Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
National Defense Authorization Act for Fiscal Year 2014.
¶
SECTION 1.
SHORT TITLE..
This Act may be cited as the “National Defense Authorization Act for Fiscal Year 2014”.
¶
(1)
Division A—Department of Defense Authorizations.
¶
(2)
Division B—Military Construction Authorizations.
¶
(3)
Division C—Department of Energy National Security Authorizations and Other Authorizations.
¶
(4)
Division D—Funding Tables.
¶
SEC. 3.
CONGRESSIONAL DEFENSE COMMITTEES..
10 USC 101 note. For purposes of this Act, the term “congressional defense committees” has the meaning given that term in section 101(a)(16) of title 10, United States Code.
¶
SEC. 4.
EXPLANATORY STATEMENT..
The explanatory statement regarding this Act, printed in the House section of the Congressional Record on or about December 11, 2013, by the Chairman of the Committee on Armed Services of the House of Representatives, shall have the same effect with respect to the implementation of this Act as if it were a joint explanatory statement of a committee of conference.
¶
DIVISION A — DEPARTMENT OF DEFENSE AUTHORIZATIONS
TITLE I — PROCUREMENT
Subtitle A — Authorization of Appropriations
SEC. 101.
AUTHORIZATION OF APPROPRIATIONS..
Funds are hereby authorized to be appropriated for fiscal year 2014 for procurement for the Army, the Navy and the Marine Corps, the Air Force, and Defense-wide activities, as specified in the funding table in section 4101.
¶
Subtitle B — Army Programs
(a)
Limitation.—.
Time period. Of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for weapons and tracked combat vehicles, Army, for the procurement or upgrade of Stryker vehicles, not more than 75 percent may be obligated or expended until a period of 15 days has elapsed following the date on which the Secretary of the Army submits the report under subsection (b).
¶
(b)
Report Required.—.
The Secretary of the Army shall submit to the congressional defense committees a report on the status of the Stryker vehicle spare parts inventory located in Auburn, Washington, cited in the report of the Inspector General of the Department of Defense (number 2013–025) dated November 30, 2012. The report submitted under this subsection shall include the following:
¶
(1)
The status of the implementation by the Secretary of the recommendations specified on pages 30 to 34 of the report by the Inspector General.
¶
(2)
The value of the parts remaining in warehouse that may still be used by the Secretary for the repair, upgrade, or reset of Stryker vehicles.
¶
(3)
The value of the parts remaining in the warehouse that are no longer usable by the Secretary for the repair, upgrade, or reset of Stryker vehicles.
¶
(4)
A cost estimate of the monthly cost of maintaining the inventory of such parts that are no longer usable by the Secretary.
¶
(5)
Any other matters the Secretary considers appropriate.
¶
(1)
budget uncertainty and reduced defense procurements have had negative impacts on the tactical vehicle industrial base; and
¶
(2)
in such environment, the Army should consider innovative contracting and acquisition strategies to maximize cost 127 STAT. 691 savings, improve the sustainment of the tactical vehicle industrial base, and reduce risk during this downturn in defense procurement.
¶
(1)
Study.—.
The Secretary of the Army, in consultation with the Under Secretary of Defense for Acquisition, Technology, and Logistics, shall conduct a study of the desirability and feasibility of requesting legislative authority, in accordance with section 2306b of title 10, United States Code, to enter into one or more multiyear, multivehicle contracts for the procurement of tactical vehicles beginning in fiscal year 2015 or thereafter.
¶
(2)
Report.—.
Not later than 90 days after the date of the enactment of this Act, the Secretary, in consultation with the Under Secretary of Defense for Acquisition, Technology, and Logistics, shall submit to the congressional defense committees a report on the possible multiyear, multivehicle contracting options and other innovative contracting options considered in the study under paragraph (1). Such report should include the following:
¶
(A)
A business case analysis of a multiyear, multivehicle contract for tactical vehicles, including any potential increases in cost, savings, or risk that may derive from such a contract in comparison to standard contracting methods.
¶
(B)
An evaluation of whether the Secretary requires legislative action to enter into such a multiyear, multivehicle contract.
¶
(C)
Any other matters the Secretary determines appropriate.
¶
Subtitle C — Navy Programs
(a)
Cost Limitation Baseline for Lead Ship.—.
Subsection (a) of section 122 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109–364; 120 Stat. 2104) is amended to read as follows:
¶
“(1)
Lead ship.—.
The total amount obligated from funds appropriated or otherwise made available for Shipbuilding and Conversion, Navy, or for any other procurement account, for the aircraft carrier designated as CVN–78 may not exceed $12,887,000,000 (as adjusted pursuant to subsection (b)).
¶
“(2)
Follow-on ships.—.
The total amount obligated from funds appropriated or otherwise made available for Shipbuilding and Conversion, Navy, or for any other procurement account, for the construction of any ship that is constructed in the CVN–78 class of aircraft carriers after the lead ship of that class may not exceed $11,498,000,000 (as adjusted pursuant to subsection (b)).”
¶
(A)
in the matter preceding paragraph (1), by striking “CVN–21” and inserting “CVN–78”;
¶
(B)
in paragraph (1), by striking “2006” and inserting “2013”; and
¶
(C)
by adding at the end the following new paragraph:
¶
“(7)
With respect to the aircraft carrier designated as CVN–78, the amounts of increases or decreases in costs of that ship that are attributable solely to an urgent and unforeseen requirement identified as a result of the shipboard test program.”
¶
(2)
Limitation on adjustment.—.
Such section is further amended by adding at the end the following new subsection:
¶
“(e)
Limitation on Shipboard Test Program Cost Adjustment.—.
Determinations.Certifications. With respect to using the authority under subsection (b)(7) to adjust the amount set forth in subsection (a)(1) for the aircraft carrier designated as CVN–78 for reasons relating to an urgent and unforeseen requirement identified as a result of the shipboard test program, the Secretary may only use such authority if—
¶
“(1)
the Secretary determines, and certifies to the congressional defense committees, that such requirement was not known before the date of the submittal to Congress of the budget for fiscal year 2014 (as submitted pursuant to section 1105 of title 31, United States Code);
¶
“(2)
the Secretary determines, and certifies to the congressional defense committees, that waiting on an action by Congress to raise the cost cap specified in such subsection (a)(1) to account for such requirement will result in a delay in the delivery of that ship or a delay in the date of initial operating capability of that ship; and
¶
“(3)
Reports. the Secretary submits to the congressional defense committees a report setting forth a description of such requirement before the obligation of additional funds pursuant to such authority.”
¶
(c)
Requirements for CVN–79.—.
Such section is further amended by adding after subsection (e), as added by subsection (b)(2), the following new subsection:
¶
“(1)
Quarterly cost estimate.—.
Reports. The Secretary of the Navy shall submit to the congressional defense committees on a quarterly basis a report setting forth the most current cost estimate for the aircraft carrier designated as CVN–79 (as estimated by the program manager). Each cost estimate shall include the current percentage of completion of the program, the total costs incurred, and an estimate of costs at completion for ship construction, Government-furnished equipment, and engineering and support costs.
¶
“(2)
Direction for negotiating certain contracts.—.
The Secretary shall ensure that each prime contract for the aircraft carrier designated as CVN–79 includes an incentive fee structure that will, throughout the period of performance of the contract, provide incentives for each contractor to meet the portion of the cost of the ship, as limited by subsection (a)(2) and adjusted pursuant to subsection (b), for which the contractor is responsible.”
¶
(d)
Conforming Amendment.—.
The heading of such section is amended to read as follows:127 STAT. 693
¶
(e)
Clerical Amendment.—.
The table of contents at the beginning of such Act is amended by striking the item relating to section 122 and inserting the following:
¶
SEC. 122.
REPEAL OF REQUIREMENTS RELATING TO PROCUREMENT OF FUTURE SURFACE COMBATANTS..
Section 125 of the National Defense Authorization Act for Fiscal Year 2010 (Public Law 111–84; 123 Stat. 2214; 10 U.S.C. 7291 note) is repealed.
¶
(a)
Authority for Multiyear Procurement.—.
Subject to section 2306b of title 10, United States Code, the Secretary of the Navy may enter into one or more multiyear contracts, beginning with the fiscal year 2014 program year, for the procurement of E–2D aircraft.
¶
(b)
Condition for Out-year Contract Payments.—.
A contract entered into under subsection (a) shall provide that any obligation of the United States to make a payment under the contract for a fiscal year after fiscal year 2014 is subject to the availability of appropriations for that purpose for such later fiscal year.
¶
(a)
Limitation.—.
None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for construction or advanced procurement of materials for the Littoral Combat Ships designated as LCS 25 or LCS 26 may be obligated or expended until the Secretary of the Navy submits to the congressional defense committees each of the following:
¶
(1)
The report required by subsection (b)(1).
¶
(2)
Determination. A coordinated determination by the Director of Operational Test and Evaluation and the Under Secretary of Defense for Acquisition, Technology, and Logistics that successful completion of the test evaluation master plan for both seaframes and each mission module will demonstrate operational effectiveness and operational suitability.
¶
(3)
Certification. A certification that the Joint Requirements Oversight Council—
¶
(A)
has reviewed the capabilities of the legacy systems that the Littoral Combat Ship is planned to replace and has compared such capabilities to the capabilities to be provided by the Littoral Combat Ship;
¶
(B)
has assessed the adequacy of the current capabilities development document for the Littoral Combat Ship to meet the requirements of the combatant commands and to address future threats as reflected in the latest assessment by the defense intelligence community; and
¶
(C)
has either validated the current capabilities development document or directed the Secretary to update the current capabilities development document based on the performance of the Littoral Combat Ship and mission modules to date.127 STAT. 694
¶
(4)
A report on the expected performance of each seaframe variant and mission module against the current or updated capabilities development document.
¶
(5)
Certification. Certification that a capability production document will be completed for each mission module before operational testing.
¶
(1)
In general.—.
Coordination. Not later than 60 days after the date of the enactment of this Act, the Chief of Naval Operations, in coordination with the Director of Operational Test and Evaluation, shall submit to the congressional defense committees a report on the current concept of operations and expected survivability attributes of each of the Littoral Combat Ship seaframes.
¶
(A)
A review of the current concept of operations of the Littoral Combat Ship and a comparison of such concept of operations with the original concept of operations of the Littoral Combat Ship.
¶
(B)
An assessment of the ability of the Littoral Combat Ship to carry out the core missions of the Cooperative Strategy for 21st Century Seapower of the Navy.
¶
(C)
A comparison of the combat capabilities for the three missions assigned to the Littoral Combat Ship seaframes (anti-surface warfare, mine countermeasures, and anti-submarine warfare) with the combat capabilities for each of such missions of the systems the Littoral Combat Ship is replacing.
¶
(D)
An assessment of expected survivability of the Littoral Combat Ship seaframes in the context of the planned employment of the Littoral Combat Ship as described in the concept of operations.
¶
(E)
The current status of operational testing for the seaframes and the mission modules of the Littoral Combat Ship.
¶
(F)
An updated test and evaluation master plan for the Littoral Combat Ship.
¶
(G)
A review of survivability testing, modeling, and simulation conducted to date on the two seaframes of the Littoral Combat Ship.
¶
(H)
An updated assessment of the endurance of the Littoral Combat Ship at sea with respect to maintenance, fuel use, and sustainment of crew and mission modules.
¶
(I)
An assessment of the adequacy of current ship manning plans for the Littoral Combat Ship and an assessment of the impact that increased manning has on design changes and the endurance of the Littoral Combat Ship.
¶
(J)
A list of the casualty reports to date on each Littoral Combat Ship, including a description of the impact of such casualties on the design or ability of that Littoral Combat Ship to perform assigned missions.
¶
(3)
Form.—.
The report required by paragraph (1) shall be submitted in classified form and unclassified form.127 STAT. 695
¶
Subtitle D — Air Force Programs
SEC. 131.
REPEAL OF REQUIREMENT FOR MAINTENANCE OF CERTAIN RETIRED KC–135E AIRCRAFT..
Section 135 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109–364; 120 Stat. 2114), as amended by section 131 of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 (Public Law 110–417; 122 Stat. 4377), is amended—
¶
(1)
by striking “(a) Limitation.—”; and
¶
(2)
by striking subsection (b).
¶
(a)
Authority for Multiyear Procurement.—.
Subject to section 2306b of title 10, United States Code, the Secretary of the Air Force may enter into one or more multiyear contracts, beginning with the fiscal year 2014 program year, for the procurement of C–130J aircraft for the Department of the Air Force and the Department of the Navy.
¶
(b)
Condition for Out-year Contract Payments.—.
A contract entered into under subsection (a) shall provide that any obligation of the United States to make a payment under the contract for a fiscal year after fiscal year 2014 is subject to the availability of appropriations for that purpose for such later fiscal year.
¶
SEC. 133.
PROHIBITION ON CANCELLATION OR MODIFICATION OF AVIONICS MODERNIZATION PROGRAM FOR C–130 AIRCRAFT..
¶
(a)
Prohibition.—.
None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Air Force may be used to—
¶
(1)
take any action to cancel or modify the avionics modernization program of record for C–130 aircraft; or
¶
(2)
initiate an alternative communication, navigation, surveillance, and air traffic management program for C–130 aircraft that is designed or intended to replace the avionics modernization program described in paragraph (1).
¶
(b)
Comptroller General Report.—.
Not later than April 1, 2014, the Comptroller General of the United States shall submit to the congressional defense committees a sufficiency review of the cost-benefit analysis conducted under section 143(b) of the National Defense Authorization Act for Fiscal Year 2013 (Public Law 112–239; 126 Stat. 1662), including any findings and recommendations relating to such review.
¶
SEC. 134.
PROHIBITION OF PROCUREMENT OF UNNECESSARY C–27J AIRCRAFT BY THE AIR FORCE..
None of the funds authorized to be appropriated by the National Defense Authorization Act for Fiscal Year 2012 (Public Law 112–81) for aircraft procurement, Air Force, that remain available to the Secretary of the Air Force on or after the date of the enactment of this Act may be obligated or expended for the procurement of additional C-27J aircraft that are not on contract as of June 1, 2013.127 STAT. 696
¶
Subtitle E — Defense-wide, Joint, and Multiservice Matters
(a)
Consolidated Budget Justification Display.—.
Chapter 9 of title 10, United States Code, is amended by adding after section 235 the following new section:
¶
“(a)
Budget Justification Display.—.
The Secretary of Defense shall submit to Congress, as a part of the defense budget materials for each fiscal year after fiscal year 2014, a consolidated budget justification display that covers all programs and activities associated with the procurement of personal protection equipment during the period covered by the future-years defense program submitted in that fiscal year under section 221.
¶
“(b)
Requirements for Budget Display.—.
The consolidated budget justification display under subsection (a) for a fiscal year shall include the following:
¶
“(1)
The amount for personal protection equipment included in both the base budget of the President and any overseas contingency operations budget of the President.
¶
“(2)
A brief description of each category of personal protection equipment for each military department planned to be procured and developed.
¶
“(3)
For each category planned to be procured using funds made available for operation and maintenance (whether under the base budget or any overseas contingency operations budget)—
¶
“(A)
the relevant appropriations account, budget activity, and subactivity group for the category; and
¶
“(B)
the funding profile for the fiscal year as requested, including cost and quantities, and an estimate of projected investments or procurements for each of the subsequent five fiscal years.
¶
“(4)
For each category planned to be developed using funds made available for research, development, test, and evaluation (whether under the base budget or any overseas contingency operations budget)—
¶
“(A)
the relevant appropriations account, program, project or activity; program element number, and line number; and
¶
“(B)
the funding profile for the fiscal year as requested and an estimate of projected investments for each of the subsequent five fiscal years.
¶
“(1)
The terms ‘budget’ and ‘defense budget materials’ have the meaning given those terms in section 234 of this title.
¶
“(2)
The term ‘category of personal protection equipment’ means the following:
¶
“(A)
Body armor components.
¶
“(B)
Combat helmets.
¶
“(C)
Combat protective eyewear.
¶
“(D)
Other items as determined appropriate by the Secretary.”
¶
127 STAT. 697
¶
(b)
Clerical Amendment.—.
10 USCprec. 221.The table of sections at the beginning of such chapter is amended by adding after the item relating to section 235 the following new item:
¶
SEC. 142.
REPEAL OF CERTAIN F–35 REPORTING REQUIREMENTS..
Section 122 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4157) is amended—
¶
(1)
by striking subsection (b); and
¶
(2)
by redesignating subsection (c) as subsection (b).
¶
SEC. 143.
LIMITATION ON AVAILABILITY OF FUNDS FOR RETIREMENT OF RQ–4 GLOBAL HAWK UNMANNED AIRCRAFT SYSTEMS AND A–10 AIRCRAFT..
¶
(1)
In general.—.
None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Department of Defense may be obligated or expended to make significant changes to manning levels with respect to covered aircraft or to retire, prepare to retire, or place in storage a covered aircraft.
¶
(A)
A–10 aircraft (except for such aircraft that the Secretary of the Air Force, as of April 9, 2013, plans to retire).
¶
(B)
RQ–4 Block 30 Global Hawk unmanned aircraft systems.
¶
(b)
Additional Limitation on Retirement of Certain A–10 Aircraft.—.
In addition to the limitation in subsection (a)(1), during the period preceding December 31, 2014, the Secretary of the Air Force may not retire, prepare to retire, or place in storage A–10 aircraft (except for such aircraft that the Secretary, as of April 9, 2013, plans to retire).
¶
(1)
In general.—.
Coordination. Not later than 180 days after the date of the enactment of this Act, the Secretary of Defense, in coordination with the Chairman of the Joint Chiefs of Staff, shall submit to the appropriate congressional committees a report on all high-altitude airborne intelligence, surveillance, and reconnaissance systems operated, or planned for future operation, by the Department of Defense.
¶
(A)
the intelligence, surveillance, and reconnaissance capabilities of each high-altitude intelligence, surveillance, and reconnaissance system covered by the report;
¶
(B)
the plans to upgrade such capabilities in the future;
¶
(C)
the fully-burdened cost-per-flight-hour of each such system;
¶
(D)
the number of requests for each such system made by commanders of the combatant commands during the five-year period prior to the report, including the percentage of such requests that have been fulfilled to meet the requirements of such commanders;127 STAT. 698
¶
(E)
a description of the assumptions used by the Secretary in carrying out this subsection; and
¶
(F)
any other information that the Secretary considers appropriate with respect to the analysis of high-altitude intelligence, surveillance, and reconnaissance systems.
¶
(3)
Form.—.
The report required by paragraph (1) shall be submitted in unclassified form, but may include a classified annex.
¶
(4)
Appropriate congressional committees defined.—.
In this section, the term “appropriate congressional committees” means—
¶
(A)
the Committee on Armed Services, the Committee on Appropriations, and the Select Committee on Intelligence of the Senate; and
¶
(B)
the Committee on Armed Services, the Committee on Appropriations, and the Permanent Select Committee on Intelligence of the House of Representatives.
¶
(d)
Construction.—.
Nothing in this section shall be construed to limit or otherwise affect the requirement to maintain the operational capability of RQ–4 Block 30 Global Hawk unmanned aircraft systems under section 154(b) of the National Defense Authorization Act for Fiscal Year 2013 (Public Law 112–239; 126 Stat. 1666).
¶
(a)
Authority.—.
Effective date.Time period. Beginning on the date that is 60 days after the date on which the Secretary of Defense submits the report under subsection (d)(1), the Secretary may transfer MC–12 Liberty intelligence, surveillance, and reconnaissance aircraft from the Air Force to the Army in accordance with the plan developed under subsection (b)(1).
¶
(1)
Plan required.—.
The Secretary of Defense shall develop a plan for the potential transfer of MC–12 Liberty intelligence, surveillance, and reconnaissance aircraft from the Air Force to the Army pursuant to subsection (a).
¶
(A)
ensure that any transfer described in such paragraph does not adversely affect ongoing intelligence, surveillance, and reconnaissance operations, including such operations in Afghanistan;
¶
(B)
identify the appropriate size, composition, and configuration of the fleet of MC–12 Liberty intelligence, surveillance, and reconnaissance aircraft required by the Army;
¶
(C)
identify the appropriate size, composition, configuration, and disposition of the remaining fleet of MC–12 Liberty intelligence, surveillance, and reconnaissance aircraft required by the Air Force;
¶
(D)
provide for the modification of the MC–12 Liberty intelligence, surveillance, and reconnaissance aircraft that are transferred to the Army pursuant to the plan in order to meet the long-term needs of the Army; and
¶
(E)
for any aircraft that are so transferred, include a time line for the orderly transfer of the aircraft in a manner consistent with subparagraph (A).
¶
(1)
Prohibition on availability of funds for procurement.—.
None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Army may be obligated or expended to procure additional aircraft under the Enhanced Medium Altitude Reconnaissance and Surveillance System program during fiscal year 2014.
¶
(2)
Conversion of aircraft.—.
The Secretary of the Army shall convert aircraft described in paragraph (3) to the Enhanced Medium Altitude Reconnaissance and Surveillance System program configuration to meet the requirements of the Army. The Secretary shall carry out this paragraph using funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2013 or 2014 for the Enhanced Medium Altitude Reconnaissance and Surveillance System program.
¶
(A)
MC–12 Liberty intelligence, surveillance, and reconnaissance aircraft of the Air Force that are transferred to the Army pursuant to subsection (a).
¶
(B)
Army Medium Altitude Multi-Intelligence intelligence, surveillance, and reconnaissance C–12 Quick Reaction Capability aircraft.
¶
(1)
In general.—.
Not later than the date on which the budget of the President for fiscal year 2015 is submitted to Congress pursuant to section 1105 of title 31, United States Code, the Secretary shall submit to the appropriate congressional committees a report on the plan required by subsection (b)(1).
¶
(2)
Form.—.
The report required by paragraph (1) shall be submitted in unclassified form, but may include a classified annex.
¶
(3)
Appropriate congressional committees defined.—.
In this subsection, the term “appropriate congressional committees” means—
¶
(A)
the Committee on Armed Services, the Committee on Appropriations, and the Select Committee on Intelligence of the Senate; and
¶
(B)
the Committee on Armed Services, the Committee on Appropriations, and the Permanent Select Committee on Intelligence of the House of Representatives.
¶
(1)
In general.—.
The Secretary of the Air Force shall develop a plan to implement the new acquisition strategy for the evolved expendable launch vehicle program described in the acquisition decision memorandum dated November 27, 2012.
¶
(2)
Matters included.—.
The plan to implement the new acquisition strategy for the evolved expendable launch vehicle program under paragraph (1) shall include a general description of how the Secretary will conduct competition with respect to awarding a contract to certified evolved expendable launch 127 STAT. 700 vehicle providers. Such description may include the following with respect to such acquisition strategy:
¶
(A)
The proposed cost, schedule, and performance.
¶
(B)
Mission assurance activities.
¶
(C)
The manner in which the contractor will operate under the Federal Acquisition Regulation.
¶
(D)
The effect of other contracts in which the contractor is entered into with the Federal Government, including the evolved expendable launch vehicle launch capability contract, the space station commercial resupply services contracts, and other relevant contracts regarding national security space and strategic programs.
¶
(E)
Any other areas the Secretary determines appropriate.
¶
(1)
In general.—.
At the same time that the Secretary issues a draft of the request for proposals with respect to a contract for the evolved expendable launch vehicle provider, the Secretary shall—
¶
(A)
Reports. submit to the appropriate congressional committees a report that includes the plan under subsection (a)(1); or
¶
(B)
Briefing. provide to such committees a briefing on such plan.
¶
(2)
Appropriate congressional committees defined.—.
In this subsection, the term “appropriate congressional committees” means the following:
¶
(A)
The congressional defense committees.
¶
(B)
The Committee on Science, Space, and Technology of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate.
¶
(C)
The Permanent Select Committee on Intelligence of the House of Representatives and the Select Committee on Intelligence of the Senate.
¶
SEC. 146.
REPORTS ON PERSONAL PROTECTION EQUIPMENT AND HEALTH AND SAFETY RISKS ASSOCIATED WITH EJECTION SEATS..
¶
(1)
In general.—.
Not later than 30 days after the date of the enactment of this Act, the Secretary of Defense shall enter into a contract with a federally funded research and development center to conduct a study to identify and assess cost-effective and efficient alternative means for the procurement and research and development of personal protection equipment that supports and promotes competition and innovation in the personal protection equipment industrial base.
¶
(2)
Submission.—.
Not later than 120 days after the date on which the contract is entered into under paragraph (1), the federally funded research and development center conducting the study under such paragraph shall submit to the Secretary the study, including any findings and recommendations.
¶
(A)
In general.—.
Not later than 30 days after the date on which the Secretary receives the study under paragraph (2), the Secretary shall submit to the congressional 127 STAT. 701 defense committees a report that includes the study under paragraph (1), the matters described in subparagraph (B), and any related findings, recommendations, comments, and plans of the Secretary.
¶
(i)
The findings and recommendations of the federally funded research and development center submitted to the Secretary under paragraph (2).
¶
(ii)
An assessment of current and future technologies that could markedly improve body armor, including by decreasing weight, increasing survivability, and making other relevant improvements.
¶
(iii)
An analysis of the capability of the personal protection equipment industrial base to leverage such technologies to produce the next generation body armor.
¶
(iv)
An assessment of alternative body armor acquisition models, including different types of contracting and budgeting practices of the Department of Defense.
¶
(4)
Personal protection equipment.—.
In this subsection, the term “personal protection equipment” includes—
¶
(A)
body armor components;
¶
(B)
combat helmets;
¶
(C)
combat protective eyewear;
¶
(D)
environmental and fire-resistant clothing; and
¶
(E)
other individual equipment items as determined appropriate by the Secretary.
¶
(1)
In general.—.
Not later than 180 days after the date of the enactment of this Act, the Secretary of the Air Force shall submit to the congressional defense committees a report setting forth an assessment of the risks to the health and safety of members of the Armed Forces of the ejection seats currently in operational use by the Air Force.
¶
(A)
An assessment of whether aircrew members wearing advanced helmets, night vision systems, helmet-mounted cueing system, or other helmet-mounted devices or attachments are at increased risk of serious injury or death during a high-speed ejection sequence.
¶
(B)
An analysis of how ejection seats currently in operational use provide protection against head, neck, and spinal cord injuries during an ejection sequence.
¶
(C)
An analysis of initiatives to decrease the risk of death or serious injury during an ejection sequence.
¶
(D)
The status of any testing or qualifications on upgraded ejection seats that may reduce the risk of death or serious injury during an ejection sequence.127 STAT. 702
¶
TITLE II — RESEARCH, DEVELOPMENT, TEST, AND EVALUATION
Subtitle A — Authorization of Appropriations
SEC. 201.
AUTHORIZATION OF APPROPRIATIONS..
Funds are hereby authorized to be appropriated for fiscal year 2014 for the use of the Department of Defense for research, development, test, and evaluation as specified in the funding table in section 4201.
¶
Subtitle B — Program Requirements, Restrictions, and Limitations
SEC. 211.
MODIFICATION OF REQUIREMENTS ON BIENNIAL STRATEGIC PLAN FOR THE DEFENSE ADVANCED RESEARCH PROJECTS AGENCY..
¶
(a)
Elements of Strategic Plan.—.
Subsection (b) of section 2352 of title 10, United States Code, is amended—
¶
(1)
by amending paragraph (1) to read as follows:
¶
“(1)
The strategic objectives of that agency, and the linkage between such objectives and the missions of the armed forces.”
¶
(2)
in paragraph (2)(A), by striking “goals” and inserting “objectives”;
¶
(3)
by striking paragraph (3);
¶
(4)
by redesignating paragraphs (4) and (5) as paragraphs (3) and (4), respectively; and
¶
(5)
in paragraph (3), as redesignated by paragraph (4) of this subsection, by striking “for the programs of that agency” and inserting “for programs demonstrating military systems to one or more of the armed forces”.
¶
(b)
Responsibility for Submission of Plan.—.
Coordination. Subsection (c) of such section is amended by striking “Secretary of Defense shall” and inserting “Director shall, in coordination with the Under Secretary of Defense for Acquisition, Technology, and Logistics,”.
¶
(c)
Effective Date.—.
Applicability.10 USC 2352 note. The amendments made by this section shall apply with respect to biennial strategic plans submitted under section 2352 of title 10, United States Code, as amended by this section, after the date of the enactment of this Act.
¶
SEC. 212.
LIMITATION ON AVAILABILITY OF FUNDS FOR GROUND COMBAT VEHICLE ENGINEERING AND MANUFACTURING PHASE..
NoneTime period.Reports. of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Army may be obligated or expended for post-Milestone B engineering and manufacturing phase development activities for the ground combat vehicle program until a period of 30 days has elapsed following the date on which the Secretary of the Army submits to the congressional defense committees a report that includes the following:
¶
(1)
An independent assessment of the draft milestone B documentation for the ground combat vehicle that—127 STAT. 704
¶
(A)
is performed by the Director of Cost Assessment and Program Evaluation, the Assistant Secretary of Defense for Research and Engineering, or other similar official; and
¶
(B)
analyzes whether there is a sufficient business case to proceed with the engineering and manufacturing development phase for the ground combat vehicle using only one contractor.
¶
(2)
Certification. A certification by the Secretary that the ground combat vehicle program has—
¶
(A)
feasible, fully defined, and stable requirements;
¶
(B)
been demonstrated in a relevant environment in accordance with section 2366b(a)(3)(D) of title 10, United States Code, and achieved technology readiness or maturity;
¶
(C)
independent and high-confidence cost estimates;
¶
(D)
sufficient funding available during fiscal year 2014 and sufficient funding planned for the period covered by the current future-years defense plan; and
¶
(E)
a realistic and achievable schedule.
¶
SEC. 213.
LIMITATION AND REPORTING REQUIREMENTS FOR UNMANNED CARRIER-LAUNCHED SURVEILLANCE AND STRIKE SYSTEM PROGRAM..
¶
(a)
Limitation on Number of Air Vehicles.—.
The Secretary of Defense may not acquire more than six air vehicles of the unmanned carrier-launched surveillance and strike system prior to receiving milestone B approval (as defined in section 2366(e)(7) of title 10, United States Code) for engineering and manufacturing development and low-rate initial production.
¶
(b)
Quarterly Cost Reports.—.
Effective dates.Time periods. Beginning 90 days after the date on which the unmanned carrier-launched surveillance and strike system receives milestone A approval, and each 90-day period thereafter until such system receives milestone B approval, the Secretary of the Navy shall submit to the congressional defense committees a report that includes, at a minimum—
¶
(1)
the current cost estimate and schedule, as of the date of the report, for all segments of the unmanned carrier-launched surveillance and strike system program;
¶
(2)
any changes to such cost estimate or schedule from the previous report; and
¶
(3)
an explanation for any changes to the cost estimate or schedule or to the key performance parameters or key system attributes used for such program.
¶
(c)
Budget Documentation Requirement.—.
10 USC 22 note. In the budget materials submitted to the President by the Secretary of Defense in connection with the submission to Congress, pursuant to section 1105 of title 31, United States Code, of the budget for fiscal year 2015, and each subsequent fiscal year, the Secretary shall include individual project lines for each program segment of the unmanned carrier-launched surveillance and strike system, within program element 0604404N, that articulate all costs, contractual actions, and other information associated with technology development for each such program segment.
¶
(1)
Review.—.
The Comptroller General of the United States shall annually conduct a review of the acquisition program 127 STAT. 705 for the unmanned carrier-launched surveillance and strike system.
¶
(2)
Report.—.
Not later than March 1 of each year, the Comptroller General shall submit to the congressional defense committees a report on the review under paragraph (1).
¶
(3)
Elements.—.
Each report under paragraph (2) shall include such matters as the Comptroller General considers appropriate to fully inform the congressional defense committees of the status of the unmanned carrier-launched surveillance and strike system program. Such matters should include, at a minimum, the following:
¶
(A)
The extent to which the unmanned carrier-launched surveillance and strike system program is meeting cost, schedule, and performance goals.
¶
(B)
The progress and results of developmental testing.
¶
(C)
An assessment of the acquisition strategy for the program, including whether the strategy is consistent with acquisition management best practices identified by the Comptroller General for the purposes of the program.
¶
(A)
the date on which the Secretary of the Navy awards a contract for the full-rate production of the unmanned carrier-launched surveillance and strike system; or
¶
(B)
the date on which the unmanned carrier-launched surveillance and strike system program is terminated.
¶
SEC. 214.
LIMITATION ON AVAILABILITY OF FUNDS FOR AIR FORCE LOGISTICS TRANSFORMATION..
Of Time period.Reports.the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for procurement, Air Force, or research, development, test, and evaluation, Air Force, for logistics information technology, including for the expeditionary combat support system, not more than 85 percent may be obligated or expended until the date that is 30 days after the date on which the Secretary of the Air Force submits to the congressional defense committees a report on how the Secretary will modernize and update the logistics information technology systems of the Air Force following the cancellation of the expeditionary combat support system. Such report shall include—
¶
(1)
a detailed strategy and timeline for implementing the recommendations from the Expeditionary Combat Support System Acquisition Investigation Review Team Final Report; and
¶
(2)
a description of the near-term options for maintaining or incrementally modernizing the logistics information technology systems of the Air Force until a replacement for the expeditionary combat support system can be determined.
¶
SEC. 215.
LIMITATION ON AVAILABILITY OF FUNDS FOR DEFENSIVE CYBERSPACE OPERATIONS OF THE AIR FORCE..
¶
(a)
Limitation.—.
Time period.Reports. Of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for procurement, Air Force, or research, development, test, and evaluation, Air Force, for Defensive Cyberspace Operations (Program Element 0202088F), not more than 90 percent may be obligated or expended until a period of 30 days has elapsed following the date on which the Secretary of the Air Force submits to the congressional 127 STAT. 706 defense committees a report on the Application Software Assurance Center of Excellence.
¶
(1)
A description of how the Application Software Assurance Center of Excellence is used to support the software assurance activities of the Air Force and other elements of the Department of Defense, including pursuant to section 933 of the National Defense Authorization Act for Fiscal Year 2013 (Public Law 112–239; 10 U.S.C. 2224 note).
¶
(2)
A description of the resources used to support the Center of Excellence from the beginning of the Center through fiscal year 2014.
¶
(3)
The plan of the Secretary for sustaining the Center of Excellence during the period covered by the future-years defense program submitted in 2013 under section 221 of title 10, United States Code.
¶
SEC. 216.
LIMITATION ON AVAILABILITY OF FUNDS FOR PRECISION EXTENDED RANGE MUNITION PROGRAM..
Of theAvailability date.Reports. funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Department of Defense, not more than 50 percent may be obligated or expended for the precision extended range munition program until the date on which the Chairman of the Joint Chiefs of Staff submits to the congressional defense committees written certification that—
¶
(1)
such program is necessary to meet a valid operational need that cannot be met by the existing precision guided mortar munition of the Army, other indirect fire weapons, or aerial-delivered joint fires; and
¶
(2)
a sufficient business case exists to proceed with the development and production of such program.
¶
SEC. 217.
LONG-RANGE STANDOFF WEAPON REQUIREMENT; PROHIBITION ON AVAILABILITY OF FUNDS FOR NONCOMPETITIVE PROCEDURES FOR OFFENSIVE ANTI-SURFACE WARFARE WEAPON CONTRACTS OF THE NAVY..
¶
(1)
In general.—.
The Secretary of the Air Force shall develop a follow-on air-launched cruise missile to the AGM–86 that—
¶
(A)
achieves initial operating capability for conventional missions prior to the retirement of the conventionally armed AGM–86;
¶
(B)
achieves initial operating capability for nuclear missions prior to the retirement of the nuclear-armed AGM–86; and
¶
(C)
is capable of internal carriage and employment for both conventional and nuclear missions on the next-generation long-range strike bomber.
¶
(2)
Consecutive development.—.
Determination. In developing a follow-on air-launched cruise missile to the AGM–86 in accordance with paragraph (1), the Secretary may carry out development and production activities with respect to nuclear missions prior to carrying out such activities with respect to conventional missions if the Secretary determines such consecutive order of development and production activities to be cost effective.127 STAT. 707
¶
(1)
Prohibition.—.
Except as provided by paragraph (2), none of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the offensive anti-surface warfare weapon may be used to enter into or modify a contract using procedures other than competitive procedures (as defined in section 2302(2) of title 10, United States Code).
¶
(A)
Exempted activities.—.
The prohibition in paragraph (1) shall not apply to funds specified in such paragraph that are made available for the development, testing, and fielding of aircraft-launched offensive anti-surface warfare weapons capabilities.
¶
(B)
National security waiver authority.—.
Determination. The Secretary of Defense may waive the prohibition in paragraph (1) if the Secretary determines that such a waiver is in the national security interests of the United States.
¶
(1)
Review.—.
Establishment. The Under Secretary of Defense for Acquisition, Technology, and Logistics shall establish an independent team consisting of subject matter experts to review the development of software for the F–35 aircraft program (in this subsection referred to as the “software development program”), including by reviewing the progress made with respect to—
¶
(A)
managing the software development program; and
¶
(B)
delivering critical software capability in accordance with current program milestones.
¶
(2)
Report.—.
Not later than March 3, 2014, the Under Secretary shall submit to the congressional defense committees a report on the review under paragraph (1). Such report shall include the following:
¶
(A)
An assessment by the independent team with respect to whether the software development program—
¶
(i)
has been successful in meeting the key milestone dates occurring before the date of the report; and
¶
(ii)
will be successful in meeting the established program schedule.
¶
(B)
Any recommendations of the independent team with respect to improving the software development program to ensure that, in support of the start of initial operational testing, the established program schedule is met on time.
¶
(C)
Determination. If the independent team determines that the software development program will be unable to deliver the full complement of software within the established program schedule, any potential alternatives that the independent team considers appropriate to deliver such software within such schedule.
¶
(b)
Autonomic Logistics Information System Sustainment Report.—.
Consultation. Not later than 180 days after the date of the enactment of this Act, the Under Secretary, in consultation with the Joint 127 STAT. 708 Strike Fighter Joint Program Office, shall submit to the congressional defense committees a report on current plans, as of the date of the report, for long-term sustainment of the autonomic logistics information system of F–35 aircraft. Such report shall include the following:
¶
(1)
Current plans for acquisition of technical data rights to autonomic logistics information system software and the potential competitive sustainment of elements of the autonomic logistics information system.
¶
(2)
How sustainment of the autonomic logistics information system may take advantage of public-private partnerships authorized by section 2474 of title 10, United States Code, including schedules for actions necessary for such sustainment.
¶
(3)
Any current plan to select, designate, and activate any Government-owned and Government-operated site to serve as the autonomic logistics operating unit.
¶
(4)
Current plans to ensure that the autonomic logistics information system provides total asset visibility and accountability, including asset valuation and tracking, and for potential integration with other automated logistics systems.
¶
(a)
Project Codes for Budget Submissions.—.
In the budget submitted by the President to Congress under section 1105 of title 31, United States Code, for fiscal year 2015 and each subsequent fiscal year, each capability component within the distributed common ground system program shall be set forth as a separate project code within the program element line, and each covered official shall submit supporting justification for the project code within the program element descriptive summary.
¶
(1)
Requirement.—.
The Under Secretary of Defense for Acquisition, Technology, and Logistics shall conduct an analysis of capability components that are compliant with the intelligence community data standards and could be used to meet the requirements of the distributed common ground system program.
¶
(A)
Revalidation of the distributed common ground system program requirements based on current program needs, recent operational experience, and the requirement for nonproprietary solutions that adhere to open-architecture principles.
¶
(B)
Market research of current commercially available tools to determine whether any such tools could potentially satisfy the requirements described in subparagraph (A).
¶
(C)
Analysis of the competitive acquisition options for any tools identified in subparagraph (B).
¶
(3)
Submission.—.
Deadline. Not later than 180 days after the date of the enactment of this Act, the Under Secretary shall submit to the congressional defense committees the results of the analysis conducted under paragraph (1).
¶
(c)
Covered Official Defined.—.
In this section, the term “covered official” means the following:127 STAT. 709
¶
(1)
The Secretary of the Army, with respect to matters concerning the Army.
¶
(2)
The Secretary of the Navy, with respect to matters concerning the Navy.
¶
(3)
The Secretary of the Air Force, with respect to matters concerning the Air Force.
¶
(4)
The Commandant of the Marine Corps, with respect to matters concerning the Marine Corps.
¶
(5)
The Commander of the United States Special Operations Command, with respect to matters concerning the United States Special Operations Command.
¶
(1)
it remains the policy of the United States, as expressed in section 913(a) of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109–364; 120 Stat. 2355), to demonstrate, acquire, and deploy an effective capability for operationally responsive space to support military users and operations from space, which shall consist of—
¶
(A)
responsive satellite payloads and busses built to common technical standards;
¶
(B)
low-cost space launch vehicles and supporting range operations that facilitate the timely launch and on-orbit operations of satellites;
¶
(C)
responsive command and control capabilities; and
¶
(D)
concepts of operations, tactics, techniques, and procedures that permit the use of responsive space assets for combat and military operations other than war; and
¶
(2)
the Operationally Responsive Space Program Office has demonstrated through multiple launches since 2009 an ability to accomplish many of the policy objectives of the Operationally Responsive Space Program through specific missions, but has not executed a mission that leverages all policy objectives of such Program in a single mission.
¶
(b)
Limitation.—.
Certification. Of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Department of Defense for the space-based infrared systems space modernization initiative wide-field-of-view testbed, not more than 50 percent may be obligated or expended until the Executive Agent for Space of the Department of Defense certifies to the congressional defense committees that the Secretary of Defense is carrying out the Operationally Responsive Space Program Office in accordance with section 2273a of title 10, United States Code.
¶
(c)
Report.—.
Not later than 60 days after the date of the enactment of this Act, the Executive Agent for Space of the Department of Defense shall submit to the congressional defense committees a report regarding a potential mission that would seek to leverage all policy objectives of the Operationally Responsive Space Program in a single mission.
¶
SEC. 221.
SUSTAINMENT OR REPLACEMENT OF BLUE DEVIL INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE CAPABILITIES..
¶
(a)
Plan to Retain Capability.—.
The Secretary of the Air Force shall develop a plan to sustain the operational capabilities of the Blue Devil 1 Intelligence, Surveillance, and Reconnaissance 127 STAT. 710 Systems (in this section referred to as “Blue Devil 1 system”), including precision signal geolocation, by—
¶
(1)
procuring the existing Blue Devil 1 system;
¶
(2)
developing a new system; or
¶
(3)
basing a new system on capabilities that are adapted and integrated from existing programs and programs being developed.
¶
(b)
Report Required.—.
Not later than 90 days after the date of the enactment of this Act, the Secretary shall submit to the appropriate congressional committees a report on—
¶
(1)
the potential cost of procuring, operating, and sustaining current Blue Devil 1 systems for fiscal years 2014 through 2019, including costs relating to procurement, research and development, personnel, operation and maintenance, and military construction;
¶
(2)
the ability of other current platforms and subsystems as of the date of the report to provide intelligence, surveillance, and reconnaissance support similar to the support provided by the current Blue Devil 1 system; and
¶
(3)
a listing of programs of the Air Force and other programs of the Department of Defense in development as of the date of the report that could provide such similar support in the future.
¶
(c)
Requirement to Coordinate.—.
In preparing the report under subsection (b), the Secretary shall—
¶
(1)
coordinate with the Commander of the United States Special Operations Command regarding the operational needs of the United States Special Operations Command; and
¶
(2)
coordinate with the Director of the Defense Advanced Research Projects Agency with respect to information regarding the transfer to the Air Force of the technology developed under the wide-area network detection program for operational integration of wide-area motion imagery and near-vertical direction-finding data for effective target detection, identification, and tracking for potential incorporation, as practical and appropriate, into other platforms.
¶
(d)
Appropriate Congressional Committees Defined.—.
In this section, the term “appropriate congressional committees” means—
¶
(1)
the Committee on Armed Services, the Committee on Appropriations, and the Select Committee on Intelligence of the Senate; and
¶
(2)
the Committee on Armed Services, the Committee on Appropriations, and the Permanent Select Committee on Intelligence of the House of Representatives.
¶
Subtitle C — Missile Defense Programs
SEC. 231.
IMPROVEMENTS TO ACQUISITION ACCOUNTABILITY REPORTS ON BALLISTIC MISSILE DEFENSE SYSTEM..
¶
(a)
Improvement to Operations and Sustainment Cost Estimates.—.
10 USC 225 note. In preparing the acquisition accountability reports on the ballistic missile defense system required by section 225 of title 10, United States Code, the Director of the Missile Defense Agency shall improve the quality of cost estimates relating to operations and sustainment that are included in such reports under subsection 127 STAT. 711 (b)(3)(A) of such section, including with respect to the confidence levels of such cost estimates.
¶
(b)
Operations and Sustainment Responsibility.—.
Section 225 of title 10, United States Code, is amended by adding at the end the following new subsection:
¶
“(e)
Operations and Sustainment Cost Estimates.—.
The Director shall ensure that each life-cycle cost estimate included in an acquisition baseline pursuant to subsection (b)(3)(A) includes—
¶
“(1)
all of the operations and sustainment costs for which the Director is responsible; and
¶
“(2)
a description of the operations and sustainment functions and costs for which a military department is responsible.”
¶
(1)
In general.—.
Not later than one year after the date of the enactment of this Act, the Director of the Missile Defense Agency shall submit to the congressional defense committees a report outlining the plans of the Director to improve the quality of cost estimates pursuant to subsection (a).
¶
(A)
a description of the actions planned to improve the quality of cost estimates included in the acquisition accountability reports on the ballistic missile defense system required by section 225 of title 10, United States Code;
¶
(B)
the schedule for such planned actions, including the planned schedule for meeting the requirements of subsection (e) of such section 225, as added by subsection (b);
¶
(C)
a description of any steps taken during the previous year to improve the quality of such cost estimates;
¶
(D)
an assessment of how the planned improvements compare to the best practices and cost-estimation guidelines recommended by the Comptroller General of the United States for cost estimates of the ballistic missile defense system;
¶
(E)
any other matters the Director considers appropriate; and
¶
(F)
the views of the Comptroller General of the United States with respect to the contents of the report.
¶
SEC. 232.
PROHIBITION ON USE OF FUNDS FOR MEADS PROGRAM..
None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Department of Defense may be obligated or expended for the medium extended air defense system.
¶
SEC. 233.
PROHIBITION ON AVAILABILITY OF FUNDS FOR INTEGRATION OF CERTAIN MISSILE DEFENSE SYSTEMS; REPORT ON REGIONAL BALLISTIC MISSILE DEFENSE..
¶
(1)
Sense of congress.—.
It is the sense of Congress that missile defense systems of the People’s Republic of China should not be integrated into the missile defense systems of the United States or the North Atlantic Treaty Organization.127 STAT. 712
¶
(2)
Prohibition.—.
None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for the Department of Defense may be obligated or expended to integrate missile defense systems of the People’s Republic of China into missile defense systems of the United States.
¶
(1)
In general.—.
Not later than 180 days after the date of the enactment of this Act, the Secretary of Defense shall submit to the congressional defense committees a report on the status and progress of regional missile defense programs and efforts.
¶
(A)
A description of the overall risk assessment from the most recent Global Ballistic Missile Defense Assessment of regional missile defense capabilities relative to meeting the operational needs of the commanders of the geographic combatant commands, including the need for force protection of forward-deployed forces and capabilities of the United States and for the defense of allies and partners of the United States.
¶
(B)
An assessment of whether and how the currently planned phased, adaptive approach to missile defense in Europe and other planned regional missile defense approaches and capabilities of the United States meet the integrated priorities of the commanders of the geographic combatant commands to achieve the operational requirements of the commanders to defend against the ballistic missile threat to deployed forces of the United States and allies of the United States, including a description of planned force structure deployment options to increase missile defense capabilities in the area of responsibility of a commander, if needed, in the event of warning of an imminent ballistic missile attack.
¶
(C)
A detailed explanation of the current and planned concept of operations for the phased, adaptive approach to missile defense in Europe, including—
¶
(i)
arrangements for allocating the command of assets of such approach between the Commander of the United States European Command and the Supreme Allied Commander, Europe;
¶
(ii)
an explanation of the circumstances under which such command would be allocated to each commander; and
¶
(iii)
a description of the prioritization of defense of both the deployed forces of the United States and the territory of the member states of the North Atlantic Treaty Organization using available missile defense interceptor inventory.
¶
(D)
A description of the progress made in the development and testing of elements of systems intended for deployment in phases 2 and 3 of the phased, adaptive approach to missile defense in Europe, including the standard missile–3 block IB, the standard missile–3 block IIA interceptors, and the Aegis Ashore system, and any areas where work remains to ensure such phases are ready 127 STAT. 713 for deployment as specified in the 2010 Ballistic Missile Defense Review.
¶
(E)
A description of the manner in which elements of regional missile defense architectures, such as forward-based X-band radars in Japan, Israel, Turkey, and the area of responsibility of the Commander of the United States Central Command, contribute to the enhancement of the homeland defense of the United States.
¶
(F)
A description of the manner in which enhanced integration of offensive military capabilities and defensive missile defense capabilities, including the potential for improved intelligence, surveillance, and reconnaissance, will fit into regional missile defense planning and force structure assessments.
¶
(G)
A description of how the contributions of allies and partners of the United States that have purchased missile defense technology of the United States could aid in reducing the costs of deployment of regional missile defense capabilities of the United States, and how the systems of such allies and partners could be better networked and integrated to provide mutual force multiplication benefits.
¶
(H)
A description of how the Secretary of Defense is working with allies and partners of the United States that have purchased air and missile defense technology of the United States to integrate the capabilities of such allies and partners provided by such technology with the air and missile defense systems and networks of the United States to provide mutual benefit.
¶
(I)
Any other matters the Secretary determines appropriate.
¶
(3)
Form.—.
The report required by paragraph (1) shall be submitted in unclassified form, but may include a classified annex.
¶
SEC. 234.
AVAILABILITY OF FUNDS FOR CO-PRODUCTION OF IRON DOME SHORT-RANGE ROCKET DEFENSE SYSTEM IN THE UNITED STATES..
¶
(1)
In general.—.
Of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2014 for research, development, test, and evaluation, Defense-wide, for the Missile Defense Agency, not more than $15,000,000 may be obligated or expended for nonrecurring engineering costs in connection with the establishment of a capacity for co-production in the United States by industry of the United States of parts and components for the Iron Dome short-range rocket defense program. Such obligation or expenditure shall be made pursuant to an agreement described in paragraph (2).
¶
(2)
Agreement described.—.
Israel. An agreement described in this paragraph is an agreement entered into by the Government of the United States and the Government of Israel with respect to the co-production in the United States of parts and components for the Iron Dome short-range rocket defense program.
¶
(b)
Report on Co-production.—.
Not later than 30 days after obligating or expending funds specified in subsection (a), the 127 STAT. 714 Director of the Missile Defense Agency shall submit to the congressional defense committees a report on the plan to implement an agreement described in paragraph (2) of such subsection, including the following:
¶
(1)
A description of the estimated cost of implementing the agreement, including the costs to be paid by industry.
¶
(2)
The expected schedule to implement the agreement.
¶
(3)
A description of any efforts to minimize the costs of the agreement to the Government of the United States.
¶
(1)
In general.—.
Not later than one year after the date of the enactment of this Act, the Secretary of Defense shall submit to the congressional defense committees a report on the status of missile defense cooperation between the United States and Israel.
¶
(A)
A description of the current program of ballistic missile defense cooperation between the United States and Israel, including the objectives and results of such cooperation as of the date of the report.
¶
(B)
A description of steps taken during the year prior to the report, and steps planned to be taken during the year following the report, by the governments of the United States and Israel to improve the coordination, interoperability, and integration of the missile defense capabilities of the United States and Israel.
¶
(C)
A description of joint missile defense exercises and training that have been conducted by the United States and Israel, and the lessons learned from such exercises.
¶
(D)
A description of joint efforts of the United States and Israel to develop ballistic missile defense technologies and capabilities.
¶
(E)
Any other matters that the Secretary considers appropriate.
¶
(d)
Construction.—.
Nothing in this section shall be construed to alter or affect the procurement schedule, or anticipated procurement numbers, under the Iron Dome short-range rocket defense program.
¶
(1)
second-source production of parts and components of the Iron Dome short-range rocket defense program that is based in the United States is in the national security interest of both Israel and the United States; and
¶
(2)
the move towards such a second-source capacity in the United States for integration and assembly of all-up rounds of the Iron Dome short-range rocket defense program will further enhance the security of Israel by ensuring added production capability of such vital program.
¶
SEC. 235.
ADDITIONAL MISSILE DEFENSE RADAR FOR THE PROTECTION OF THE UNITED STATES HOMELAND..
10 USC 2431 note.
¶
(1)
InKorea. general.—.
The Director of the Missile Defense Agency shall deploy a long-range discriminating radar against long-range ballistic missile threats from the Democratic People’s Republic of Korea. Such radar shall be located at a location 127 STAT. 715 optimized to support the defense of the homeland of the United States.
¶
(2)
Funding.—.
Of the funds authorized to be appropriated by this Act for research, development, test, and evaluation, Defense-wide, for the Missile Defense Agency for BMD Sensors (PE 63884C), as specified in the funding table in section 4201, $30,000,000 shall be available for initial costs toward the deployment of the radar required by paragraph (1).
¶
(1)
In general.—.
The Secretary of Defense shall ensure that the Secretary is able to deploy additional tracking and discrimination sensor capabilities to support the defense of the homeland of the United States from future long-range ballistic missile threats that emerge from Iran.
¶
(2)
Report.—.
Not later than 180 days after the date of the enactment of this Act, the Secretary shall submit to the congressional defense committees a report that details what sensor capabilities of the United States, including re-locatable land- and sea-based capabilities, are or will become available to support the defense of the homeland of the United States from future long-range ballistic missile threats that emerge from Iran. Such report shall include the following:
¶
(A)
With respect to the capabilities included in the report, an identification of such capabilities that can be located on the Atlantic-side of the United States by not later than 2019, or sooner if long-range ballistic missile threats from Iran are successfully flight-tested prior to 2019.
¶
(B)
A description of the manner in which the United States will maintain such capabilities so as to ensure the deployment of the capabilities in time to support the missile defense of the United States from long-range ballistic missile threats from Iran.
¶
(1)
In general.—.
The Secretary of Defense, acting through the Commander of the United States Strategic Command, shall conduct an evaluation of options and alternatives for future sensor architectures for ballistic missile defense in order to enhance the ballistic missile defense capabilities of the United States.
¶
(2)
Consultation.—.
In carrying out paragraph (1), the Secretary shall consult with the heads of departments and agencies of the Federal Government that the Secretary determines appropriate.
¶
(3)
Scope of evaluation.—.
In conducting the evaluation under paragraph (1), the Secretary shall consider the following:
¶
(A)
A wide range of options for a future sensor architecture for ballistic missile defense, including—
¶
(i)
options regarding the future development, integration, exploitation, and deployment of existing or new missile defense sensor systems and assets; and
¶
(ii)
options regarding using capabilities of the Federal Government that exist or are planned as of the date of the evaluation that are not primarily focused 127 STAT. 716 on missile defense, including such capabilities that may require modification to be used for missile defense.
¶
(B)
The potential costs, advantages, and feasibility of using such future sensor architecture for purposes other than missile defense, including for technical intelligence collection or space situational awareness.
¶
(C)
Whether and how such future sensor architectures could be designed and employed to fulfill missions other than missile defense when not required for such missile defense missions.
¶
(4)
Objective.—.
The objective of the evaluation shall be to identify one or more future sensor architectures for ballistic missile defense that will result in an improvement of the performance of the ballistic missile defense system in a cost-effective, operationally effective, timely, and affordable manner.
¶
(b)
Elements to Be Evaluated.—.
The evaluation required by subsection (a) shall include a consideration of the following:
¶
(A)
Radar.
¶
(B)
Infrared.
¶
(C)
Optical and electro-optical.
¶
(D)
Directed energy.
¶
(A)
Ground-based sensors.
¶
(B)
Sea-based sensors.
¶
(C)
Airborne sensors.
¶
(D)
Space-based sensors.
¶
(A)
Detection.
¶
(B)
Tracking.
¶
(C)
Characterization.
¶
(D)
Classification.
¶
(E)
Discrimination.
¶
(F)
Debris mitigation.
¶
(G)
Kill assessment.
¶
(4)
Sensor architecture capabilities.—.
At a minimum, maximization or improvement of sensor-related capabilities as follows:
¶
(A)
Handling of increasing raid sizes.
¶
(B)
Precision tracking of threat missiles.
¶
(C)
Providing fire-control quality tracks of evolving threat missiles.
¶
(D)
Enabling launch-on-remote and engage-on-remote capabilities.
¶
(E)
Discriminating lethal objects (warheads) from other objects.
¶
(F)
Effectively assessing the results of engagements.
¶
(G)
Enabling enhanced shot doctrine.
¶
(H)
Other capabilities that the Secretary of Defense determines appropriate.
¶
(1)
In general.—.
Not later than one year after the date of the enactment of this Act, the Secretary shall submit to 127 STAT. 717 the congressional defense committees a report setting forth the results of the evaluation required by subsection (a).
¶
(2)
Elements.—.
The report under paragraph (1) shall include the findings, conclusions, and recommendations of the Secretary with respect to—
¶
(A)
future sensor architectures evaluated under subsection (a)(3)(A)(i).
¶
(B)
existing or planned capabilities of the Federal Government evaluated under subsection (a)(3)(A)(ii);
¶
(C)
using future sensor architecture for additional purposes as described in subsection (a)(3)(B); and
¶
(D)
the design and employment of future sensor architectures to fulfill missions other than missile defense as described in subsection (a)(3)(C).
¶
(3)
Form.—.
The report shall be submitted in unclassified form, but may include a classified annex.
¶
(d)
Conforming Repeal.—.
Section 224 of the National Defense Authorization Act for Fiscal Year 2013 (Public Law 112–239; 126 Stat. 1675) is repealed.
¶