Stop the Asian Carp Now Act of 2017
A bill to direct the Secretary of the Army, acting through the Chief of Engineers, to release an interim report related to aquatic nuisance species control, and for other purposes.
Introduced
Jun 21, 2017
Committee
Next step
Passed Senate
Passed House
To President
Became law
Official Summary (Congressional Research Service)
Introduced in Senate · Jun 21, 2017
Stop the Asian Carp Now Act of 2017
This bill directs the U.S. Army Corps of Engineers to release for public comment the Great Lakes and Mississippi River Interbasin Study - Brandon Road interim report that was scheduled for release on February 27, 2017. (The interim report is a feasibility study that assesses the viability of establishing a single point to control the upstream transfer of aquatic nuisance species from the Mississippi River Basin into the Great Lakes Basin in the vicinity of the Brandon Road Lock and Dam in Joliet, Illinois.)