 6. No Presidential permit required Added
SEC. 6. No Presidential permit required. No Presidential permit (or similar permit) required under Executive Order No. 13337 (3 U.S.C. 301 note), Executive Order No. 11423 (3 U.S.C. 301 note), section 301 of title 3, United States Code, Executive Order No. 12038, Executive Order No. 10485, or any other Executive order shall be necessary for the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility, or any cross-border segment thereof.
SEC. 7. Modifications to existing projects Added
SEC. 7. Modifications to existing projects. No certificate of crossing under section 3, or permit described in section 6, shall be required for a modification to the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility—
(1) that is operating for the import or export of oil or natural gas or the transmission of electricity to or from Canada or Mexico as of the date of enactment of the Act;
(2) for which a permit described in section 6 for such construction, connection, operation, or maintenance has been issued; or
(3) for which a certificate of crossing for the cross-border segment of the pipeline or facility has previously been issued under section 3.
SEC. 8. Effective date; rulemaking deadlines Modified
SEC. 6. 8. Effective date; rulemaking deadlines.
(a) Effective date. Sections 3, 4, and 5, 3 through 7, and the amendments made by such sections, shall take effect on July 1, 2015.
(b) Rulemaking deadlines. Each relevant official described in section 3(b)(2) shall—
(1) not later than 180 days after the date of enactment of this Act, publish in the Federal Register notice of a proposed rulemaking to carry out the applicable requirements of section 3; and
(2) not later than 1 year after the date of enactment of this Act, publish in the Federal Register a final rule to carry out the applicable requirements of section 3.
SEC. 9. Definitions Added
SEC. 9. Definitions. In this Act—
(1) the term cross-border segment means the portion of an oil or natural gas pipeline or electric transmission facility that is located at the national boundary of the United States with either Canada or Mexico;
(2) the term modification includes a reversal of flow direction, change in ownership, volume expansion, downstream or upstream interconnection, or adjustment to maintain flow (such as a reduction or increase in the number of pump or compressor stations);
(3) the term natural gas has the meaning given that term in section 2 of the Natural Gas Act (15 U.S.C. 717a);
(4) the term oil means petroleum or a petroleum product;
(5) the terms Electric Reliability Organization and regional entity have the meanings given those terms in section 215 of the Federal Power Act (16 U.S.C. 824o); and
(6) the terms Independent System Operator and Regional Transmission Organization have the meanings given those terms in section 3 of the Federal Power Act (16 U.S.C. 796).