(a)
Establishment.
Not later than 1 year after the date of enactment of this section, the Secretary of Energy shall establish a program to provide grants to electric utilities to carry out eligible activities.
¶
(1)
Application.
To apply for a grant provided under this section, an electric utility shall submit to the Secretary of Energy an application at such time, in such manner, and containing such information as the Secretary of Energy may require.
¶
(A)
on a competitive basis; and
¶
(B)
to geographically diverse electric utilities.
¶
(3)
Priority.
The Secretary of Energy shall prioritize providing a grant under this section to an electric utility that sells electricity in an area that has a history of extreme weather events.
¶
(c)
Sunset.
The program established under subsection (a) shall terminate on the date that is 5 years after the date of enactment of this Act.
¶
(1)
Electric utility.
The term electric utility has the meaning given such term in section 3(22) of the Federal Power Act (16 U.S.C. 796(22)).
¶
(i)
is designed to improve the performance or efficiency of a power line;
¶
(ii)
makes a power line more resilient to an extreme weather event; or
¶
(iii)
otherwise ensures that an end-user has access to electricity during an extreme weather event.
¶
(i)
burying a power line;
¶
(ii)
hardening a power line; and
¶
(iii)
if burying a power line is not feasible, providing a generator to a household that is located in a remote area.
¶
(3)
Extreme weather event.
The term extreme weather event means an historically rare or severe natural disaster, including a heat wave, drought, flood, tornado, and hurricane.
¶