S. 601 113th Congress Passed Senate
Congress.gov ↗

Water Resources Development Act of 2013

A bill to provide for the conservation and development of water and related resources, to authorize the Secretary of the Army to construct various projects for improvements to rivers and harbors of the United States, and for other purposes.

Introduced Mar 18, 2013
Committee Apr 22, 2013
Passed Senate May 15, 2013
To President  
Became law  
This is a large bill (178 sections). Showing the first 40 sections for fast reading — click any section in the table of contents to open it, or load the full bill. Load all 178 sections
SEC. 1. Short title; table of contents.
(a) Short title. This Act may be cited as the “Water Resources Development Act of 2013”.
(b) Table of contents. The table of contents of this Act is as follows:
SEC. 2. Definition of Secretary. In this Act, the term Secretary means the Secretary of the Army.
TITLE I — Water resource projects
SEC. 1001. Purposes. The purposes of this title are—
(1) to authorize projects that—
(A) are the subject of a completed report of the Chief of Engineers containing a determination that the relevant project—
(i) is in the Federal interest;
(ii) results in benefits that exceed the costs of the project;
(iii) is environmentally acceptable; and
(iv) is technically feasible; and
(B) have been recommended to Congress for authorization by the Assistant Secretary of the Army for Civil Works; and
(2) to authorize the Secretary—
(A) to review projects that require increased authorization; and
(B) to request an increase of those authorizations after—
(i) certifying that the increases are necessary; and
(ii) submitting to Congress reports on the proposed increases.
SEC. 1002. Project authorizations. The Secretary is authorized to carry out projects for water resources development, conservation, and other purposes, subject to the conditions that—
(1) each project is carried out—
(A) substantially in accordance with the plan for the project; and
(B) subject to any conditions described in the report for the project; and
(2)
(A) a Report of the Chief of Engineers has been completed; and
(B) after November 8, 2007, but prior to the date of enactment of this Act, the Assistant Secretary of the Army for Civil Works has submitted to Congress a recommendation to authorize construction of the project.
SEC. 1003. Project review.
(a) In general. For a project that is authorized by Federal law as of the date of enactment of this Act, the Secretary may modify the authorized project cost set under section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280)—
(1) by submitting the required certification and additional information to Congress in accordance with subsection (b); and
(2) after receiving an appropriation of funds in accordance with subsection (b)(3)(B).
(b) Requirements for submission.
(1) Certification. The certification to Congress under subsection (a) shall include a certification by the Secretary that—
(A) expenditures above the authorized cost of the project are necessary to protect life and safety or property, maintain critical navigation routes, or restore ecosystems;
(B) the project continues to provide benefits identified in the report of the Chief of Engineers for the project; and
(C) for projects under construction—
(i) a temporary stop or delay resulting from a failure to increase the authorized cost of the project will increase costs to the Federal Government; and
(ii) the amount requested for the project in the budget of the President or included in a work plan for the expenditure of funds for the fiscal year during which the certification is submitted will exceed the authorized cost of the project.
(2) Additional information. The information provided to Congress about the project under subsection (a) shall include, at a minimum—
(A) a comprehensive review of the project costs and reasons for exceeding the authorized limits set under section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280);
(B) an expedited analysis of the updated benefits and costs of the project; and
(C) the revised cost estimate level for completing the project.
(3) Approval of Congress. The Secretary may not change the authorized project costs under subsection (a) unless—
(A) a certification and required information is submitted to Congress under subsection (b); and
(B) after such submission, amounts are appropriated to initiate or continue construction of the project in an appropriations or other Act.
(c) De minimis amounts. If the cost to complete construction of an authorized water resources project would exceed the limitations on the maximum cost of the project under section 902 of the Water Resources Development Act of 1986 (33 U.S.C. 2280), the Secretary may complete construction of the project, notwithstanding the limitations imposed by that section if—
(1) construction of the project is at least 70 percent complete at the time the cost of the project is projected to exceed the limitations; and
(2) the Federal cost to complete construction is less than $5,000,000.
(d) Termination of effectiveness. The authority of the Secretary under this section terminates on the date that is 3 years after the date of enactment of this Act.
SEC. 1004. Future project authorizations.
(a) Policy. The benefits of water resource projects designed and carried out in an economically justifiable, environmentally acceptable, and technically sound manner are important to the economy and environment of the United States and recommendations to Congress regarding those projects should be expedited for approval in a timely manner.
(b) Applicability. The procedures under this section apply to projects for water resources development, conservation, and other purposes, subject to the conditions that—
(1) each project is carried out—
(A) substantially in accordance with the plan identified in the report of the Chief of Engineers for the project; and
(B) subject to any conditions described in the report for the project; and
(2)
(A) a report of the Chief of Engineers has been completed; and
(B) after the date of enactment of this Act, the Assistant Secretary of the Army for Civil Works has submitted to Congress a recommendation to authorize construction of the project.
(c) Expedited consideration.
(1) In general. A bill shall be eligible for expedited consideration in accordance with this subsection if the bill—
(A) authorizes a project that meets the requirements described in subsection (b); and
(B) is referred to the Committee on Environment and Public Works of the Senate.
(2) Committee consideration.
(A) In general. Not later than January 31st of the second session of each Congress, the Committee on Environment and Public Works of the Senate shall—
(i) report all bills that meet the requirements of paragraph (1); or
(ii) introduce and report a measure to authorize any project that meets the requirements described in subsection (b).
(B) Failure to act. Subject to subparagraph (C), if the Committee fails to act on a bill that meets the requirements of paragraph (1) by the date specified in subparagraph (A), the bill shall be discharged from the Committee and placed on the calendar of the Senate.
(C) Exceptions. Subparagraph (B) shall not apply if—
(i) in the 180-day period immediately preceding the date specified in subparagraph (A), the full Committee holds a legislative hearing on a bill to authorize all projects that meet the requirements described in subsection (b);
(ii)
(I) the Committee favorably reports a bill to authorize all projects that meet the requirements described in subsection (b); and
(II) the bill described in subclause (I) is placed on the calendar of the Senate; or
(iii) a bill that meets the requirements of paragraph (1) is referred to the Committee not earlier than 30 days before the date specified in subparagraph (A).
(d) Termination. The procedures for expedited consideration under this section terminate on December 31, 2018.
TITLE II — Water resources policy reforms
SEC. 2001. Purposes. The purposes of this title are—
(1) to reform the implementation of water resources projects by the Corps of Engineers;
(2) to make other technical changes to the water resources policy of the Corps of Engineers; and
(3) to implement reforms, including—
(A) enhancing the ability of local sponsors to partner with the Corps of Engineers by ensuring the eligibility of the local sponsors to receive and apply credit for work carried out by the sponsors and increasing the role of sponsors in carrying out Corps of Engineers projects;
(B) ensuring continuing authority programs can continue to meet important needs;
(C) encouraging the continuation of efforts to modernize feasibility studies and establish targets for expedited completion of feasibility studies;
(D) seeking efficiencies in the management of dams and related infrastructure to reduce environmental impacts while maximizing other benefits and project purposes, such as flood control, navigation, water supply, and hydropower;
(E) clarifying mitigation requirements for Corps of Engineers projects and ensuring transparency in the independent external review of those projects; and
(F) establishing an efficient and transparent process for deauthorizing projects that have failed to receive a minimum level of investment to ensure active projects can move forward while reducing the backlog of authorized projects.
SEC. 2002. Safety assurance review. Section 2035 of the Water Resources Development Act of 2007 (33 U.S.C. 2344) is amended by adding at the end the following:
(g) Nonapplicability of FACA. The Federal Advisory Committee Act (5 U.S.C. App.) shall not apply to a safety assurance review conducted under this section.
SEC. 2003. Continuing authority programs.
(a) Small river and harbor improvement projects. Section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577) is amended—
(1) in subsection (a), by striking “$35,000,000” and inserting “$50,000,000”; and
(2) in subsection (b), by striking “$7,000,000” and inserting “$10,000,000”.
(b) Shore damage prevention or mitigation. Section 111(c) of the River and Harbor Act of 1968 (33 U.S.C. 426i(c)) is amended by striking “$5,000,000” and inserting “$10,000,000”.
(c) Regional sediment management.
(1) In general. Section 204 of the Water Resources Development Act of 1992 (33 U.S.C. 2326) is amended—
(A) in subsection (c)(1)(C), by striking “$5,000,000” and inserting “$10,000,000”; and
(B) in subsection (g), by striking “$30,000,000” and inserting “$50,000,000”.
(2) Applicability. Section 2037 of the Water Resources Development Act of 2007 (121 Stat. 1094) is amended by added at the end the following:
(c) Applicability. The amendment made by subsection (a) shall not apply to any project authorized under this Act if a report of the Chief of Engineers for the project was completed prior to the date of enactment of this Act.
(d) Small flood control projects. Section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s) is amended in the third sentence by striking “$7,000,000” and inserting “$10,000,000”.
(e) Project modifications for improvement of environment. Section 1135(d) of the Water Resources Development Act of 1986 (33 U.S.C. 2309a(d)) is amended—
(1) in the second sentence, by striking “Not more than 80 percent of the non-Federal may be” and inserting “The non-Federal share may be provided”; and
(2) in the third sentence, by striking “$5,000,000” and inserting “$10,000,000”.
(f) Aquatic ecosystem restoration. Section 206(d) of the Water Resources Development Act of 1996 (33 U.S.C. 2330(d)) is amended by striking “$5,000,000” and inserting “$10,000,000”.
(g) Floodplain management services. Section 206(d) of the Flood Control Act of 1960 (33 U.S.C. 709a) is amended by striking “$15,000,000” and inserting “$50,000,000”.
SEC. 2004. Continuing authority program prioritization.
(a) Definition of continuing authority program project. In this section, the term continuing authority program means 1 of the following authorities:
(1) Section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s).
(2) Section 111 of the River and Harbor Act of 1968 (33 U.S.C. 426i).
(3) Section 206 of the Water Resources Development Act of 1996 (33 U.S.C. 2330).
(4) Section 1135 of the Water Resources Development Act of 1986 (33 U.S.C. 2309a).
(5) Section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577).
(6) Section 3 of the Act of August 13, 1946 (33 U.S.C. 426g).
(b) Prioritization. Not later than 1 year after the date of enactment of this Act, the Secretary shall publish in the Federal Register and on a publicly available website, the criteria the Secretary uses for prioritizing annual funding for continuing authority program projects.
(c) Annual report. Not later than 1 year after the date of enactment of this Act and each year thereafter, the Secretary shall publish in the Federal Register and on a publicly available website, a report on the status of each continuing authority program, which, at a minimum, shall include—
(1) the name and a short description of each active continuing authority program project;
(2) the cost estimate to complete each active project; and
(3) the funding available in that fiscal year for each continuing authority program.
(d) Congressional notification. On publication in the Federal Register under subsections (b) and (c), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a copy of all information published under those subsections.
SEC. 2005. Fish and wildlife mitigation.
(a) In general. Section 906 of the Water Resources Development Act of 1986 (33 U.S.C. 2283) is amended—
(1) in subsection (d)—
(A) in paragraph (1)—
(i) in the first sentence—
(I) by inserting “for damages to ecological resources, including terrestrial and aquatic resources, and” after “mitigate”;
(II) by inserting “ecological resources and” after “impact on”; and
(III) by inserting “without the implementation of mitigation measures” before the period; and
(ii) by inserting before the last sentence the following: “If the Secretary determines that mitigation to in-kind conditions is not possible, the Secretary shall identify in the report the basis for that determination and the mitigation measures that will be implemented to meet the requirements of this section and the goals of section 307(a)(1) of the Water Resources Development Act of 1990 (33 U.S.C. 2317(a)(1)).”;
(B) in paragraph (2)—
(i) in the heading, by striking “Design” and inserting “Selection and design”;
(ii) by inserting “select and” after “shall”; and
(iii) by inserting “using a watershed approach” after “projects”; and
(C) in paragraph (3)—
(i) in subparagraph (A), by inserting “, at a minimum,” after “complies with”; and
(ii) in subparagraph (B)—
(I) by striking clause (iii);
(II) by redesignating clauses (iv) and (v) as clauses (v) and (vi), respectively; and
(III) by inserting after clause (ii) the following:
(iii) for projects where mitigation will be carried out by the Secretary—
(I) a description of the land and interest in land to be acquired for the mitigation plan;
(II) the basis for a determination that the land and interests are available for acquisition; and
(III) a determination that the proposed interest sought does not exceed the minimum interest in land necessary to meet the mitigation requirements for the project;
(iv) for projects where mitigation will be carried out through a third party mitigation arrangement in accordance with subsection (i)—
(I) a description of the third party mitigation instrument to be used; and
(II) the basis for a determination that the mitigation instrument can meet the mitigation requirements for the project;
; and
(2) by adding at the end the following:
(h) Programmatic mitigation plans.
(1) In general. The Secretary may develop 1 or more programmatic mitigation plans to address the potential impacts to ecological resources, fish, and wildlife associated with existing or future water resources development projects.
(2) Use of mitigation plans. The Secretary shall, to the maximum extent practicable, use programmatic mitigation plans developed in accordance with this subsection to guide the development of a mitigation plan under subsection (d).
(3) Non-Federal plans. The Secretary shall, to the maximum extent practicable and subject to all conditions of this subsection, use programmatic environmental plans developed by a State, a body politic of the State, which derives its powers from a State constitution, a government entity created by State legislation, or a local government, that meet the requirements of this subsection to address the potential environmental impacts of existing or future water resources development projects.
(4) Scope. A programmatic mitigation plan developed by the Secretary or an entity described in paragraph (3) to address potential impacts of existing or future water resources development projects shall, to the maximum extent practicable—
(A) be developed on a regional, ecosystem, watershed, or statewide scale;
(B) include specific goals for aquatic resource and fish and wildlife habitat restoration, establishment, enhancement, or preservation;
(C) identify priority areas for aquatic resource and fish and wildlife habitat protection or restoration;
(D) encompass multiple environmental resources within a defined geographical area or focus on a specific resource, such as aquatic resources or wildlife habitat; and
(E) address impacts from all projects in a defined geographical area or focus on a specific type of project.
(5) Consultation. The scope of the plan shall be determined by the Secretary or an entity described in paragraph (3), as appropriate, in consultation with the agency with jurisdiction over the resources being addressed in the environmental mitigation plan.
(6) Contents. A programmatic environmental mitigation plan may include—
(A) an assessment of the condition of environmental resources in the geographical area covered by the plan, including an assessment of recent trends and any potential threats to those resources;
(B) an assessment of potential opportunities to improve the overall quality of environmental resources in the geographical area covered by the plan through strategic mitigation for impacts of water resources development projects;
(C) standard measures for mitigating certain types of impacts;
(D) parameters for determining appropriate mitigation for certain types of impacts, such as mitigation ratios or criteria for determining appropriate mitigation sites;
(E) adaptive management procedures, such as protocols that involve monitoring predicted impacts over time and adjusting mitigation measures in response to information gathered through the monitoring;
(F) acknowledgment of specific statutory or regulatory requirements that must be satisfied when determining appropriate mitigation for certain types of resources; and
(G) any offsetting benefits of self-mitigating projects, such as ecosystem or resource restoration and protection.
(7) Process. Before adopting a programmatic environmental mitigation plan for use under this subsection, the Secretary shall—
(A) for a plan developed by the Secretary—
(i) make a draft of the plan available for review and comment by applicable environmental resource agencies and the public; and
(ii) consider any comments received from those agencies and the public on the draft plan; and
(B) for a plan developed under paragraph (3), determine, not later than 180 days after receiving the plan, whether the plan meets the requirements of paragraphs (4) through (6) and was made available for public comment.
(8) Integration with other plans. A programmatic environmental mitigation plan may be integrated with other plans, including watershed plans, ecosystem plans, species recovery plans, growth management plans, and land use plans.
(9) Consideration in project development and permitting. If a programmatic environmental mitigation plan has been developed under this subsection, any Federal agency responsible for environmental reviews, permits, or approvals for a water resources development project may use the recommendations in that programmatic environmental mitigation plan when carrying out the responsibilities of the agency under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(10) Preservation of existing authorities. Nothing in this subsection limits the use of programmatic approaches to reviews under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(i) Third-party mitigation arrangements.
(1) Eligible activities. In accordance with all applicable Federal laws (including regulations), mitigation efforts carried out under this section may include—
(A) participation in mitigation banking or other third-party mitigation arrangements, such as—
(i) the purchase of credits from commercial or State, regional, or local agency-sponsored mitigation banks; and
(ii) the purchase of credits from in-lieu fee mitigation programs; and
(B) contributions to statewide and regional efforts to conserve, restore, enhance, and create natural habitats and wetlands if the Secretary determines that the contributions will ensure that the mitigation requirements of this section and the goals of section 307(a)(1) of the Water Resources Development Act of 1990 (33 U.S.C. 2317(a)(1)) will be met.
(2) Inclusion of other activities. The banks, programs, and efforts described in paragraph (1) include any banks, programs, and efforts developed in accordance with applicable law (including regulations).
(3) Terms and conditions. In carrying out natural habitat and wetlands mitigation efforts under this section, contributions to the mitigation effort may—
(A) take place concurrent with, or in advance of, the commitment of funding to a project; and
(B) occur in advance of project construction only if the efforts are consistent with all applicable requirements of Federal law (including regulations) and water resources development planning processes.
(4) Preference. At the request of the non-Federal project sponsor, preference may be given, to the maximum extent practicable, to mitigating an environmental impact through the use of a mitigation bank, in-lieu fee, or other third-party mitigation arrangement, if the use of credits from the mitigation bank or in-lieu fee, or the other third-party mitigation arrangement for the project has been approved by the applicable Federal agency.
(j) Use of Funds. The Secretary may use funds made available for preconstruction engineering and design prior to authorization of project construction to satisfy mitigation requirements through third party mechanisms or to acquire interests in land necessary for meeting the mitigation requirements of this section.
(b) Application. The amendments made by subsection (a) shall not apply to a project for which a mitigation plan has been completed as of the date of enactment of this Act.
(c) Technical assistance.
(1) In general. The Secretary may provide technical assistance to States and local governments to establish third-party mitigation instruments, including mitigation banks and in-lieu fee programs, that will help to target mitigation payments to high-priority ecosystem restoration actions.
(2) Requirements. In providing technical assistance under this subsection, the Secretary shall give priority to States and local governments that have developed State, regional, or watershed-based plans identifying priority restoration actions.
(3) Mitigation instruments. The Secretary shall seek to ensure any technical assistance provided under this subsection will support the establishment of mitigation instruments that will result in restoration of high-priority areas identified in the plans under paragraph (2).
SEC. 2006. Mitigation status report. Section 2036(b) of the Water Resources Development Act of 2007 (33 U.S.C. 2283a) is amended—
(1) by redesignating paragraph (3) as paragraph (4); and
(2) by inserting after paragraph (2) the following:
(3) Information included. In reporting the status of all projects included in the report, the Secretary shall—
(A) use a uniform methodology for determining the status of all projects included in the report;
(B) use a methodology that describes both a qualitative and quantitative status for all projects in the report; and
(C) provide specific dates for and participants in the consultations required under section 906(d)(4)(B) of the Water Resources Development Act of 1986 (33 U.S.C. 2283(d)(4)(B)).
SEC. 2007. Independent peer review.
(a) Timing of peer review. Section 2034(b) of the Water Resources Development Act of 2007 (33 U.S.C. 2343(b)) is amended—
(1) by redesignating paragraph (3) as paragraph (4); and
(2) by inserting after paragraph (2) the following:
(3) Reasons for timing. If the Chief of Engineers does not initiate a peer review for a project study at a time described in paragraph (2), the Chief shall—
(A) not later than 7 days after the date on which the Chief of Engineers determines not to initiate a peer review—
(i) notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of that decision; and
(ii) make publicly available, including on the Internet the reasons for not conducting the review; and
(B) include the reasons for not conducting the review in the decision document for the project study.
(b) Establishment of panels. Section 2034(c) of the Water Resources Development Act of 2007 (33 U.S.C. 2343(c)) is amended by striking paragraph (4) and inserting the following:
(4) Congressional and public notification. Following the identification of a project study for peer review under this section, but prior to initiation of the review by the panel of experts, the Chief of Engineers shall, not later than 7 days after the date on which the Chief of Engineers determines to conduct a review—
(A) notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives of the review; and
(B) make publicly available, including on the Internet, information on—
(i) the dates scheduled for beginning and ending the review;
(ii) the entity that has the contract for the review; and
(iii) the names and qualifications of the panel of experts.
(c) Recommendations of panel. Section 2034(f) of the Water Resources Development Act of 2007 (33 U.S.C. 2343(f)) is amended by striking paragraph (2) and inserting the following:
(2) Public availability and submission to Congress. After receiving a report on a project study from a panel of experts under this section, the Chief of Engineers shall make available to the public, including on the Internet, and submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives—
(A) a copy of the report not later than 7 days after the date on which the report is delivered to the Chief of Engineers; and
(B) a copy of any written response of the Chief of Engineers on recommendations contained in the report not later than 3 days after the date on which the response is delivered to the Chief of Engineers.
(3) Inclusion in project study. A report on a project study from a panel of experts under this section and the written response of the Chief of Engineers shall be included in the final decision document for the project study.
(d) Applicability. Section 2034(h)(2) of the Water Resources Development Act of 2007 (33 U.S.C. 2343(h)(2)) is amended by striking “7 years” and inserting “12 years”.
SEC. 2008. Operation and maintenance of navigation and hydroelectric facilities.
(a) In general. Section 314 of the Water Resources Development Act of 1990 (33 U.S.C. 2321) is amended—
(1) by striking the heading and inserting the following:
314. Operation and maintenance of navigation and hydroelectric facilities.
(2) in the first sentence, by striking “Activities currently performed” and inserting the following:
(a) In general. Activities currently performed
(3) in the second sentence, by striking “This section” and inserting the following:
(b) Major maintenance contracts allowed. This section
(4) in subsection (a) (as designated by paragraph (2)), by inserting “navigation or” before “hydroelectric”; and
(5) by adding at the end the following:
(c) Exclusion. This section shall not—
(1) apply to those navigation facilities that have been or are currently under contract with a non-Federal interest to perform operations and maintenance as of the date of enactment of the Water Resources Development Act of 2013; and
(2) prohibit the Secretary from contracting out future commercial activities at those navigation facilities.
(b) Clerical amendment. The table of contents contained in section 1(b) of the Water Resources Development Act of 1990 (104 Stat. 4604) is amended by striking the item relating to section 314 and inserting the following:
SEC. 2009. Hydropower at Corps of Engineers facilities.
(a) Findings. Congress finds that—
(1) in April 2012, the Oak Ridge National Laboratory of the Department of Energy (referred to in this section as the “Oak Ridge Lab”) released a report finding that adding hydroelectric power to the non-powered dams of the United States has the potential to add more than 12 gigawatts of new generating capacity;
(2) the top 10 non-powered dams identified by the Oak Ridge Lab as having the highest hydroelectric power potential could alone supply 3 gigawatts of generating capacity;
(3) of the 50 non-powered dams identified by the Oak Ridge Lab as having the highest hydroelectric power potential, 48 are Corps of Engineers civil works projects;
(4) promoting non-Federal hydroelectric power at Corps of Engineers civil works projects increases the taxpayer benefit of those projects;
(5) the development of non-Federal hydroelectric power at Corps of Engineers civil works projects—
(A) can be accomplished in a manner that is consistent with authorized project purposes and the responsibilities of the Corps of Engineers to protect the environment; and
(B) in many instances, may have additional environmental benefits; and
(6) the development of non-Federal hydroelectric power at Corps of Engineers civil works projects could be promoted through—
(A) clear and consistent lines of responsibility and authority within and across Corps of Engineers districts and divisions on hydroelectric power development activities;
(B) consistent and corresponding processes for reviewing and approving hydroelectric power development; and
(C) developing a means by which non-Federal hydroelectric power developers and stakeholders can resolve disputes with the Corps of Engineers concerning hydroelectric power development activities at Corps of Engineers civil works projects.
(b) Policy. Congress declares that it is the policy of the United States that—
(1) the development of non-Federal hydroelectric power at Corps of Engineers civil works projects, including locks and dams, shall be given priority;
(2) Corps of Engineers approval of non-Federal hydroelectric power at Corps of Engineers civil works projects, including permitting required under section 14 of the Act of March 3, 1899 (33 U.S.C. 408), shall be completed by the Corps of Engineers in a timely and consistent manner; and
(3) approval of hydropower at Corps of Engineers civil works projects shall in no way diminish the other priorities and missions of the Corps of Engineers, including authorized project purposes and habitat and environmental protection.
(c) Report. Not later than 1 year after the date of enactment of this Act and each year thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that, at a minimum, shall include—
(1) a description of initiatives carried out by the Secretary to encourage the development of hydroelectric power by non-Federal entities at Corps of Engineers civil works projects;
(2) a list of all new hydroelectric power activities by non-Federal entities approved at Corps of Engineers civil works projects in that fiscal year, including the length of time the Secretary needed to approve those activities;
(3) a description of the status of each pending application from non-Federal entities for approval to develop hydroelectric power at Corps of Engineers civil works projects;
(4) a description of any benefits or impacts to the environment, recreation, or other uses associated with Corps of Engineers civil works projects at which non-Federal entities have developed hydroelectric power in the previous fiscal year; and
(5) the total annual amount of payments or other services provided to the Corps of Engineers, the Treasury, and any other Federal agency as a result of approved non-Federal hydropower projects at Corps of Engineers civil works projects.
SEC. 2010. Clarification of work-in-kind credit authority.
(a) Non-Federal cost share. Section 7007 of the Water Resources Development Act of 2007 (121 Stat. 1277) is amended—
(1) in subsection (a)—
(A) by inserting “, on, or after” after “before”; and
(B) by inserting “, program,” after “study” each place it appears;
(2) in subsections (b) and (e)(1), by inserting “, program,” after “study” each place it appears; and
(3) by striking subsection (d) and inserting the following:
(d) Treatment of credit between projects. The value of any land, easements, rights-of-way, relocations, and dredged material disposal areas and the costs of planning, design, and construction work provided by the non-Federal interest that exceed the non-Federal cost share for a study, program, or project under this title may be applied toward the non-Federal cost share for any other study, program, or project carried out under this title.
(b) Implementation. Not later than 90 days after the date of enactment of this Act, the Secretary, in coordination with any relevant agencies of the State of Louisiana, shall establish a process by which to carry out the amendments made by subsection (a)(3).
(c) Effective date. The amendments made by subsection (a) take effect on November 8, 2007.
SEC. 2011. Transfer of excess work-in-kind credit.
(a) In general. Subject to subsection (b), the Secretary may apply credit for in-kind contributions provided by a non-Federal interest that is in excess of the required non-Federal cost-share for a water resources study or project toward the required non-Federal cost-share for a different water resources study or project.
(b) Restrictions.
(1) In general. Except for subsection (a)(4)(D)(i) of that section, the requirements of section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b) (as amended by section 2012 of this Act) shall apply to any credit under this section.
(2) Conditions. Credit in excess of the non-Federal cost-share for a study or project may be approved under this section only if—
(A) the non-Federal interest submits a comprehensive plan to the Secretary that identifies—
(i) the studies and projects for which the non-Federal interest intends to provide in-kind contributions for credit that is in excess of the non-Federal cost share for the study or project; and
(ii) the studies and projects to which that excess credit would be applied;
(B) the Secretary approves the comprehensive plan; and
(C) the total amount of credit does not exceed the total non-Federal cost-share for the studies and projects in the approved comprehensive plan.
(c) Additional criteria. In evaluating a request to apply credit in excess of the non-Federal cost-share for a study or project toward a different study or project, the Secretary shall consider whether applying that credit will—
(1) help to expedite the completion of a project or group of projects;
(2) reduce costs to the Federal Government; and
(3) aid the completion of a project that provides significant flood risk reduction or environmental benefits.
(d) Termination of authority. The authority provided in this section shall terminate 10 years after the date of enactment of this Act.
(e) Report.
(1) Deadlines.
(A) In general. Not later than 2 years after the date of enactment of this Act, and once every 2 years thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an interim report on the use of the authority under this section.
(B) Final report. Not later than 10 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a final report on the use of the authority under this section.
(2) Inclusions. The reports described in paragraph (1) shall include—
(A) a description of the use of the authority under this section during the reporting period;
(B) an assessment of the impact of the authority under this section on the time required to complete projects; and
(C) an assessment of the impact of the authority under this section on other water resources projects.
SEC. 2012. Credit for in-kind contributions.
(a) In general. Section 221(a)(4) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)) is amended—
(1) in subparagraph (A), in the matter preceding clause (i) by inserting “or a project under an environmental infrastructure assistance program” after “law”;
(2) in subparagraph (C), by striking “In any case” and all that follows through the period at the end and inserting the following:
(i) Construction.
(I) In general. In any case in which the non-Federal interest is to receive credit under subparagraph (A) for the cost of construction carried out by the non-Federal interest before execution of a partnership agreement and that construction has not been carried out as of the date of enactment of this subparagraph, the Secretary and the non-Federal interest shall enter into an agreement under which the non-Federal interest shall carry out such work prior to the non-Federal interest initiating construction or issuing a written notice to proceed for the construction.
(II) Eligibility. Construction that is carried out after the execution of an agreement to carry out work described in subclause (I) and any design activities that are required for that construction, even if the design activity is carried out prior to the execution of the agreement to carry out work, shall be eligible for credit.
(ii) Planning.
(I) In general. In any case in which the non-Federal interest is to receive credit under subparagraph (A) for the cost of planning carried out by the non-Federal interest before execution of a feasibility cost sharing agreement, the Secretary and the non-Federal interest shall enter into an agreement under which the non-Federal interest shall carry out such work prior to the non-Federal interest initiating that planning.
(II) Eligibility. Planning that is carried out by the non-Federal interest after the execution of an agreement to carry out work described in subclause (I) shall be eligible for credit.
(3) in subparagraph (D)(iii), by striking “sections 101 and 103” and inserting “sections 101(a)(2) and 103(a)(1)(A) of the Water Resources Development Act of 1986 (33 U.S.C. 2211(a)(2); 33 U.S.C. 2213(a)(1)(A))”;
(4) by redesignating subparagraph (E) as subparagraph (H);
(5) by inserting after subparagraph (D) the following:
(E) Analysis of costs and benefits. In the evaluation of the costs and benefits of a project, the Secretary shall not consider construction carried out by a non-Federal interest under this subsection as part of the future without project condition.
(F) Transfer of Credit between Separable Elements of a Project. Credit for in-kind contributions provided by a non-Federal interest that are in excess of the non-Federal cost share for an authorized separable element of a project may be applied toward the non-Federal cost share for a different authorized separable element of the same project.
(G) Application of Credit. To the extent that credit for in-kind contributions, as limited by subparagraph (D), and credit for required land, easements, rights-of-way, dredged material disposal areas, and relocations provided by the non-Federal interest exceed the non-Federal share of the cost of construction of a project other than a navigation project, the Secretary shall reimburse the difference to the non-Federal interest, subject to the availability of funds.
; and
(6) in subparagraph (H) (as redesignated by paragraph (4))—
(A) in clause (i), by inserting “, and to water resources projects authorized prior to the date of enactment of the Water Resources Development Act of 1986 (Public Law 99–662), if correction of design deficiencies is necessary” before the period at the end; and
(B) by striking clause (ii) and inserting the following:
(ii) Authorization in addition to specific credit provision. In any case in which a specific provision of law authorizes credit for in-kind contributions provided by a non-Federal interest before the date of execution of a partnership agreement, the Secretary may apply the authority provided in this paragraph to allow credit for in-kind contributions provided by the non-Federal interest on or after the date of execution of the partnership agreement.
(b) Applicability. Section 2003(e) of the Water Resources Development Act of 2007 (42 U.S.C. 1962d–5b) is amended—
(1) by inserting “, or construction of design deficiency corrections on the project,” after “construction on the project”; and
(2) by inserting “, or under which construction of the project has not been completed and the work to be performed by the non-Federal interests has not been carried out and is creditable only toward any remaining non-Federal cost share,” after “has not been initiated”.
(c) Effective date. The amendments made by subsections (a) and (b) take effect on November 8, 2007.
(d) Guidelines.
(1) In general. Not later than 1 year after the date of enactment of this Act, the Secretary shall update any guidance or regulations for carrying out section 221(a)(4) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)) (as amended by subsection (a)) that are in existence on the date of enactment of this Act or issue new guidelines, as determined to be appropriate by the Secretary.
(2) Inclusions. Any guidance, regulations, or guidelines updated or issued under paragraph (1) shall include, at a minimum—
(A) the milestone for executing an in-kind memorandum of understanding for construction by a non-Federal interest;
(B) criteria and procedures for evaluating a request to execute an in-kind memorandum of understanding for construction by a non-Federal interest that is earlier than the milestone under subparagraph (A) for that execution; and
(C) criteria and procedures for determining whether work carried out by a non-Federal interest is integral to a project.
(3) Public and stakeholder participation. Before issuing any new or revised guidance, regulations, or guidelines or any subsequent updates to those documents, the Secretary shall—
(A) consult with affected non-Federal interests;
(B) publish the proposed guidelines developed under this subsection in the Federal Register; and
(C) provide the public with an opportunity to comment on the proposed guidelines.
(e) Other credit. Nothing in section 221(a)(4) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(a)(4)) (as amended by subsection (a)) affects any eligibility for credit under section 104 of the Water Resources Development of 1986 (33 U.S.C. 2214) that was approved by the Secretary prior to the date of enactment of this Act.
SEC. 2013. Credit in lieu of reimbursement. Section 211(e)(2) of the Water Resources Development Act of 1996 (33 U.S.C. 701b–13(e)(2)) is amended by adding at the end the following:
(C) Studies or other projects. On the request of a non-Federal interest, in lieu of reimbursing a non-Federal interest the amount equal to the estimated Federal share of the cost of an authorized flood damage reduction project or a separable element of an authorized flood damage reduction project under this subsection that has been constructed by the non-Federal interest under this section as of the date of enactment of this Act, the Secretary may provide the non-Federal interest with a credit in that amount, which the non-Federal interest may apply to the share of the cost of the non-Federal interest of carrying out other flood damage reduction projects or studies.
SEC. 2014. Dam optimization.
(a) Definition of other related project benefits. In this section, the term other related project benefits includes—
(1) environmental protection and restoration, including restoration of water quality and water flows, improving movement of fish and other aquatic species, and restoration of floodplains, wetlands, and estuaries;
(2) increased water supply storage (except for any project in the Apalachicola-Chattahoochee-Flint River system and the Alabama-Coosa-Tallapoosa River system);
(3) increased hydropower generation;
(4) reduced flood risk;
(5) additional navigation; and
(6) improved recreation.
(b) Program.
(1) In general. The Secretary may carry out activities—
(A) to improve the efficiency of the operations and maintenance of dams and related infrastructure operated by the Corps of Engineers; and
(B) to maximize, to the extent practicable—
(i) authorized project purposes; and
(ii) other related project benefits.
(2) Eligible activities. An eligible activity under this section is any activity that the Secretary would otherwise be authorized to carry out that is designed to provide other related project benefits in a manner that does not adversely impact the authorized purposes of the project.
(3) Impact on authorized purposes. An activity carried out under this section shall not adversely impact any of the authorized purposes of the project.
(4) Effect.
(A) Existing agreements. Nothing in this section—
(i) supersedes or modifies any written agreement between the Federal Government and a non-Federal interest that is in effect on the date of enactment of this Act; or
(ii) supersedes or authorizes any amendment to a multistate water-control plan, including the Missouri River Master Water Control Manual (as in effect on the date of enactment of this Act).
(B) Water rights. Nothing in this section—
(i) affects any water right in existence on the date of enactment of this Act;
(ii) preempts or affects any State water law or interstate compact governing water; or
(iii) affects any authority of a State, as in effect on the date of enactment of this Act, to manage water resources within that State.
(5) Other laws.
(A) In general. An activity carried out under this section shall comply with all other applicable laws (including regulations).
(B) Water supply. Any activity carried out under this section that results in any modification to water supply storage allocations at a reservoir operated by the Secretary shall comply with section 301 of the Water Supply Act of 1958 (43 U.S.C. 390b).
(c) Policies, regulations, and guidance. The Secretary shall carry out a review of, and as necessary modify, the policies, regulations, and guidance of the Secretary to carry out the activities described in subsection (b).
(d) Coordination.
(1) In general. The Secretary shall—
(A) coordinate all planning and activities carried out under this section with appropriate Federal, State, and local agencies and those public and private entities that the Secretary determines may be affected by those plans or activities; and
(B) give priority to planning and activities under this section if the Secretary determines that—
(i) the greatest opportunities exist for achieving the objectives of the program, as specified in subsection (b)(1), and
(ii) the coordination activities under this subsection indicate that there is support for carrying out those planning and activities.
(2) Non-federal interests. Prior to carrying out an activity under this section, the Secretary shall consult with any applicable non-Federal interest of the affected dam or related infrastructure.
(e) Reports.
(1) In general. Not later than 2 years after the date of enactment of this Act and every 2 years thereafter, the Secretary shall submit to Congress a report describing the actions carried out under this section.
(2) Inclusions. Each report under paragraph (1) shall include—
(A) a schedule for reviewing the operations of individual projects; and
(B) any recommendations of the Secretary on changes that the Secretary determines to be necessary—
(i) to carry out existing project authorizations, including the deauthorization of any water resource project that the Secretary determines could more effectively be achieved through other means;
(ii) to improve the efficiency of water resource project operations; and
(iii) to maximize authorized project purposes and other related project benefits.
(3) Updated report.
(A) In general. Not later than 2 years after the date of enactment of this Act, the Secretary shall update the report entitled “Authorized and Operating Purposes of Corps of Engineers Reservoirs” and dated July 1992, which was produced pursuant to section 311 of the Water Resources Development Act of 1990 (104 Stat. 4639).
(B) Inclusions. The updated report described in subparagraph (A) shall include—
(i) the date on which the most recent review of project operations was conducted and any recommendations of the Secretary relating to that review the Secretary determines to be significant; and
(ii) the dates on which the recommendations described in clause (i) were carried out.
(f) Funding.
(1) In general. The Secretary may use to carry out this section amounts made available to the Secretary from—
(A) the general purposes and expenses account;
(B) the operations and maintenance account; and
(C) any other amounts that are appropriated to carry out this section.
(2) Funding from other sources. The Secretary may accept and expend amounts from non-Federal entities and other Federal agencies to carry out this section.
(g) Cooperative agreements. The Secretary may enter into cooperative agreements with other Federal agencies and non-Federal entities to carry out this section.
SEC. 2015. Water supply. Section 301 of the Water Supply Act of 1958 (43 U.S.C. 390b) is amended by adding at the end the following:
(e) The Committees of jurisdiction are very concerned about the operation of projects in the Apalachicola-Chattahoochee-Flint River System and the Alabama-Coosa-Tallapoosa River System, and further, the Committees of jurisdiction recognize that this ongoing water resources dispute raises serious concerns related to the authority of the Secretary of the Army to allocate substantial storage at projects to provide local water supply pursuant to the Water Supply Act of 1958 absent congressional approval. Interstate water disputes of this nature are more properly addressed through interstate water agreements that take into consideration the concerns of all affected States including impacts to other authorized uses of the projects, water supply for communities and major cities in the region, water quality, freshwater flows to communities, rivers, lakes, estuaries, and bays located downstream of projects, agricultural uses, economic development, and other appropriate concerns. To that end, the Committees of jurisdiction strongly urge the Governors of the affected States to reach agreement on an interstate water compact as soon as possible, and we pledge our commitment to work with the affected States to ensure prompt consideration and approval of any such agreement. Absent such action, the Committees of jurisdiction should consider appropriate legislation to address these matters including any necessary clarifications to the Water Supply Act of 1958 or other law. This subsection does not alter existing rights or obligations under law.
SEC. 2016. Report on water storage pricing formulas.
(a) Findings. Congress finds that—
(1) due to the ongoing drought in many parts of the United States, communities are looking for ways to enhance their water storage on Corps of Engineer reservoirs so as to maintain a reliable supply of water into the foreseeable future;
(2) water storage pricing formulas should be equitable and not create disparities between users; and
(3) water pricing formulas should not be cost-prohibitive for communities.
(b) Assessment.
(1) In general. Not later than 180 days after the date of enactment of this Act, the Comptroller General of the United States shall initiate an assessment of the water storage pricing formulas of the Corps of Engineers, which shall include an assessment of—
(A) existing water storage pricing formulas of the Corps of Engineers, in particular whether those formulas produce water storage costs for some beneficiaries that are greatly disparate from the costs of other beneficiaries; and
(B) whether equitable water storage pricing formulas could lessen the disparate impact and produce more affordable water storage for potential beneficiaries.
(2) Report. The Comptroller General of the United States shall submit to Congress a report on the assessment carried out under paragraph (1).
SEC. 2017. Clarification of previously authorized work.
(a) In General. The Secretary may carry out measures to improve fish species habitat within the footprint and downstream of a water resources project constructed by the Secretary that includes a fish hatchery if the Secretary—
(1) has been explicitly authorized to compensate for fish losses associated with the project; and
(2) determines that the measures are—
(A) feasible;
(B) consistent with authorized project purposes and the fish hatchery; and
(C) in the public interest.
(b) Cost Sharing.
(1) In general. Subject to paragraph (2), the non-Federal interest shall contribute 35 percent of the total cost of carrying out activities under this section, including the costs relating to the provision or acquisition of required land, easements, rights-of-way, dredged material disposal areas, and relocations.
(2) Operation and maintenance. The non-Federal interest shall contribute 100 percent of the costs of operation, maintenance, replacement, repair, and rehabilitation of a project constructed under this section.
(c) Authorization of appropriations. For each fiscal year, there is authorized to be appropriated to carry out this section $30,000,000.
SEC. 2018. Consideration of Federal land in feasibility studies. At the request of the non-Federal interest, the Secretary shall include as part of a regional or watershed study any Federal land that is located within the geographic scope of that study.
SEC. 2019. Planning assistance to States. Section 22 of the Water Resources Development Act of 1974 (42 U.S.C. 1962d–16) is amended—
(1) in subsection (a)—
(A) in paragraph (1)—
(i) by inserting “or other stakeholder working with a State” after “cooperate with any State”; and
(ii) by inserting “, including plans to comprehensively address water resources challenges,” after “of such State”; and
(B) in paragraph (2)(A), by striking “, at Federal expense,”;
(2) in subsection (b)—
(A) in paragraph (1), by striking “subsection (a)(1)” each place it appears and inserting “subsection (a)”;
(B) by redesignating paragraphs (2) and (3) as paragraphs (3) and (4), respectively; and
(C) by inserting after paragraph (1) the following:
(2) Contributed funds. The Secretary may accept and expend funds in excess of the fees established under paragraph (1) that are provided by a State or other non-Federal public body for assistance under this section.
; and
(3) in subsection (c)—
(A) in paragraph (1)—
(i) by striking “$10,000,000” and inserting “$30,000,000”; and
(ii) by striking “$2,000,000” and inserting “$5,000,000 in Federal funds”; and
(B) in paragraph (2), by striking “$5,000,000” and inserting “$15,000,000”.
SEC. 2020. Vegetation management policy.
(a) Definition of national guidelines. In this section, the term national guidelines means the Corps of Engineers policy guidelines for management of vegetation on levees, including—
(1) Engineering Technical Letter 1110–2–571 entitled “Guidelines for Landscape Planting and Vegetation Management at Levees, Floodwalls, Embankment Dams, and Appurtenant Structures” and adopted April 10, 2009; and
(2) the draft policy guidance letter entitled “Process for Requesting a Variance from Vegetation Standards for Levees and Floodwalls” (77 Fed. Reg. 9637 (Feb. 17, 2012)).
(b) Review. Not later than 180 days after the date of enactment of this Act, the Secretary shall carry out a comprehensive review of the national guidelines in order to determine whether current Federal policy relating to levee vegetation is appropriate for all regions of the United States.
(c) Factors.
(1) In general. In carrying out the review, the Secretary shall consider—
(A) the varied interests and responsibilities in managing flood risks, including the need—
(i) to provide for levee safety with limited resources; and
(ii) to ensure that levee safety investments minimize environmental impacts and provide corresponding public safety benefits;
(B) the levee safety benefits that can be provided by woody vegetation;
(C) the preservation, protection, and enhancement of natural resources, including—
(i) the benefit of vegetation on levees in providing habitat for endangered, threatened, and candidate species; and
(ii) the impact of removing levee vegetation on compliance with other regulatory requirements;
(D) protecting the rights of Indian tribes pursuant to treaties and statutes;
(E) the available science and the historical record regarding the link between vegetation on levees and flood risk;
(F) the avoidance of actions requiring significant economic costs and environmental impacts; and
(G) other factors relating to the factors described in subparagraphs (A) through (F) identified in public comments that the Secretary determines to be appropriate.
(2) Variance considerations.
(A) In general. In carrying out the review, the Secretary shall specifically consider whether the national guidelines can be amended to promote and allow for consideration of variances from national guidelines on a Statewide, tribal, regional, or watershed basis, including variances based on—
(i) soil conditions;
(ii) hydrologic factors;
(iii) vegetation patterns and characteristics;
(iv) environmental resources, including endangered, threatened, or candidate species and related regulatory requirements;
(v) levee performance history, including historical information on original construction and subsequent operation and maintenance activities;
(vi) any effects on water supply;
(vii) any scientific evidence on the link between levee vegetation and levee safety;
(viii) institutional considerations, including implementation challenges;
(ix) the availability of limited funds for levee construction and rehabilitation;
(x) the economic and environmental costs of removing woody vegetation on levees; and
(xi) other relevant factors identified in public comments that the Secretary determines to be appropriate.
(B) Scope. The scope of a variance approved by the Secretary may include a complete exemption to national guidelines, as the Secretary determines to be necessary.
(d) Cooperation and consultation; recommendations.
(1) In general. The Secretary shall carry out the review under this section in consultation with other applicable Federal agencies, representatives of State, regional, local, and tribal governments, appropriate nongovernmental organizations, and the public.
(2) Recommendations. The Chief of Engineers and any State, tribal, regional, or local entity may submit to the Secretary any recommendations for vegetation management policies for levees that conform with Federal and State laws, including recommendations relating to the review of national guidelines under subsection (b) and the consideration of variances under subsection (c)(2).
(e) Peer review.
(1) In general. As part of the review, the Secretary shall solicit and consider the views of the National Academy of Engineering and the National Academy of Sciences on the engineering, environmental, and institutional considerations underlying the national guidelines, including the factors described in subsection (c) and any information obtained by the Secretary under subsection (d).
(2) Availability of views. The views of the National Academy of Engineering and the National Academy of Sciences obtained under paragraph (1) shall be—
(A) made available to the public; and
(B) included in supporting materials issued in connection with the revised national guidelines required under subsection (f).
(f) Revision of national guidelines.
(1) In general. Not later than 2 years after the date of enactment of this Act, the Secretary shall—
(A) revise the national guidelines based on the results of the review, including—
(i) recommendations received as part of the consultation described in subsection (d)(1); and
(ii) the results of the peer review conducted under subsection (e); and
(B) submit to Congress a report that contains a summary of the activities of the Secretary and a description of the findings of the Secretary under this section.
(2) Content; incorporation into manual. The revised national guidelines shall—
(A) provide a practical, flexible process for approving Statewide, tribal, regional, or watershed variances from the national guidelines that—
(i) reflect due consideration of the factors described in subsection (c); and
(ii) incorporate State, tribal, and regional vegetation management guidelines for specific areas that have been adopted through a formal public process; and
(B) be incorporated into the manual proposed under section 5(c) of the Act entitled “An Act authorizing the construction of certain public works on rivers and harbors for flood control, and for other purposes”, approved August 18, 1941 (33 U.S.C. 701n(c)).
(3) Failure to meet deadlines. If the Secretary fails to submit a report by the required deadline under this subsection, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a detailed explanation of—
(A) why the deadline was missed;
(B) solutions needed to meet the deadline; and
(C) a projected date for submission of the report.
(g) Continuation of work. Concurrent with the completion of the requirements of this section, the Secretary shall proceed without interruption or delay with those ongoing or programmed projects and studies, or elements of projects or studies, that are not directly related to vegetation variance policy.
(h) Interim actions.
(1) In general. Until the date on which revisions to the national guidelines are adopted in accordance with subsection (f), the Secretary shall not require the removal of existing vegetation as a condition or requirement for any approval or funding of a project, or any other action, unless the specific vegetation has been demonstrated to present an unacceptable safety risk.
(2) Revisions. Beginning on the date on which the revisions to the national guidelines are adopted in accordance with subsection (f), the Secretary shall consider, on request of an affected entity, any previous action of the Corps of Engineers in which the outcome was affected by the former national guidelines.
SEC. 2021. Levee certifications.
(a) Implementation of flood protection structure accreditation task force. In carrying out section 100226 of the Biggert-Waters Flood Insurance Reform Act of 2012 (42 U.S.C. 4101 note; 126 Stat. 942), the Secretary shall—
(1) ensure that at least 1 program activity carried out under the inspection of completed works program of the Corps of Engineers provides adequate information to the Secretary to reach a levee accreditation decision for each requirement under section 65.10 of title 44, Code of Federal Regulations (or successor regulation); and
(2) to the maximum extent practicable, carry out activities under the inspection of completed works program of the Corps of Engineers in alignment with the schedule established for the national flood insurance program established under chapter 1 of the National Flood Insurance Act of 1968 (42 U.S.C. 4011 et seq.).
(b) Accelerated levee system evaluations and certifications.
(1) In general. On receipt of a request from a non-Federal interest, the Secretary may carry out a levee system evaluation and certification of a federally authorized levee for purposes of the national flood insurance program established under chapter 1 of the National Flood Insurance Act of 1968 (42 U.S.C. 4011 et seq.) if the evaluation and certification will be carried out earlier than such an evaluation and certification would be carried out under subsection (a).
(2) Requirements. A levee system evaluation and certification under paragraph (1) shall—
(A) at a minimum, comply with section 65.10 of title 44, Code of Federal Regulations (as in effect on the date of enactment of this Act); and
(B) be carried out in accordance with such procedures as the Secretary, in consultation with the Director of the Federal Emergency Management Agency, may establish.
(3) Cost Sharing.
(A) Non-Federal share. Subject to subparagraph (B), the non-Federal share of the cost of carrying out a levee system evaluation and certification under this subsection shall be 35 percent.
(B) Adjustment. The Secretary shall adjust the non-Federal share of the cost of carrying out a levee system evaluation and certification under this subsection in accordance with section 103(m) of the Water Resources Development Act of 1986 (33 U.S.C. 2213(m)).
(4) Application. Nothing in this subsection affects the requirement under section 100226(b)(2) of the Biggert-Waters Flood Insurance Reform Act of 2012 (42 U.S.C. 4101 note; 126 Stat. 942).
SEC. 2022. Restoration of flood and hurricane storm damage reduction projects.
(a) In general. The Secretary shall carry out any measures necessary to repair or restore federally authorized flood and hurricane and storm damage reduction projects constructed by the Corps of Engineers to authorized levels (as of the date of enactment of this Act) of protection for reasons including settlement, subsidence, sea level rise, and new datum, if the Secretary determines the necessary work is technically feasible, environmentally acceptable, and economically justified.
(b) Cost share. The non-Federal share of the cost of construction of a project carried out under this section shall be determined as provided in subsections (a) through (d) of section 103 of the Water Resources Development Act of 1986 (33 U.S.C. 2213).
(c) Operations and maintenance. The non-Federal share of the cost of operations, maintenance, repair, replacement, and rehabilitation for a project carried out under this section shall be 100 percent.
(d) Eligibility of projects transferred to non-Federal interest. The Secretary may carry out measures described in subsection (a) on a water resources project, separable element of a project, or functional component of a project that has been transferred to the non-Federal interest.
(e) Report to Congress. Not later than 8 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report on the implementation of this section, including—
(1) any recommendations relating to the continued need for the authority provided in this section;
(2) a description of the measures carried out under this section;
(3) any lessons learned relating to the measures implemented under this section; and
(4) best practices for carrying out measures to restore flood and hurricane and storm damage reduction projects.
(f) Termination of authority. The authority to carry out a measure under this section terminates on the date that is 10 years after the date of enactment of this Act.
(g) Authorization of appropriations. There is authorized to be appropriated to the Secretary to carry out this section $250,000,000.
SEC. 2023. Operation and maintenance of certain projects. The Secretary may assume operation and maintenance activities for a navigation channel that is deepened by a non-Federal interest prior to December 31, 2012, if—
(1) the Secretary determines that the requirements under paragraphs (2) and (3) of section 204(f) of the Water Resources Development Act of 1986 (33 U.S.C. 2232(f)) are met;
(2) the Secretary determines that the activities carried out by the non-Federal interest in deepening the navigation channel are economically justified and environmentally acceptable; and
(3) the deepening activities have been carried out on a Federal navigation channel that—
(A) exists as of the date of enactment of this Act; and
(B) has been authorized by Congress.
SEC. 2024. Dredging study.
(a) In general. The Secretary, in conjunction with other relevant Federal agencies and applicable non-Federal interests, shall carry out a study—
(1) to compare domestic and international dredging markets, including costs, technologies, and management approaches used in each respective market, and determine the impacts of those markets on dredging needs and practices in the United States;
(2) to analyze past and existing practices, technologies, and management approaches used in dredging in the United States; and
(3) to develop recommendations relating to the best techniques, practices, and management approaches for dredging in the United States.
(b) Purposes. The purposes of the study under this section are—
(1) the identification of the best techniques, methods, and technologies for dredging, including the evaluation of the feasibility, cost, and benefits of—
(A) new dredging technologies; and
(B) improved dredging practices and techniques;
(2) the appraisal of the needs of the United States for dredging, including the need to increase the size of private and Corps of Engineers dredging fleets to meet demands for additional construction or maintenance dredging needed as of the date of enactment of this Act and in the subsequent 20 years;
(3) the identification of any impediments to dredging, including any recommendations of appropriate alternatives for responding to those impediments;
(4) the assessment, including any recommendations of appropriate alternatives, of the adequacy and effectiveness of—
(A) the economic, engineering, and environmental methods, models, and analyses used by the Chief of Engineers and private dredging operations for dredging; and
(B) the current cost structure of construction contracts entered into by the Chief of Engineers;
(5) the evaluation of the efficiency and effectiveness of past, current, and alternative dredging practices and alternatives to dredging, including agitation dredging; and
(6) the identification of innovative techniques and cost-effective methods to expand regional sediment management efforts, including the placement of dredged sediment within river diversions to accelerate the creation of wetlands.
(c) Study team.
(1) In general. The Secretary shall establish a study team to assist the Secretary in planning, carrying out, and reporting on the results of the study under this section.
(2) Study team. The study team established pursuant to paragraph (1) shall—
(A) be appointed by the Secretary; and
(B) represent a broad spectrum of experts in the field of dredging and representatives of relevant State agencies and relevant non-Federal interests.
(d) Public comment period. The Secretary shall—
(1) make available to the public, including on the Internet, all draft and final study findings under this section; and
(2) allow for a public comment period of not less than 30 days on any draft study findings prior to issuing final study findings.
(e) Report to congress. Not later than 2 years after the date of enactment of this Act, and subject to available appropriations, the Secretary, in consultation with the study team established under subsection (c), shall submit a detailed report on the results of the study to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives.
(f) Failure To meet deadlines. If the Secretary does not complete the study under this section and submit a report to Congress under subsection (e) on or before the deadline described in that subsection, the Secretary shall notify Congress and describe why the study was not completed.
SEC. 2025. Non-Federal project implementation pilot program.
(a) In general. Not later than 180 days after the date of enactment of this Act, the Secretary shall establish and implement a pilot program to evaluate the cost-effectiveness and project delivery efficiency of allowing non-Federal interests to carry out flood risk management, hurricane and storm damage reduction, coastal harbor and channel inland navigation, and aquatic ecosystem restoration projects.
(b) Purposes. The purposes of the pilot program are—
(1) to identify project delivery and cost-saving alternatives that reduce the backlog of authorized Corps of Engineers projects;
(2) to evaluate the technical, financial, and organizational efficiencies of a non-Federal interest carrying out the design, execution, management, and construction of 1 or more projects; and
(3) to evaluate alternatives for the decentralization of the project management, design, and construction for authorized Corps of Engineers water resources projects.
(c) Administration.
(1) In general. In carrying out the pilot program, the Secretary shall—
(A) identify a total of not more than 15 projects for flood risk management, hurricane and storm damage reduction (including levees, floodwalls, flood control channels, and water control structures), coastal harbor and channels, inland navigation, and aquatic ecosystem restoration that have been authorized for construction prior to the date of enactment of this Act, including—
(i) not more than 12 projects that—
(I)
(aa) have received Federal funds prior to the date of enactment of this Act; or
(bb) for more than 2 consecutive fiscal years, have an unobligated funding balance for that project in the Corps of Engineers construction account; and
(II) to the maximum extent practicable, are located in each of the divisions of the Corps of Engineers; and
(ii) not more than 3 projects that have not received Federal funds in the period beginning on the date on which the project was authorized and ending on the date of enactment of this Act;
(B) notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives on the identification of each project under the pilot program;
(C) in collaboration with the non-Federal interest, develop a detailed project management plan for each identified project that outlines the scope, budget, design, and construction resource requirements necessary for the non-Federal interest to execute the project, or a separable element of the project;
(D) on the request of the non-Federal interest, enter into a project partnership agreement with the non-Federal interest for the non-Federal interest to provide full project management control for construction of the project, or a separable element of the project, in accordance with plans approved by the Secretary;
(E) following execution of the project partnership agreement, transfer to the non-Federal interest to carry out construction of the project, or a separable element of the project—
(i) if applicable, the balance of the unobligated amounts appropriated for the project, except that the Secretary shall retain sufficient amounts for the Corps of Engineers to carry out any responsibilities of the Corps of Engineers relating to the project and pilot program; and
(ii) additional amounts, as determined by the Secretary, from amounts made available under subsection (h), except that the total amount transferred to the non-Federal interest shall not exceed the updated estimate of the Federal share of the cost of construction, including any required design; and
(F) regularly monitor and audit each project being constructed by a non-Federal interest under this section to ensure that the construction activities are carried out in compliance with the plans approved by the Secretary and that the construction costs are reasonable.
(2) Detailed project schedule. Not later than 180 days after entering into an agreement under paragraph (1)(D), each non-Federal interest, to the maximum extent practicable, shall submit to the Secretary a detailed project schedule, based on estimated funding levels, that lists all deadlines for each milestone in the construction of the project.
(3) Technical assistance. On the request of a non-Federal interest, the Secretary may provide technical assistance to the non-Federal interest, if the non-Federal interest contracts with and compensates the Secretary for the technical assistance relating to—
(A) any study, engineering activity, and design activity for construction carried out by the non-Federal interest under this section; and
(B) expeditiously obtaining any permits necessary for the project.
(d) Cost-share. Nothing in this section affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to a project carried out under this section.
(e) Report.
(1) In general. Not later than 3 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report detailing the results of the pilot program carried out under this section, including—
(A) a description of the progress of non-Federal interests in meeting milestones in detailed project schedules developed pursuant to subsection (c)(2); and
(B) any recommendations of the Secretary concerning whether the program or any component of the program should be implemented on a national basis.
(2) Update. Not later than 5 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an update of the report described in paragraph (1).
(3) Failure to meet deadline. If the Secretary fails to submit a report by the required deadline under this subsection, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation Infrastructure of the House of Representatives a detailed explanation of why the deadline was missed and a projected date for submission of the report.
(f) Administration. All laws and regulations that would apply to the Secretary if the Secretary were carrying out the project shall apply to a non-Federal interest carrying out a project under this section.
(g) Termination of Authority. The authority to commence a project under this section terminates on the date that is 5 years after the date of enactment of this Act.
(h) Authorization of appropriations. In addition to any amounts appropriated for a specific project, there is authorized to be appropriated to the Secretary to carry out the pilot program under this section, including the costs of administration of the Secretary, $25,000,000 for each of fiscal years 2014 through 2018.
SEC. 2026. Non-Federal implementation of feasibility studies.
(a) In general. Not later than 180 days after the date of enactment of this Act, the Secretary shall establish and implement a pilot program to evaluate the cost-effectiveness and project delivery efficiency of allowing non-Federal interests to carry out feasibility studies for flood risk management, hurricane and storm damage reduction, aquatic ecosystem restoration, and coastal harbor and channel and inland navigation.
(b) Purposes. The purposes of the pilot program are—
(1) to identify project delivery and cost-saving alternatives to the existing feasibility study process;
(2) to evaluate the technical, financial, and organizational efficiencies of a non-Federal interest carrying out a feasibility study of 1 or more projects; and
(3) to evaluate alternatives for the decentralization of the project planning, management, and operational decisionmaking process of the Corps of Engineers.
(c) Administration.
(1) In general. On the request of a non-Federal interest, the Secretary may enter into an agreement with the non-Federal interest for the non-Federal interest to provide full project management control of a feasibility study for a project for—
(A) flood risk management;
(B) hurricane and storm damage reduction, including levees, floodwalls, flood control channels, and water control structures;
(C) coastal harbor and channel and inland navigation; and
(D) aquatic ecosystem restoration.
(2) Use of non-Federal-funds.
(A) In general. A non-Federal interest that has entered into an agreement with the Secretary pursuant to paragraph (1) may use non-Federal funds to carry out the feasibility study.
(B) Credit. The Secretary shall credit towards the non-Federal share of the cost of construction of a project for which a feasibility study is carried out under this section an amount equal to the portion of the cost of developing the study that would have been the responsibility of the Secretary, if the study were carried out by the Secretary, subject to the conditions that—
(i) non-Federal funds were used to carry out the activities that would have been the responsibility of the Secretary;
(ii) the Secretary determines that the feasibility study complies with all applicable Federal laws and regulations; and
(iii) the project is authorized by any provision of Federal law enacted after the date on which an agreement is entered into under paragraph (1).
(3) Transfer of funds.
(A) In general. After the date on which an agreement is executed pursuant to paragraph (1), the Secretary may transfer to the non-Federal interest to carry out the feasibility study—
(i) if applicable, the balance of any unobligated amounts appropriated for the study, except that the Secretary shall retain sufficient amounts for the Corps of Engineers to carry out any responsibilities of the Corps of Engineers relating to the project and pilot program; and
(ii) additional amounts, as determined by the Secretary, from amounts made available under subsection (h), except that the total amount transferred to the non-Federal interest shall not exceed the updated estimate of the Federal share of the cost of the feasibility study.
(B) Administration. The Secretary shall include such provisions as the Secretary determines to be necessary in an agreement under paragraph (1) to ensure that a non-Federal interest receiving Federal funds under this paragraph—
(i) has the necessary qualifications to administer those funds; and
(ii) will comply with all applicable Federal laws (including regulations) relating to the use of those funds.
(4) Notification. The Secretary shall notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives on the initiation of each feasibility study under the pilot program.
(5) Auditing. The Secretary shall regularly monitor and audit each feasibility study carried out by a non-Federal interest under this section to ensure that the use of any funds transferred under paragraph (3) are used in compliance with the agreement signed under paragraph (1).
(6) Technical assistance. On the request of a non-Federal interest, the Secretary may provide technical assistance to the non-Federal interest relating to any aspect of the feasibility study, if the non-Federal interest contracts with the Secretary for the technical assistance and compensates the Secretary for the technical assistance.
(7) Detailed project schedule. Not later than 180 days after entering into an agreement under paragraph (1), each non-Federal interest, to the maximum extent practicable, shall submit to the Secretary a detailed project schedule, based on full funding capability, that lists all deadlines for milestones relating to the feasibility study.
(d) Cost-share. Nothing in this section affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to a feasibility study carried out under this section.
(e) Report.
(1) In general. Not later than 2 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report detailing the results of the pilot program carried out under this section, including—
(A) a description of the progress of the non-Federal interests in meeting milestones in detailed project schedules developed pursuant to subsection (c)(7); and
(B) any recommendations of the Secretary concerning whether the program or any component of the program should be implemented on a national basis.
(2) Update. Not later than 5 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an update of the report described in paragraph (1).
(3) Failure to meet deadline. If the Secretary fails to submit a report by the required deadline under this subsection, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation Infrastructure of the House of Representatives a detailed explanation of why the deadline was missed and a projected date for submission of the report.
(f) Administration. All laws and regulations that would apply to the Secretary if the Secretary were carrying out the feasibility study shall apply to a non-Federal interest carrying out a feasibility study under this section.
(g) Termination of authority. The authority to commence a feasibility study under this section terminates on the date that is 5 years after the date of enactment of this Act.
(h) Authorization of appropriations. In addition to any amounts appropriated for a specific project, there is authorized to be appropriated to the Secretary to carry out the pilot program under this section, including the costs of administration of the Secretary, $25,000,000 for each of fiscal years 2014 through 2018.
SEC. 2027. Tribal partnership program. Section 203 of the Water Resources Development Act of 2000 (33 U.S.C. 2269) is amended—
(1) in subsection (d)(1)(B)—
(A) by striking “The ability” and inserting the following:
(i) In general. The ability
; and
(B) by adding at the end the following:
(ii) Determination. Not later than 180 days after the date of enactment of the Water Resources Development Act of 2013, the Secretary shall issue guidance on the procedures described in clause (i).
; and
(2) in subsection (e), by striking “2012” and inserting “2023”.
SEC. 2028. Cooperative agreements with Columbia River Basin Indian tribes. The Secretary may enter into a cooperative agreement with 1 or more federally recognized Indian tribes (or a designated representative of the Indian tribes) that are located, in whole or in part, within the boundaries of the Columbia River Basin to carry out authorized activities within the Columbia River Basin to protect fish, wildlife, water quality, and cultural resources.
SEC. 2029. Military munitions response actions at civil works shoreline protection projects.
(a) In general. The Secretary may implement any response action the Secretary determines to be necessary at a site where—
(1) the Secretary has carried out a project under civil works authority of the Secretary that includes placing sand on a beach;
(2) as a result of the project described in paragraph (1), military munitions that were originally released as a result of Department of Defense activities are deposited on the beach, posing a threat to human health or the environment.
(b) Response action funding. A response action described in subsection (a) shall be funded from amounts made available to the agency within the Department of Defense responsible for the original release of the munitions.
SEC. 2030. Beach nourishment. Section 156 of the Water Resources Development Act of 1976 (42 U.S.C. 1962d–5f) is amended to read as follows:
156. Beach nourishment.
(a) In general. Subject to subsection (b)(2)(A), the Secretary of the Army, acting through the Chief of Engineers, may provide periodic beach nourishment for each water resources development project for which that nourishment has been authorized for an additional period of time, as determined by the Secretary, subject to the condition that the additional period shall not exceed the later of—
(1) 50 years after the date on which the construction of the project is initiated; or
(2) the date on which the last estimated periodic nourishment for the project is to be carried out, as recommended in the applicable report of the Chief of Engineers.
(b) Extension.
(1) In general. Except as provided in paragraph (3), before the date on which the 50-year period referred to in subsection (a)(1) expires, the Secretary of the Army, acting through the Chief of Engineers—
(A) may, at the request of the non-Federal interest and subject to the availability of appropriations, carry out a review of a nourishment project carried out under subsection (a) to evaluate the feasibility of continuing Federal participation in the project for a period not to exceed 15 years; and
(B) shall submit to Congress any recommendations of the Secretary relating to the review.
(2) Plan for reducing risk to people and property.
(A) In general. The non-Federal interest shall submit to the Secretary a plan for reducing the risk to people and property during the life of the project.
(B) Inclusion in report to Congress. The Secretary shall submit to Congress the plan described in subparagraph (A) with the recommendations submitted in paragraph (1)(B).
(3) Review commenced within 2 years of expiration of 50-year period.
(A) In general. If the Secretary of the Army commences a review under paragraph (1) not earlier than the period beginning on the date that is 2 years before the date on which the 50-year period referred to in subsection (a)(1) expires and ending on the date on which the 50-year period expires, the project shall remain authorized after the expiration of the 50-year period until the earlier of—
(i) 3 years after the expiration of the 50-year period; or
(ii) the date on which a determination is made as to whether to extend Federal participation in the project in accordance with paragraph (1).
(B) Calculation of time period for extension. Notwithstanding clauses (i) and (ii) of subparagraph (A) and after a review under subparagraph (A) is completed, if a determination is made to extend Federal participation in the project in accordance with paragraph (1) for a period not to exceed 15 years, that period shall begin on the date on which the determination is made.
SEC. 2031. Regional sediment management. Section 204 of the Water Resources Development Act of 1992 (33 U.S.C. 2326) (as amended by section 2003(c)) is amended—
(1) in subsection (a)—
(A) in paragraph (1), by inserting “or used in” after “obtained through”; and
(B) in paragraph (3)(C), by inserting “for the purposes of improving environmental conditions in marsh and littoral systems, stabilizing stream channels, enhancing shorelines, and supporting State and local risk management adaptation strategies” before the period at the end;
(2) in subsection (c)(1)(B)—
(A) in clause (i), by striking “clause (ii)” and inserting “clauses (ii) and (iii)”;
(B) by redesignating clause (ii) as clause (iii); and
(C) by inserting after clause (i) the following:
(ii) Reduction in non-Federal share. The Secretary may reduce the non-Federal share of the costs of construction of a project if the Secretary determines that, through the beneficial use of sediment at another Federal project, there will be an associated reduction or avoidance of Federal costs.
(3) in subsection (d)—
(A) by striking the subsection designation and heading and inserting the following:
(d) Selection of Dredged Material Disposal Method for Purposes Related to Environmental Restoration or Storm Damage and Flood Reduction.
; and
(B) in paragraph (1), by striking “in relation to” and all that follows through the period at the end and inserting “in relation to—
(A) the environmental benefits, including the benefits to the aquatic environment to be derived from the creation of wetlands and control of shoreline erosion; or
(B) the flood and storm damage and flood reduction benefits, including shoreline protection, protection against loss of life, and damage to improved property.
; and
(4) in subsection (e), by striking paragraph (1) and inserting the following:
(1) cooperate with any State or group of States in the preparation of a comprehensive State or regional sediment management plan within the boundaries of the State or among States;
SEC. 2032. Study acceleration.
(a) Findings. Congress finds that—
(1) delays in the completion of feasibility studies—
(A) increase costs for the Federal Government as well as State and local governments; and
(B) delay the implementation of water resources projects that provide critical benefits, including reducing flood risk, maintaining commercially important flood risk, and restoring vital ecosystems; and
(2) the efforts undertaken by the Corps of Engineers through the establishment of the “3–3–3” planning process should be continued.
(b) Acceleration of Studies.
(1) In general. Subject to paragraphs (2) and (3), a feasibility study initiated after the date of enactment of this Act shall—
(A) be completed not later than 3 years after the date of initiation of the study; and
(B) have a maximum Federal cost share of $3,000,000.
(2) Ability to comply. On initiating a feasibility study under paragraph (1), the Secretary shall—
(A) certify that the study will comply with the requirements of paragraph (1);
(B) for projects the Secretary determines to be too complex to comply with the requirements of paragraph (1)—
(i) not less than 30 days after making a determination, notify the non-Federal interest regarding the inability to comply; and
(ii) provide a new projected timeline and cost; and
(C) if the study conditions have changed such that scheduled timelines or study costs will not be met—
(i) not later than 30 days after the study conditions change, notify the non-Federal interest of those changed conditions; and
(ii) present the non-Federal interest with a new timeline for completion and new projected study costs.
(3) Appropriations.
(A) In general. All timeline and cost conditions under this section shall be subject to the Secretary receiving adequate appropriations for meeting study timeline and cost requirements.
(B) Notification. Not later than 60 days after receiving appropriations, the Secretary shall notify the non-Federal interest of any changes to timelines or costs due to inadequate appropriations.
(c) Report. Not later than 18 months after the date of enactment of this Act and each year thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that describes—
(1) the status of the implementation of the “3–3–3” planning process, including the number of participating projects;
(2) the amount of time taken to complete all studies participating in the “3–3–3” planning process; and
(3) any recommendations for additional authority necessary to support efforts to expedite the feasibility study process for water resource projects.
SEC. 2033. Project acceleration. Section 2045 of the Water Resources Development Act of 2007 (33 U.S.C. 2348) is amended to read as follows:
2045. Project acceleration.
(a) Definitions. In this section:
(1) Environmental impact statement. The term environmental impact statement means the detailed statement of environmental impacts of water resource projects required to be prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(2) Environmental review process.
(A) In general. The term environmental review process means the process of preparing an environmental impact statement, environmental assessment, categorical exclusion, or other document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for a water resource project.
(B) Inclusions. The term environmental review process includes the process for and completion of any environmental permit, approval, review, or study required for a water resource project under any Federal law other than the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(3) Federal jurisdictional agency. The term Federal jurisdictional agency means a Federal agency with jurisdiction delegated by law, regulation, order, or otherwise over an approval or decision required for a water resource project under applicable Federal laws (including regulations).
(4) Lead agency. The term lead agency means the Corps of Engineers and, if applicable, any State, local, or tribal governmental entity serving as a joint lead agency pursuant to section 1506.3 of title 40, Code of Federal Regulations (or a successor regulation).
(5) Water resource project. The term water resource project means a Corps of Engineers water resource project.
(b) Policy. The benefits of water resource projects designed and carried out in an economically and environmentally sound manner are important to the economy and environment of the United States, and recommendations to Congress regarding those projects should be developed using coordinated and efficient review and cooperative efforts to prevent or quickly resolve disputes during the planning of those water resource projects.
(c) Applicability.
(1) In general. The project planning procedures under this section apply to proposed projects initiated after the date of enactment of the Water Resources Development Act of 2013 and for which the Secretary determines that—
(A) an environmental impact statement is required; or
(B) at the discretion of the Secretary, other water resource projects for which an environmental review process document is required to be prepared.
(2) Flexibility. Any authorities granted in this section may be exercised, and any requirements established under this section may be satisfied, for the planning of a water resource project, a class of those projects, or a program of those projects.
(3) List of water resources development projects.
(A) In general. The Secretary shall annually prepare, and make publicly available, a separate list of each study that the Secretary has determined—
(i) meets the standards described in paragraph (1); and
(ii) does not have adequate funding to make substantial progress toward the completion of the planning activities for the water resource project.
(B) Inclusions. The Secretary shall include for each study on the list under subparagraph (A) a description of the estimated amounts necessary to make substantial progress on the study.
(4) Implementation guidance. The Secretary shall prepare, in consultation with the Council on Environmental Quality and other Federal agencies with jurisdiction over actions or resources that may be impacted by a water resource project, guidance documents that describe the coordinated review processes that the Secretary will use to implement this section for the planning of water resource projects, in accordance with the civil works program of the Corps of Engineers and all applicable law.
(d) Water resource project review process.
(1) In general. The Secretary shall develop and implement a coordinated review process for the development of water resource projects.
(2) Coordinated review. The coordinated review process described in paragraph (1) shall require that any analysis, opinion, permit, license, statement, and approval issued or made by a Federal, State, or local governmental agency or an Indian tribe for the planning of a water resource project described in subsection (b) be conducted, to the maximum extent practicable, concurrently with any other applicable governmental agency or Indian tribe.
(3) Timing. The coordinated review process under this subsection shall be completed not later than the date on which the Secretary, in consultation and concurrence with the agencies identified under subsection (e), establishes with respect to the water resource project.
(e) Identification of jurisdictional agencies. With respect to the development of each water resource project, the Secretary shall identify, as soon as practicable, all Federal, State, and local government agencies and Indian tribes that may—
(1) have jurisdiction over the water resource project;
(2) be required by law to conduct or issue a review, analysis, or opinion for the water resource project; or
(3) be required to make a determination on issuing a permit, license, or approval for the water resource project.
(f) State authority. If the coordinated review process is being implemented under this section by the Secretary with respect to the planning of a water resource project described in subsection (c) within the boundaries of a State, the State, consistent with State law, may choose to participate in the process and to make subject to the process all State agencies that—
(1) have jurisdiction over the water resource project;
(2) are required to conduct or issue a review, analysis, or opinion for the water resource project; or
(3) are required to make a determination on issuing a permit, license, or approval for the water resource project.
(g) Lead agencies.
(1) Federal lead agency. Subject to paragraph (2), the Corps of Engineers shall be the lead Federal agency in the environmental review process for a water resource project.
(2) Joint lead agencies.
(A) In general. At the discretion of the Secretary and subject to any applicable regulations under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), including the concurrence of the proposed joint lead agency, an agency other than the Corps of Engineers may serve as the joint lead agency.
(B) Non-Federal interest as joint lead agency. A non-Federal interest that is a State or local governmental entity—
(i) may, with the concurrence of the Secretary, serve as a joint lead agency with the Corps of Engineers for purposes of preparing any environmental document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(ii) may prepare any environmental review process document under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) required in support of any action or approval by the Secretary if—
(I) the Secretary provides guidance in the preparation process and independently evaluates that document
(II) the non-Federal interest complies with all requirements applicable to the Secretary under—
(aa) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(bb) any regulation implementing that Act; and
(cc) any other applicable Federal law; and
(III) the Secretary approves and adopts the document before the Secretary takes any subsequent action or makes any approval based on that document, regardless of whether the action or approval of the Secretary results in Federal funding.
(3) Duties. The Secretary shall ensure that—
(A) the non-Federal interest complies with all design and mitigation commitments made jointly by the Secretary and the non-Federal interest in any environmental document prepared by the non-Federal interest in accordance with this subsection; and
(B) any environmental document prepared by the non-Federal interest is appropriately supplemented under paragraph (2)(B) to address any changes to the water resource project the Secretary determines are necessary.
(4) Adoption and use of documents. Any environmental document prepared in accordance with this subsection may be adopted or used by any Federal agency making any approval to the same extent that the Federal agency could adopt or use a document prepared by another Federal agency under—
(A) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(B) parts 1500 through 1508 of title 40, Code of Federal Regulations (or successor regulations).
(5) Roles and responsibility of lead agency. With respect to the environmental review process for any water resource project, the lead agency shall have authority and responsibility—
(A) to take such actions as are necessary and proper and within the authority and responsibility of the lead agency to facilitate the expeditious resolution of the environmental review process for the water resource project; and
(B) to prepare or ensure that any required environmental impact statement or other environmental review document for a water resource project required to be completed under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) is completed in accordance with this section and applicable Federal law.
(h) Participating and cooperating agencies.
(1) Invitation.
(A) In general. The lead agency shall identify, as early as practicable in the environmental review process for a water resource project, any other Federal or non-Federal agencies that may have an interest in that project and invite those agencies to become participating or cooperating agencies, as applicable, in the environmental review process for the water resource project.
(B) Procedures. Section 1501.6 of title 40, Code of Federal Regulations (as in effect on the date of enactment of the Water Resources Development Act of 2013) shall govern the identification and the participation of a cooperating agency under subparagraph (A).
(C) Deadline. An invitation to participate issued under subparagraph (A) shall set a deadline by which a response to the invitation shall be submitted, which may be extended by the lead agency for good cause.
(2) Federal cooperating agencies. Any Federal agency that is invited by the lead agency to participate in the environmental review process for a water resource project shall be designated as a cooperating agency by the lead agency unless the invited agency informs the lead agency, in writing, by the deadline specified in the invitation that the invited agency—
(A)
(i) has no jurisdiction or authority with respect to the water resource project;
(ii) has no expertise or information relevant to the water resource project; or
(iii) does not have adequate funds to participate in the water resource project; and
(B) does not intend to submit comments on the water resource project.
(3) Effect of designation. Designation as a participating or cooperating agency under this subsection shall not imply that the participating or cooperating agency—
(A) supports a proposed water resource project; or
(B) has any jurisdiction over, or special expertise with respect to evaluation of, the water resource project.
(4) Concurrent reviews. Each cooperating agency shall—
(A) carry out the obligations of that agency under other applicable law concurrently and in conjunction with the required environmental review process, unless doing so would impair the ability of the Federal agency to conduct needed analysis or otherwise carry out those obligations; and
(B) formulate and implement administrative, policy, and procedural mechanisms to enable the agency to ensure completion of the environmental review process in a timely, coordinated, and environmentally responsible manner.
(i) Programmatic compliance.
(1) In general. The Secretary shall issue guidance regarding the use of programmatic approaches to carry out the environmental review process that—
(A) eliminates repetitive discussions of the same issues;
(B) focuses on the actual issues ripe for analyses at each level of review;
(C) establishes a formal process for coordinating with cooperating agencies, including the creation of a list of all data that is needed to carry out an environmental review process; and
(D) complies with—
(i) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and
(ii) all other applicable laws.
(2) Requirements. In carrying out paragraph (1), the Secretary shall—
(A) as the first step in drafting guidance under that paragraph, consult with relevant Federal and State agencies, Indian tribes, and the public on the appropriate use and scope of the programmatic approaches;
(B) emphasize the importance of collaboration among relevant Federal agencies, State agencies, and Indian tribes in undertaking programmatic reviews, especially with respect to including reviews with a broad geographical scope;
(C) ensure that the programmatic reviews—
(i) promote transparency, including of the analyses and data used in the environmental review process, the treatment of any deferred issues raised by Federal, State, or tribal agencies, or the public, and the temporal and special scales to be used to analyze those issues;
(ii) use accurate and timely information in the environmental review process, including—
(I) criteria for determining the general duration of the usefulness of the review; and
(II) the timeline for updating any out-of-date review;
(iii) describe—
(I) the relationship between programmatic analysis and future tiered analysis; and
(II) the role of the public in the creation of future tiered analysis; and
(iv) are available to other relevant Federal and State agencies, Indian tribes, and the public;
(D) allow not fewer than 60 days of public notice and comment on any proposed guidance; and
(E) address any comments received under subparagraph (D).
(j) Coordinated reviews.
(1) Coordination plan.
(A) Establishment.
(i) In general. The lead agency shall, after consultation with and with the concurrence of each cooperating agency for the water resource project and the non-Federal interest or joint lead agency, as applicable, establish a plan for coordinating public and agency participation in, and comment on, the environmental review process for a water resource project or a category of water resource projects.
(ii) Incorporation. The plan established under clause (i) shall be incorporated into the project schedule milestones set under section 905(g)(2) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(g)(2)).
(2) Comment deadlines. The lead agency shall establish the following deadlines for comment during the environmental review process for a water resource project:
(A) Draft environmental impact statements. For comments by Federal and States agencies and the public on a draft environmental impact statement, a period of not more than 60 days after publication in the Federal Register of notice of the date of public availability of the draft environmental impact statement, unless—
(i) a different deadline is established by agreement of the lead agency, the non-Federal interest, as applicable, and all participating and cooperating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(B) Other environmental review processes. For all comment periods established by the lead agency for agency or public comments in the environmental review process of an action within a program under the authority of the lead agency other than for a draft environmental impact statement, a period of not more than 30 days after the date on which the materials on which comment is requested are made available, unless—
(i) a different deadline is established by agreement of the lead agency, the non-Federal interest, and all cooperating agencies; or
(ii) the deadline is extended by the lead agency for good cause.
(3) Deadlines for decisions under other laws. In any case in which a decision under any Federal law relating to a project, including the issuance or denial of a permit or license, is required to be made by the date described in subsection (k)(6)(B)(ii), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives—
(A) as soon as practicable after the 180-day period described in subsection (k)(6)(B)(ii), an initial notice of the failure of the Federal agency to make the decision; and
(B) every 60 days thereafter until such date as all decisions of the Federal agency relating to the project have been made by the Federal agency, an additional notice that describes the number of decisions of the Federal agency that remain outstanding as of the date of the additional notice.
(4) Involvement of the public. Nothing in this subsection reduces any time period provided for public comment in the environmental review process under applicable Federal law (including regulations).
(k) Issue identification and resolution.
(1) Cooperation. The lead agency, the cooperating agencies, and any participating agencies shall work cooperatively in accordance with this section to identify and resolve issues that could delay completion of the environmental review process or result in the denial of any approval required for the water resource project under applicable laws.
(2) Lead agency responsibilities.
(A) In general. The lead agency shall make information available to the cooperating agencies and participating agencies as early as practicable in the environmental review process regarding the environmental and socioeconomic resources located within the water resource project area and the general locations of the alternatives under consideration.
(B) Data sources. The information under subparagraph (A) may be based on existing data sources, including geographic information systems mapping.
(3) Cooperating and participating agency responsibilities. Based on information received from the lead agency, cooperating and participating agencies shall identify, as early as practicable, any issues of concern regarding the potential environmental or socioeconomic impacts of the water resource project, including any issues that could substantially delay or prevent an agency from granting a permit or other approval that is needed for the water resource project.
(4) Interim decision on achieving accelerated decisionmaking.
(A) In general. Not later than 45 days after the close of the public comment period on a draft environmental impact statement, the Secretary may convene a meeting with the non-Federal interest or joint lead agency, as applicable, relevant resource agencies, and relevant Federal and State agencies to establish a schedule of deadlines to complete decisions regarding the water resource project.
(B) Deadlines.
(i) In general. The deadlines referred to in subparagraph (A) shall be those established by the Secretary, in consultation with and with the concurrence of the non-Federal interest or joint lead agency, as applicable, and other relevant Federal and State agencies.
(ii) Factors for consideration. In establishing a schedule, the Secretary shall consider factors such as—
(I) the responsibilities of cooperating agencies under applicable laws;
(II) the resources available to the non-Federal interest, joint lead agency, and other relevant Federal and State agencies, as applicable;
(III) the overall size and complexity of the water resource project;
(IV) the overall schedule for and cost of the water resource project; and
(V) the sensitivity of the natural and historical resources that could be affected by the water resource project.
(iii) Modifications. The Secretary may—
(I) lengthen a schedule under clause (i) for good cause; and
(II) shorten a schedule only with concurrence of the affected non-Federal interest, joint lead agency, or relevant Federal and State agencies, as applicable.
(C) Failure to meet deadline. If the agencies described in subparagraph (A) cannot provide reasonable assurances that the deadlines described in subparagraph (B) will be met, the Secretary may initiate the issue resolution and referral process described under paragraph (5) before the completion of the record of decision.
(5) Accelerated issue resolution and elevation.
(A) Agency issue resolution meeting.
(i) In general. A cooperating agency or non-Federal interest may request an issue resolution meeting to be conducted by the Secretary.
(ii) Action by Secretary. The Secretary shall convene an issue resolution meeting under clause (i) with the relevant cooperating agencies and the non-Federal interest, as applicable, to resolve issues that could—
(I) delay completion of the environmental review process; or
(II) conflict with the ability of a cooperating agency to carry out applicable Federal laws (including regulations).
(iii) Date. A meeting requested under this subparagraph shall be held not later than 21 days after the date on which the Secretary receives the request for the meeting, unless the Secretary determines that there is good cause to extend that deadline.
(iv) Notification. On receipt of a request for a meeting under this subparagraph, the Secretary shall notify all relevant cooperating agencies of the request, including the issue to be resolved and the date for the meeting.
(v) Disputes. If a relevant cooperating agency with jurisdiction over an action, including a permit approval, review, or other statement or opinion required for a water resource project under applicable law determines that the relevant information necessary to resolve the issue has not been obtained and could not have been obtained within a reasonable time, but the Secretary disagrees, the resolution of the dispute shall be forwarded to the heads of the relevant agencies for resolution.
(vi) Convention by lead agency. The Secretary may convene an issue resolution meeting under this subsection at any time, at the discretion of the Secretary, regardless of whether a meeting is requested under clause (i).
(vii) Exception.
(I) In general. The issue resolution and referral process under this subparagraph shall not be initiated if the applicable agency—
(aa) notifies, with a supporting explanation, the lead agency, cooperating agencies, and non-Federal interest, as applicable, that—
(AA) the agency has not received necessary information or approvals from another entity in a manner that affects the ability of the agency to meet any requirements under Federal, tribal, State, or local law;
(BB) significant new information, including from public comments, or circumstances, including a major modification to an aspect of the water resource project, requires additional analysis for the agency to make a decision on the water resource project application; or
(CC) the agency lacks the financial resources to complete the review under the scheduled time frame, including a description of the number of full-time employees required to complete the review, the amount of funding required to complete the review, and a justification as to why there is not enough funding available to complete the review by the deadline; and
(bb) establishes a new deadline for completion of the review.
(II) Inspector General. If the applicable agency makes a certification under subclause (I)(aa)(CC), the Inspector General of the applicable agency shall conduct a financial audit to review that certification and submit a report on that certification within 90 days to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives.
(B) Elevation of issue resolution.
(i) In general. If issue resolution is not achieved by not later than 30 days after the date on which a relevant meeting is held under subparagraph (A), the Secretary shall notify the heads of the relevant cooperating agencies and the non-Federal interest that an issue resolution meeting will be convened.
(ii) Requirements. The Secretary shall identify the issues to be addressed at the meeting and convene the meeting not later than 30 days after the date on which the notice is issued.
(C) Submission of issue resolution.
(i) Submission to Council on Environmental Quality.
(I) In general. If a resolution is not achieved by not later than 30 days after the date on which an issue resolution meeting is held under subparagraph (B), the Secretary shall submit the matter to the Council on Environmental Quality.
(II) Meeting. Not later than 30 days after the date on which the Council on Environmental Quality receives a submission from the Secretary under subclause (I), the Council on Environmental Quality shall hold an issue resolution meeting with the lead agency, the heads of relevant cooperating agencies and the non-Federal interest.
(III) Additional hearings. The Council on Environmental Quality may hold public meetings or hearings to obtain additional views and information that the Council on Environmental Quality determines are necessary, consistent with the time frames described in this paragraph.
(ii) Remedies. Not later than 30 days after the date on which an issue resolution meeting is convened by the Council on Environmental Quality under clause (i)(II), the Secretary shall—
(I) publish findings that explain how the issue was resolved and recommendations (including, where appropriate, a finding that the submission does not support the position of the submitting agency); or
(II) if the resolution of the issue was not achieved, submit to the President for action—
(aa) the submission;
(bb) any views or additional information developed during any additional hearings under clause (i)(III); and
(cc) the recommendation of the Council on Environmental Quality.
(6) Financial penalty provisions.
(A) In general. A Federal jurisdictional agency shall complete any required approval or decision on an expeditious basis using the shortest existing applicable process.
(B) Failure to decide.
(i) In general. If a Federal jurisdictional agency fails to render a decision under any Federal law relating to a water resource project that requires the preparation of an environmental impact statement or environmental assessment, including the issuance or denial of a permit, license, statement, opinion, or other approval by the date described in clause (ii), the amount of funds made available to support the office of the head of the Federal jurisdictional agency shall be reduced by an amount of funding equal to the amounts specified in subclause (I) or (II) and those funds shall be made available to the division of the Federal jurisdictional agency charged with rendering the decision by not later than 1 day after the applicable date under clause (ii), and once each week thereafter until a final decision is rendered, subject to subparagraph (C)—
(I) $20,000 for any water resource project requiring the preparation of an environmental assessment or environmental impact statement; or
(II) $10,000 for any water resource project requiring any type of review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) other than an environmental assessment or environmental impact statement.
(ii) Description of date. The date referred to in clause (i) is the later of—
(I) the date that is 180 days after the date on which an application for the permit, license, or approval is complete; and
(II) the date that is 180 days after the date on which the Federal lead agency issues a decision on the water resource project under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
(C) Limitations.
(i) In general. No transfer of funds under subparagraph (B) relating to an individual water resource project shall exceed, in any fiscal year, an amount equal to 1 percent of the funds made available for the applicable agency office.
(ii) Failure to decide. The total amount transferred in a fiscal year as a result of a failure by an agency to make a decision by an applicable deadline shall not exceed an amount equal to 5 percent of the funds made available for the applicable agency office for that fiscal year.
(iii) Aggregate. Notwithstanding any other provision of law, for each fiscal year, the aggregate amount of financial penalties assessed against each applicable agency office under title II of the Water Resources Development Act of 2013 and any other Federal law as a result of a failure of the agency to make a decision by an applicable deadline for environmental review, including the total amount transferred under this paragraph, shall not exceed an amount equal to 9.5 percent of the funds made available for the agency office for that fiscal year.
(D) No fault of agency.
(i) In general. A transfer of funds under this paragraph shall not be made if the applicable agency described in subparagraph (A) notifies, with a supporting explanation, the lead agency, cooperating agencies, and non-Federal interest, as applicable, that—
(I) the agency has not received necessary information or approvals from another entity in a manner that affects the ability of the agency to meet any requirements under Federal, State, or local law;
(II) significant new information, including from public comments, or circumstances, including a major modification to an aspect of the water resource project, requires additional analysis for the agency to make a decision on the water resource project application; or
(III) the agency lacks the financial resources to complete the review under the scheduled time frame, including a description of the number of full-time employees required to complete the review, the amount of funding required to complete the review, and a justification as to why there is not enough funding available to complete the review by the deadline.
(ii) Lack of financial resources. If the agency provides notice under clause (i)(III), the Inspector General of the agency shall—
(I) conduct a financial audit to review the notice; and
(II) not later than 90 days after the date on which the review described in subclause (I) is completed, submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report on the notice.
(E) Limitation. The Federal agency from which funds are transferred pursuant to this paragraph shall not reprogram funds to the office of the head of the agency, or equivalent office, to reimburse that office for the loss of the funds.
(F) Effect of paragraph. Nothing in this paragraph affects or limits the application of, or obligation to comply with, any Federal, State, local, or tribal law.
(l) Performance measurement. The Secretary shall establish a program to measure and report on progress made toward improving and expediting the planning and environmental review process.
(m) Memorandum of Agreements for Early Coordination.
(1) Sense of Congress. It is the sense of Congress that—
(A) the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process should cooperate with each other, State agencies, and Indian tribes on environmental review and water resource project delivery activities at the earliest practicable time to avoid delays and duplication of effort later in the process, prevent potential conflicts, and ensure that planning and water resource project development decisions reflect environmental values; and
(B) the cooperation referred to in subparagraph (A) should include the development of policies and the designation of staff that advise planning agencies and non-Federal interests of studies or other information foreseeably required for later Federal action and early consultation with appropriate State and local agencies and Indian tribes.
(2) Technical assistance. If requested at any time by a State or non-Federal interest, the Secretary and other Federal agencies with relevant jurisdiction in the environmental review process, shall, to the maximum extent practicable and appropriate, as determined by the agencies, provide technical assistance to the State or non-Federal interest in carrying out early coordination activities.
(3) Memorandum of agency agreement. If requested at any time by a State or non-Federal interest, the lead agency, in consultation with other Federal agencies with relevant jurisdiction in the environmental review process, may establish memoranda of agreement with the non-Federal interest, Indian tribe, State and local governments, and other appropriate entities to carry out the early coordination activities, including providing technical assistance in identifying potential impacts and mitigation issues in an integrated fashion.
(n) Limitations. Nothing in this section preempts, supersedes, amends, modifies, repeals, or interferes with—
(1) any statutory or regulatory requirement, including for seeking, considering, or responding to public comment;
(2) any obligation to comply with the provisions any Federal law, including—
(A) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);
(B) the regulations issued by the Council on Environmental Quality or any other Federal agency to carry out that Act; and
(C) any other Federal environmental law;
(3) the reviewability of any final Federal agency action in a court of the United States or in the court of any State;
(4) any practice of seeking, considering, or responding to public comment; or
(5) any power, jurisdiction, responsibility, duty, or authority that a Federal, State, or local governmental agency, Indian tribe, or non-Federal interest has with respect to carrying out a water resource project or any other provision of law applicable to water resource projects.
(o) Categorical exclusions.
(1) In general. Not later than 180 days after the date of enactment of this subsection, the Secretary shall—
(A) survey the use by the Corps of Engineers of categorical exclusions in water resource projects since 2005;
(B) publish a review of the survey that includes a description of—
(i) the types of actions that were categorically excluded or could be the basis for developing a new categorical exclusion; and
(ii) any requests previously received by the Secretary for new categorical exclusions; and
(C) solicit requests from other Federal agencies and non-Federal interests for new categorical exclusions.
(2) New categorical exclusions. Not later than 1 year after the date of enactment of this subsection, if the Secretary has identified a category of activities that merit establishing a categorical exclusion that did not exist on the day before the date of enactment of this subsection based on the review under paragraph (1), the Secretary shall publish a notice of proposed rulemaking to propose that new categorical exclusion, to the extent that the categorical exclusion meets the criteria for a categorical exclusion under section 1508.4 of title 40, Code of Federal Regulations (or successor regulation).
(p) Review of water resource project acceleration reforms.
(1) In general. The Comptroller General of the United States shall—
(A) assess the reforms carried out under this section; and
(B) not later than 5 years after the date of enactment of this subsection, submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that describes the results of the assessment.
(2) Inspector General report. The Inspector General of the Corps of Engineers shall—
(A) assess the reforms carried out under this section; and
(B) submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate—
(i) not later than 2 years after the date of enactment of this subsection, an initial report of the findings of the Inspector General; and
(ii) not later than 4 years after the date of enactment of this subsection, a final report of the findings.
(q) Authorization. The authority provided by this section expires on the date that is 10 years after the date of enactment of this Act.
SEC. 2034. Feasibility studies. Section 905 of the Water Resources Development Act of 1986 (33 U.S.C. 2282) is amended by adding at the end the following:
(g) Detailed project schedule.
(1) In general. Not later than 180 days after the date of enactment of this subsection, the Secretary shall determine a set of milestones needed for the completion of a feasibility study under this subsection, including all major actions, report submissions and responses, reviews, and comment periods.
(2) Detailed project schedule milestones. Each District Engineer shall, to the maximum extent practicable, establish a detailed project schedule, based on full funding capability, that lists all deadlines for milestones relating to feasibility studies in the District developed by the Secretary under paragraph (1).
(3) Non-Federal interest notification. Each District Engineer shall submit by certified mail the detailed project schedule under paragraph (2) to each relevant non-Federal interest—
(A) for projects that have received funding from the General Investigations Account of the Corps of Engineers in the period beginning on October 1, 2009, and ending on the date of enactment of this section, not later than 180 days after the establishment of milestones under paragraph (1); and
(B) for projects for which a feasibility cost-sharing agreement is executed after the establishment of milestones under paragraph (1), not later than 90 days after the date on which the agreement is executed.
(4) Congressional and public notification. Beginning in the first full fiscal year after the date of enactment of this Act, the Secretary shall—
(A) submit an annual report that lists all detailed project schedules under paragraph (2) and an explanation of any missed deadlines to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives; and
(B) make publicly available, including on the Internet, a copy of the annual report described in subparagraph (A) not later than 14 days after date on which a report is submitted to Congress.
(5) Failure to Act. If a District Engineer fails to meet any of the deadlines in the project schedule under paragraph (2), the District Engineer shall—
(A) not later than 30 days after each missed deadline, submit to the non-Federal interest a report detailing—
(i) why the District Engineer failed to meet the deadline; and
(ii) a revised project schedule reflecting amended deadlines for the feasibility study; and
(B) not later than 30 days after each missed deadline, make publicly available, including on the Internet, a copy of the amended project schedule described in subparagraph (A)(ii).