Bureau of Reclamation Pumped Storage Hydropower Development Act
A bill to amend the Reclamation Project Act of 1939 to authorize pumped storage hydropower development utilizing multiple Bureau of Reclamation reservoirs.
Introduced
Jun 5, 2019
Committee
Oct 23, 2019
Passed Senate
Next step
Passed House
To President
Became law
+0 sections added
−0 removed
~1 modified
=2 unchanged
+21 words ·
−1 words
SEC. 2. Authority for pumped storage hydropower development using multiple Bureau of Reclamation reservoirs Modified
SEC. 2. Authority for pumped storage hydropower development using multiple Bureau of Reclamation reservoirs. Section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)) is amended—
(1) in paragraph (1), in the fourth sentence, by striking “, including small conduit hydropower development” and inserting “and reserve to the Secretary the exclusive authority to develop small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs”; and
(2) in paragraph (8), by striking “has been filed with the Federal Energy Regulatory Commission as of August 9, 2013” 2013 as of the date of the enactment of the Bureau of Reclamation Small Conduit Hydropower Development and Rural Jobs Act” and inserting “was filed with the Federal Energy Regulatory Commission before August 9, 2013, and is still pending”.