S. 1790 116th Congress Became law Public Law 116-92
Congress.gov ↗

National Defense Authorization Act for Fiscal Year 2020

An original bill to authorize appropriations for fiscal year 2020 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes.

Introduced Jun 11, 2019
Committee Jun 11, 2019
Passed Senate Jun 27, 2019
Passed House Sep 17, 2019
To President Dec 19, 2019
Became law Dec 20, 2019
This is a large bill (1,102 sections). Showing the first 40 sections for fast reading — click any section in the table of contents to open it, or load the full bill. Load all 1102 sections

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

National Defense Authorization Act for Fiscal Year 2020.
SECTION 1. SHORT TITLE.. This Act may be cited as the “National Defense Authorization Act for Fiscal Year 2020”.
SEC. 2. ORGANIZATION OF ACT INTO DIVISIONS; TABLE OF CONTENTS..
(a) Divisions.—. This Act is organized into four divisions as follows:
(1) Division A—Department of Defense Authorizations.
(2) Division B—Military Construction Authorizations.
(3) Division C—Department of Energy National Security Authorizations and Other Authorizations.
(4) Division D—Funding Tables.
(5) Division E—Intelligence Authorizations for Fiscal Years 2018, 2019, and 2020.
(6) Division F—Other Matters.
(b) Table of Contents.—. The table of contents for this Act is as follows:
SEC. 3. CONGRESSIONAL DEFENSE COMMITTEES.. Definition.10 USC 101 note. In this Act, the term “congressional defense committees” has the meaning given that term in section 101(a)(16) of title 10, United States Code.133 STAT. 1232
SEC. 4. BUDGETARY EFFECTS OF THIS ACT.. The budgetary effects of this Act, for the purposes of complying with the Statutory Pay-As-You-Go Act of 2010, shall be determined by reference to the latest statement titled “Budgetary Effects of PAYGO Legislation” for this Act, jointly submitted for printing in the Congressional Record by the Chairmen of the House and Senate Budget Committees, provided that such statement has been submitted prior to the vote on passage in the House acting first on the conference report or amendment between the Houses.
DIVISION A — DEPARTMENT OF DEFENSE AUTHORIZATIONS
TITLE I — PROCUREMENT
Subtitle A — Authorization Of Appropriations
SEC. 101. AUTHORIZATION OF APPROPRIATIONS.. Funds are hereby authorized to be appropriated for fiscal year 2020 for procurement for the Army, the Navy and the Marine Corps, the Air Force, and Defense-wide activities, as specified in the funding table in section 4101.
Subtitle B — Army Programs
SEC. 111. AUTHORITY OF THE SECRETARY OF THE ARMY TO WAIVE CERTAIN LIMITATIONS RELATED TO THE DISTRIBUTED COMMON GROUND SYSTEM-ARMY INCREMENT 1.. Section 113(d) of the National Defense Authorization Act for Fiscal Year 2017 (Public Law 114–328; 130 Stat. 2028) is amended by striking “Secretary of Defense” both places it appears and inserting “Secretary of the Army”.
Subtitle C — Navy Programs
SEC. 121. FORD-CLASS AIRCRAFT CARRIER COST LIMITATION BASELINES..
(a) In General.—. Chapter 863 of title 10, United States Code, is amended by adding at the end the following new section:
“§ 8692. 10 USC 8692. Ford-class aircraft carriers: cost limitation baselines.
“(a) Limitation.—. The total amounts obligated or expended from funds authorized to be appropriated or otherwise made available for Shipbuilding and Conversion, Navy, or for any other procurement account, may not exceed the following amounts for the following aircraft carriers:
“(1) $13,224,000,000 for the construction of the aircraft carrier designated CVN–78.
“(2) $11,398,000,000 for the construction of the aircraft carrier designated CVN–79.
“(3) $12,202,000,000 for the construction of the aircraft carrier designated CVN–80.
“(4) $12,451,000,000 for the construction of the aircraft carrier designated CVN–81.
“(b) Exclusion of Battle and Interim Spares From Cost Limitation.—. The Secretary of the Navy shall exclude from the 133 STAT. 1234 determination of the amounts set forth in subsection (a) the costs of the following items:
“(1) CVN–78 class battle spares.
“(2) Interim spares.
“(3) Increases attributable to economic inflation after December 1, 2018, not otherwise included in the amounts listed in subsection (a).
“(c) Written Notice and Briefing on Change in Amount.—. The SecretaryTime period. of the Navy may adjust an amount listed in subsection (a) not fewer than 15 days after submitting written notice and providing a briefing to the congressional defense committees, each of which shall include the amount and rationale of any change and the resulting amount after such change.”
(b) Clerical Amendment.—. The table of sections at the beginning of chapter 863 of such title10 USC 8661 prec. is amended by inserting after the item relating to section 8691 the following new item:
(c) Repeal of Superseded Provision.—. Section 122 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109–364; 120 Stat. 2104) is repealed.
SEC. 122. MODIFICATION OF ANNUAL REPORT ON COST TARGETS FOR CERTAIN AIRCRAFT CARRIERS.. Section 126(c) of the National Defense Authorization Act for Fiscal Year 2017 (Public Law 114–328; 130 Stat. 2035) is amended—
(1) in the subsection heading, by striking “and CVN–80” and inserting “, CVN–80, and CVN–81”;
(2) in paragraph (1)—
(A) by striking “2021” and inserting “2032”; and
(B) by striking “costs described in subsection (b) for the CVN–79 and CVN–80” and inserting “cost targets for the CVN–79, the CVN–80, and the CVN–81”; and
(3) in paragraph (2)—
(A) in the matter preceding subparagraph (A), by striking “and the CVN–80” and inserting “, the CVN–80, and the CVN–81”
(B) in subparagraph (A), by striking “costs described in subsection (b)” and inserting “cost targets”;
(C) in subparagraph (F), by striking “costs specified in subsection (b)” and inserting “cost targets”; and
(D) in subparagraph (G), by striking “costs specified in subsection (b)” and inserting “cost targets”.
SEC. 123. REFUELING AND COMPLEX OVERHAULS OF THE U.S.S. JOHN C. STENNIS AND U.S.S. HARRY S. TRUMAN..
(a) Refueling and Complex Overhaul.—. The Secretary of the Navy shall carry out the nuclear refueling and complex overhaul of the U.S.S. John C. Stennis (CVN–74) and U.S.S. Harry S. Truman (CVN–75).
(b) Use of Incremental Funding.—. Time period. With respect to any contract entered into under subsection (a) for the nuclear refueling and complex overhauls of the U.S.S. John C. Stennis (CVN–74) and U.S.S. Harry S. Truman (CVN–75), the Secretary may use incremental funding for a period not to exceed six years after advance procurement funds for such nuclear refueling and complex overhaul effort are first obligated.133 STAT. 1235
(c) Condition for Out-year Contract Payments.—. Any contract entered into under subsection (a) shall provide that any obligation of the United States to make a payment under the contract for a fiscal year after fiscal year 2020 is subject to the availability of appropriations for that purpose for that later fiscal year.
SEC. 124. FORD CLASS AIRCRAFT CARRIER SUPPORT FOR F–35C AIRCRAFT.. Before completing the post-shakedown availability of the Ford class aircraft carrier designated CVN–79, the Secretary of the Navy shall ensure that the aircraft carrier is capable of operating and deploying with the F–35C aircraft.
SEC. 125. PROHIBITION ON USE OF FUNDS FOR REDUCTION OF AIRCRAFT CARRIER FORCE STRUCTURE.. None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for the Department of Defense may be obligated or expended to reduce the number of operational aircraft carriers of the Navy below the number specified in section 8062(b) of title 10, United States Code.
SEC. 126. MODIFICATION OF PROHIBITION ON AVAILABILITY OF FUNDS FOR NAVY WATERBORNE SECURITY BARRIERS.. Section 130 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115–232)132 Stat. 1665. is amended—
(1) in subsection (a) by striking “for fiscal year 2019 may be obligated or expended to procure legacy waterborne security barriers for Navy ports” and inserting “for fiscal year 2019 or fiscal year 2020 may be obligated or expended to procure legacy waterborne security barriers for Navy ports, including as replacements for legacy barriers”;
(2) in subsection (c)(1), by inserting “of not more than 30 percent” after “replacement”; and
(3) by adding at the end the following new subsection:
“(d) Notification.—. Deadline. Not later than 15 days after an exception is made pursuant to subsection (c)(2), the Secretary of the Navy shall submit a written notification to the congressional defense committees that includes—
“(1) the name and position of the government official who determined exigent circumstances exist;
“(2) a description of the exigent circumstances; and
“(3) a description of how waterborne security will be maintained until new waterborne security barriers are procured and installed.”
SEC. 127. LHA REPLACEMENT AMPHIBIOUS ASSAULT SHIP PROGRAM..
(a) Authority to Use Incremental Funding.—. The Secretary of the Navy may enter into and incrementally fund a contract for detail design and construction of the LHA replacement ship designated LHA 9 and, subject to subsection (b), funds for payments under the contract may be provided from amounts authorized to be appropriated for the Department of Defense for Shipbuilding and Conversion, Navy, for fiscal years 2019 through 2025.
(b) Condition for Out-year Contract Payments.—. A contract entered into under subsection (a) shall provide that any obligation of the United States to make a payment under the contract for any subsequent fiscal year is subject to the availability of appropriations for that purpose for such subsequent fiscal year.133 STAT. 1236
(c) Repeal of Obsolete Authority.—. Section 125 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109–364; 120 Stat. 2106) is repealed.
SEC. 128. STRATEGIC SEALIFT FLEET VESSEL..
(a) In General.—. Contracts. Subject to the availability of appropriations, the Secretary of the Navy shall seek to enter into a contract for the construction of one sealift vessel.
(b) Delivery Date.—. Deadline. The contract entered into under subsection (a) shall specify a delivery date for the sealift vessel of not later than September 30, 2026.
(c) Design and Construction Requirements.—.
(1) Use of existing design.—. The design of the sealift vessel shall be based on a domestic or foreign design that exists as of the date of the enactment of this Act.
(2) Commercial standards and practices.—. Subject to paragraph (1), the sealift vessel may be constructed using commercial design standards and commercial construction practices that are consistent with the best interests of the Federal Government.
(3) Domestic shipyard.—. The sealift vessel shall be constructed in a shipyard that is located in the United States.
(d) Certificate and Endorsement.—. The sealift vessel shall meet the requirements necessary to receive a certificate of documentation and a coastwise endorsement under chapter 121 of tile 46, United States Code, and the Secretary of the Navy shall ensure that the completed vessel receives such a certificate and endorsement.
(e) Executive Agent.—.
(1) In general.—. Contracts. The Secretary of the Navy may seek to enter into a contract or other agreement with a private-sector entity under which the entity may act as executive agent for the Secretary for purposes of the contract under subsection (a).
(2) Responsibilities.—. The executive agent described in paragraph (1) may be responsible for—
(A) selecting a shipyard for the construction of the sealift vessel;
(B) managing and overseeing the construction of the sealift vessel; and
(C) such other matters as the Secretary of the Navy determines to be appropriate
(f) Use of Incremental Funding.—. With respect to the contract entered into under subsection (a), the Secretary of the Navy may use incremental funding to make payments under the contract.
(g) Sealift Vessel Defined.—. In this section, the term “sealift vessel” means the sealift vessel constructed pursuant to the contract entered into under subsection (a).
SEC. 129. DESIGN AND CONSTRUCTION OF AMPHIBIOUS TRANSPORT DOCK DESIGNATED LPD–31..
(a) In General.—. Contracts.Effective date. Using funds authorized to be appropriated for the Department of Defense for Shipbuilding and Conversion, Navy, the Secretary of the Navy may enter into a contract, beginning with the fiscal year 2020 program year, for the design and construction of the amphibious transport dock designated LPD–31.133 STAT. 1237
(b) Use of Incremental Funding.—. With respect to the contract entered into under subsection (a), the Secretary may use incremental funding to make payments under the contract.
(c) Condition for Out-year Contract Payments.—. The contract entered into under subsection (a) shall provide that any obligation of the United States to make a payment under such contract for any fiscal year after fiscal year 2020 is subject to the availability of appropriations for that purpose for such later fiscal year.
SEC. 130. LIMITATION ON AVAILABILITY OF FUNDS FOR THE LITTORAL COMBAT SHIP..
(a) Limitations.—. None of the funds authorized to be appropriated by this Act for fiscal year 2020 for the Department of Defense may be used to exceed, and the Department may not otherwise exceed, the total procurement quantity of thirty-five Littoral Combat Ships, unless the Under Secretary of Defense for Acquisition and Sustainment submits to the congressional defense committees the certification described in subsection (b).
(b) Certification.—. The certification described in this subsection is a certification by the Under Secretary that awarding a contract for the procurement of a Littoral Combat Ship that exceeds the total procurement quantity listed in revision five of the Littoral Combat Ship acquisition strategy—
(1) is in the national security interests of the United States;
(2) will not result in exceeding the low-rate initial production quantity approved in the Littoral Combat Ship acquisition strategy in effect as of the date of the certification; and
(3) is necessary to maintain a full and open competition for the Guided Missile Frigate (FFG(X)) with a single source award in fiscal year 2020.
SEC. 131. LIMITATION ON THE NEXT NEW CLASS OF NAVY LARGE SURFACE COMBATANTS..
(a) In General.—. Milestone B approval may not be granted for the next new class of Navy large surface combatants unless the class of Navy large surface combatants incorporates prior to such approval—
(1) design changes identified during the full duration of the combat system ship qualification trials and operational test periods of the first Arleigh Burke-class destroyer in the Flight III configuration to complete such events; and
(2) final results of test programs of engineering development models or prototypes for critical systems specified by the Senior Technical Authority pursuant to section 8669b of title 10, United States Code, as added by section 1034 of this Act, in their final form, fit, and function and in a realistic environment, which shall include a land-based engineering site for the propulsion system.
(b) Limitation.—. Notification. The Secretary of the Navy may not release a detail design or construction request for proposals or obligate funds from the Shipbuilding and Conversion, Navy account for the next new class of Navy large surface combatants until the class of Navy large surface combatants receives Milestone B approval and the milestone decision authority notifies the congressional defense committees, in writing, of the actions taken to comply with the requirements under subsection (a).
(c) Definitions.—. In this section:133 STAT. 1238
(1) The term “Milestone B approval” has the meaning given the term in section 2366(e)(7) of title 10, United States Code.
(2) The term “milestone decision authority” means the official within the Department of Defense designated with the overall responsibility and authority for acquisition decisions for the program, including authority to approve entry of the program into the next phase of the acquisition process.
(3) The term “large surface combatants” means Navy surface ships that are designed primarily to engage in attacks against airborne, surface, subsurface, and shore targets, excluding frigates and littoral combat ships.
SEC. 132. LIMITATION ON AVAILABILITY OF FUNDS PENDING QUARTERLY UPDATES ON THE CH–53K KING STALLION HELICOPTER PROGRAM..
(a) Limitation.—. Time period. Of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for aircraft procurement, Navy, for the CH–53K King Stallion helicopter program, not more than 50 percent may be obligated or expended until a period of 30 days has elapsed following the date on which the Secretary of the Navy provides the first briefing required under subsection (b).
(b) Quarterly Briefings Required.—.
(1) In general.—. Deadline. Beginning not later than 30 days after the date of the enactment of this Act, and on a quarterly basis thereafter through the end of fiscal year 2022, the Secretary of the Navy shall provide to the Committees on Armed Services of the Senate and the House of Representatives a briefing on the progress of the CH–53K King Stallion helicopter program.
(2) Elements.—. Each briefing under paragraph (1) shall include, with respect to the CH–53K King Stallion helicopter program, the following:
(A) An overview of the program schedule.
(B) A statement of the total cost of the program as of the date of the briefing, including the costs of development, testing, and production.
(C) A comparison of the total cost of the program relative to the approved acquisition program baseline.
(D) Assessment. An assessment of flight testing under the program, including identification of the number of test events that have been conducted on-time in accordance with the joint integrated program schedule.
(E) Update. An update on the correction of technical deficiencies under the program, including—
(i) identification of the technical deficiencies that have been corrected as of the date of the briefing;
(ii) identification of the technical deficiencies that have been discovered, but not corrected, as of such date;
(iii) Estimate. an estimate of the total cost of correcting technical deficiencies under the program; and
(iv) an explanation of any significant deviations from the testing and program schedule that are anticipated due to the discovery and correction of technical deficiencies.133 STAT. 1239
SEC. 133. LIMITATION ON AVAILABILITY OF FUNDS FOR VH–92A HELICOPTER..
(a) Limitation.—. Of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for procurement for the VH–92A helicopter, not more than 80 percent may be obligated or expended until the date on which the Secretary of Navy submits to the Committees on Armed Services of the Senate and the House of Representatives the report required under subsection (b).
(b) Report Required.—. Assessments. The Secretary of the Navy shall submit to the Committees on Armed Services of the Senate and the House of Representatives a report assessing the status of the VH–92A helicopter program industrial base and the potential impact of proposed manufacturing base changes on the acquisition program. The reportEstimates. shall include a description of—
(1) estimated effects on the manufacturing readiness level of the VH–92 program due to potential changes to the program manufacturing base;
(2) the estimated costs and assessment of cost risk to the program due to potential changes to the program manufacturing base;
(3) any estimated schedule impacts, including impacts on delivery dates for the remaining low-rate initial production lots and full rate production, resulting from any changes to the manufacturing base;
(4) an assessment of the effect of changes to the manufacturing base on VH–92A sustainment; and
(5) the impact of such changes on production and sustainment capacity for the MH–60 and CH–53K helicopters of the Navy.
SEC. 134. REPORT ON CARRIER WING AND AVIATION COMBAT ELEMENT COMPOSITION..
(a) In General.—. Not later than May 1, 2020, the Secretary of the Navy shall submit to the congressional defense committees a report on the optimal composition of the carrier air wing (CVW) on aircraft carriers and aviation combat element (ACE) embarked on amphibious ships in 2030 and 2040, including alternative force design concepts.
(b) Elements.—. Analyses. The report required under subsection (a) shall include the following elements for the CVW and ACE:
(1) Analysis and justification for the Department of the Navy’s stated goal of a 50/50 mix of 4th and 5th generation aircraft for 2030.
(2) Analysis and justification for an optimal mix of aircraft for 2040.
(3) Plan. A plan for incorporating unmanned aerial vehicles and associated communication capabilities to effectively implement the future force design.
(4) Analysis of the support equipment requirement for each aircraft type and the space needed to accommodate such equipment.
(5) A description of existing and potential ship designs or design changes that would enable greater commonality and interoperability of embarked naval aircraft, including aircraft arresting gear and launch catapults.133 STAT. 1240
(c) Briefing.—. Deadline. Not later than March 1, 2020, the Secretary of the Navy shall provide the congressional defense committees a briefing on the report required under subsection (a).
Subtitle D — Air Force Programs
SEC. 141. MODIFICATION OF REQUIREMENT TO PRESERVE CERTAIN C–5 AIRCRAFT.. Section 141(d) of the National Defense Authorization Act for Fiscal Year 2013 (Public Law 112–239; 126 Stat. 1661) is amended—
(1) in paragraph (1), by striking “until the date that is 30 days after the date on which the briefing under section 144(b) of the National Defense Authorization Act for Fiscal Year 2018 is provided to the congressional defense committees” and inserting “until the date that is 30 days after the date on which the final report and briefing required under section 1712(c)(2) of the National Defense Authorization Act for Fiscal Year 2020 have each been provided to the congressional defense committees”; and
(2) in paragraph (2)(A), by striking “can be returned to service” and inserting “is inducted into or maintained in type 1000 recallable storage”.
SEC. 142. OC–135B AIRCRAFT RECAPITALIZATION PROGRAM.. The Secretary of the Air Force shall ensure that any request for proposals for the procurement of an OC–135B aircraft under a recapitalization program for such aircraft meets the requirements for full and open competition as set forth in section 2304 of title 10, United States Code, and includes, as part of such request for proposals, consideration of proposals for the provision of new production aircraft and recently manufactured aircraft.
SEC. 143. REQUIREMENT TO ALIGN AIR FORCE AVIATION FORCE STRUCTURE WITH NATIONAL DEFENSE STRATEGY..
(a) Required Submission of Strategy.—. Deadline. Not later than March 1, 2020, the Secretary of the Air Force shall submit to the congressional defense committees an aviation force structure acquisition strategy that aligns with the stated capability and capacity requirements of the Department of the Air Force to meet the National Defense Strategy.
(b) Alignment With Strategy.—. Waivers. The Secretary of the Air Force may not deviate from the strategy submitted under subsection (a) until—
(1) Consultation. the Secretary receives a waiver from the Secretary of Defense, in consultation with the Chairman of the Joint Chiefs of Staff; and
(2) Documentation. the Secretary of Defense provides the congressional defense committees with the waiver approval documentation.
SEC. 144. PROHIBITION ON AVAILABILITY OF FUNDS FOR REDUCTION IN KC–10 PRIMARY MISSION AIRCRAFT INVENTORY.. None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for the Air Force may be obligated or expended to reduce the number of KC–10 aircraft in the primary mission aircraft inventory of the Air Force.133 STAT. 1241
SEC. 145. LIMITATION ON AVAILABILITY OF FUNDS FOR F–15EX AIRCRAFT..
(a) Limitation.—. Time period.Reports.Strategies. Except as provided in subsection (b), none of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for the Air Force may be obligated or expended to procure any F–15EX aircraft, other than the first two prototypes of such aircraft, until a period of 15 days has elapsed following the date on which the Secretary of the Air Force submits to the congressional defense committees a report on the following topics relating to the F–15EX program:
(1) Acquisition strategy.
(2) Estimates. Cost and schedule estimates.
(3) Test and evaluation strategy.
(4) Logistics strategy.
(5) Post-production fielding strategy.
(b) Exception for Long-lead Items.—.
(1) In general.—. Notwithstanding subsection (a), the Secretary of the Air Force may use the funds described in paragraph (2) to procure long-lead items for up to six additional F–15EX aircraft beyond the first two prototypes of such aircraft.
(2) Funds described.—. The funds described in this paragraph are funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for the Air Force for any of the following:
(A) Research and development, nonrecurring engineering.
(B) Aircraft procurement.
(c) F–15EX Program Defined.—. In this section, the term “F–15EX program” means the F–15EX aircraft program of the Air Force as described in the materials submitted to Congress by the Secretary of Defense in support of the budget of the President for fiscal year 2020 (as submitted to Congress under section 1105(a) of title 21, United States Code).
SEC. 146. LIMITATION ON AVAILABILITY OF FUNDS FOR VC–25B AIRCRAFT..
(a) Limitation.—. Time period.Notification. Except as provided in subsection (b), none of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 or any subsequent fiscal year for the Air Force may be obligated or expended to carry out over and above work on the VC–25B aircraft until a period of 30 days has elapsed following the date on which the Secretary of the Air Force notifies the congressional defense committees of the intent of the Secretary to authorize such work.
(b) Exception.—. The limitation under subsection (a) shall not apply to over and above work carried out—
(1) to repair or replace items damaged during the testing of the VC–25B aircraft; or
(2) to make changes necessary to meet operational requirements.
(c) Definitions.—. In this section:
(1) The term “operational requirements” means any of the operational requirements for the VC–25B aircraft described in the capability development document or the system requirements document for the Presidential Aircraft Recapitalization Program.133 STAT. 1242
(2) The term “over and above work” means work performed pursuant to line 0012 (CLIN 0012) of the contract for Presidential Aircraft Recapitalization entered into between the Department of the Air Force and the Boeing Company (contract number FA8625–16–C–6599).
SEC. 147. LIMITATION ON AVAILABILITY OF FUNDS FOR RC–26B AIRCRAFT..
(a) Limitation.—. Except as provided in subsection (b), none of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for the Air Force may be obligated or expended to retire, divest, realign, or place in storage or on backup aircraft inventory status, or prepare to retire, divest, realign, or place in storage or backup inventory status, any RC–26B aircraft until the date on which the Secretary of the Air Force submits to the congressional defense committees—
(1) the report required under subsection (c); and
(2) the certification required under subsection (d).
(b) Exception.—. Determination. The limitation in subsection (a) shall not apply to individual RC–26B aircraft that the Secretary of the Air Force determines, on a case-by-case basis, to be no longer mission capable because of mishaps or other damage.
(c) Report Required.—. Not later than 90 days after the date of the enactment of this Act, the Secretary of the Air Force shall submit to the congressional defense committees a report that includes the following:
(1) Survey. A survey of any requirements for the Air Force to provide intelligence, surveillance, and reconnaissance support to other military forces and civil authorities that the Air Force and the Air National Guard meet using the RC–26B aircraft.
(2) Assessment. An assessment of the extent to which such requirements are appropriate for the Air Force to fulfill.
(3) The manner in which the Secretary would meet such requirements if the RC–26B aircraft were to be retired.
(4) A comparison of costs and effectiveness of alternative means of providing intelligence, surveillance, and reconnaissance support to other military forces and civil authorities.
(5) Assessment. An assessment of the utility of entering into one or more memoranda of agreement with other military forces and civil authorities to govern the process for providing intelligence, surveillance, and reconnaissance support to those forces and authorities.
(d) Certification Required.—. Deadline. Not later than 60 days after the date on which the Secretary of the Air Force submits the report required under subsection (c), the Secretary shall certify to the congressional defense committees—
(1) whether there are requirements for the Air Force to provide intelligence, surveillance, and reconnaissance support to other military forces and civil authorities that the Air Force meets using the RC–26B aircraft; and
(2) whether the Secretary has identified methods of meeting such requirements that are more effective and more efficient than meeting such requirements through the use of the RC–26B aircraft.133 STAT. 1243
SEC. 148. LIMITATION ON AVAILABILITY OF FUNDS FOR RETIREMENT OF RC–135 AIRCRAFT..
(a) Limitation.—. Time period.Certification. Except as provided in subsection (b), none of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for the Air Force may be obligated or expended to retire, or prepare to retire, any RC–135 aircraft until a period of 60 days has elapsed following the date on which the Secretary of Defense certifies to the congressional defense committees that—
(1) technologies other than the RC–135 aircraft provide capacity and capabilities equivalent to the capacity and capabilities of the RC–135 aircraft; and
(2) the capacity and capabilities of such other technologies meet the requirements of combatant commanders with respect to indications and warning, intelligence preparation of the operational environment, and direct support for kinetic and nonkinetic operations.
(b) Exception.—. Determination. The limitation in subsection (a) shall not apply to individual RC–135 aircraft that the Secretary of the Air Force determines, on a case-by-case basis, to be no longer mission capable because of mishaps, other damage, or being uneconomical to repair.
SEC. 149. AIR FORCE AGGRESSOR SQUADRON MODERNIZATION..
(a) Sense of Congress.—. It is the sense of Congress that—
(1) it is critical that the Air Force has the capability to train against an advanced air adversary in order to be prepared for conflicts against a modern enemy force, and that in order to have this capability, the Air Force must have access to an advanced adversary force prior to United States adversaries fielding a 5th-generation operational capability; and
(2) the Air Force’s plan to use low-rate initial production F–35As as aggressor aircraft reflects a recognition of the need to field a modernized aggressor fleet.
(b) Report.—.
(1) In general.—. Plan. The Secretary of the Air Force may not transfer any low-rate initial production F–35 aircraft for use as aggressor aircraft until the Chief of Staff of the Air Force submits to the congressional defense committees a comprehensive plan and report on the strategy for modernizing its organic aggressor fleet.
(2) Elements.—. Analyses. The report required under paragraph (1) shall include the following elements:
(A) Potential locations for F–35A aggressor aircraft, including an analysis of installations that—
(i) have the size and availability of airspace necessary to meet flying operations requirements;
(ii) have sufficient capacity and availability of range space;
(iii) are capable of hosting advanced-threat training exercises; and
(iv) meet or require minimal addition to the environmental requirements associated with the basing action.
(B) An analysis of the potential cost and benefits of expanding aggressor squadrons currently operating 18 Primary Assigned Aircraft (PAA) to a level of 24 PAA each.133 STAT. 1244
(C) An analysis of the cost and timelines associated with modernizing the current Air Force aggressor squadrons to include upgrading aircraft radar, infrared search-and-track systems, radar warning receiver, tactical datalink, threat-representative jamming pods, and other upgrades necessary to provide a realistic advanced adversary threat.
SEC. 150. AIR FORCE PLAN FOR COMBAT RESCUE HELICOPTER FIELDING..
(a) Sense of Congress.—. It is the sense of Congress that, given delays to Operational Loss Replacement (OLR) program fielding and the on-time fielding of Combat Rescue Helicopter (CRH), the Air National Guard should retain additional HH–60G helicopters at Air National Guard locations to meet their recommended primary aircraft authorized (PAA) per the Air Force’s June 2018 report on Air National Guard HH–60 requirements.
(b) Report on Fielding Plan.—.
(1) In general.—. Not later than 45 days after the date of the enactment of this Act, the Secretary of the Air Force shall submit to the congressional defense committees a report on its fielding plan for the CRH program.
(2) Elements.—. The report required under paragraph (1) shall include the following elements:
(A) A description of the differences in capabilities between the HH–60G, OLR, and CRH helicopters.
(B) A description of the costs and risks associated with changing the CRH fielding plan to reduce or eliminate inventory shortfalls.
(C) A description of the measures for accelerating the program available within the current contract.
(D) A description of the operational risks and benefits associated with fielding the CRH to the active component first, including—
(i) how the differing fielding plan may affect deployment schedules;
(ii) what capabilities active-component units deploying with the CRH will have that reserve component units deploying with OLR will not; and
(iii) Analysis. an analysis of the potential costs and benefits that could result from accelerating CRH fielding to all units through additional funding in the future years defense program.
(c) Report on Training Plan.—.
(1) In general.—. Not later than 45 days after the date of the enactment of this Act, the Secretary of the Air Force shall submit to the congressional defense committees a report on the plan to sustain training for initial-entry reserve component HH–60G pilots once the active component of the Air Force has received all of its CRH helicopters.
(2) Elements.—. The report required under paragraph (1) shall include the following elements:
(A) Projected reserve component aircrew initial HH–60G/OLR qualification training requirements, by year.
(B) The number of legacy HH–60G/OLR helicopters required to continue providing initial HH–60G qualification 133 STAT. 1245 training through the 150th Special Operations Wing at Kirtland Air Force Base.
(C) The number of personnel required to continue providing initial HH–60G/OLR qualification training through the 150th Special Operations Wing at Kirtland Air Force Base.
(D) The number of flying hours required per pilot to perform “differences training” at home station for initial entry HH–60 pilots receiving CRH training at Kirtland Air Force Base to become qualified in the HH–60G/OLR at their home station.
(E) The projected effect of using local flying training hours at reserve component units on overall unit training readiness and ability to meet Ready Aircrew Program requirements.
SEC. 151. REPORT ON FEASIBILITY OF MULTIYEAR CONTRACT FOR PROCUREMENT OF JASSM–ER MISSILES..
(a) In General.—. Not later than March 31, 2020, the Secretary of the Air Force shall submit a report to the congressional defense committees assessing the feasibility of entering into a multiyear contract for procurement of JASSM–ER missiles starting in fiscal year 2022.
(b) Elements.—. Assessments. The report required under subsection (a) shall include the following elements:
(1) An initial assessment of cost savings to the Air Force from a multiyear contract.
(2) Analysis. An analysis of at least two different multiyear contract options that vary in either duration or quantity, at least one of which assumes a maximum procurement of 550 missiles per year for 5 years.
(3) An assessment of how a multiyear contract will impact the industrial base.
(4) An assessment of how a multiyear contract will impact the Long Range Anti-Ship Missile.
(5) An assessment of how a multiyear contract will impact the ability of the Air Force to develop additional capabilities for the JASSM–ER missile.
SEC. 152. REPORT ON AIRCRAFT FLEET OF THE CIVIL AIR PATROL..
(a) Report.—. Not later than 90 days after the date of the enactment of this Act, the Secretary of the Air Force shall submit to the congressional defense committees a report on the aircraft fleet of the Civil Air Patrol.
(b) Elements.—. Assessments. The report required by subsection (a) shall include an assessment of each of the following:
(1) Whether the number of aircraft, types of aircraft, and operating locations that comprise the Civil Air Patrol fleet are suitable for the missions and responsibilities assigned to the Civil Air Patrol, including—
(A) flight proficiency and training;
(B) operational mission training; and
(C) support for cadet orientation and cadet flight training programs in the Civil Air Patrol wing of each State.
(2) The ideal overall size of the Civil Air Patrol aircraft fleet, including a description of the factors used to determine that ideal size.133 STAT. 1246
(3) The process used by the Civil Air Patrol and the Air Force to determine the number and location of aircraft operating locations and whether State Civil Air Patrol wing commanders are appropriately involved in that process.
(4) The process used by the Civil Air Patrol, the Air Force, and other relevant entities to determine the type and number of aircraft that are needed to support the emergency, operational, and training missions of the Civil Air Patrol.
SEC. 153. SENSE OF CONGRESS ON THE LIGHT ATTACK AIRCRAFT INITIATIVE OF THE AIR FORCE.. It is the sense of the Congress that—
(1) The United States Special Operations Command has a mission requirement to support foreign internal defense training and a light attack aircraft platform could potentially facilitate meeting that requirement.
(2) The Secretary of the Air Force should coordinate with the Commander of the United States Special Operations Command to assess how general purpose forces and special operations forces can leverage the light attack aircraft phase three experimentation activities of the Air Force.
(3) The Secretary of the Air Force, in coordination with the Commander of the United States Special Operations Command, should explore options for coordinating light attack aircraft experiment activities between general purpose forces and special operations forces to maximize efficiency and effectiveness and to further the mission requirements of both forces, including options to transfer a portion of funds authorized for Air Force light attack aircraft experiments to procure aircraft for supporting the combat air advisor mission of the Special Operations Command.
Subtitle E — Defense-wide, Joint, and Multiservice Matters
SEC. 161. ECONOMIC ORDER QUANTITY CONTRACTING AND BUY-TO-BUDGET ACQUISITION FOR F–35 AIRCRAFT PROGRAM..
(a) Economic Order Quantity Contract Authority.—.
(1) In general.—. Subject to paragraphs (2) through (4), from amounts made available for obligation under the F–35 aircraft program, the Secretary of Defense may enter into one or more contracts, beginning with the fiscal year 2020 program year, for the procurement of economic order quantities of material and equipment that has completed formal hardware qualification testing for the F–35 aircraft program for use in procurement contracts to be awarded for such program during fiscal years 2021, 2022, and 2023.
(2) Limitation.—. The total amount obligated under all contracts entered into under paragraph (1) shall not exceed $574,000,000.
(3) Preliminary findings.—. Before entering into a contract under paragraph (1), the Secretary of Defense shall make each of the following findings with respect to such contract:
(A) The use of such a contract will result in significant savings of the total anticipated costs of carrying out the program through annual contracts.133 STAT. 1247
(B) The minimum need for the property to be procured is expected to remain substantially unchanged during the contemplated contract period in terms of production rate, procurement rate, and total quantities.
(C) There is a reasonable expectation that, throughout the contemplated contract period, the Secretary will request funding for the contract at the level required to avoid contract cancellation.
(D) That there is a stable, certified, and qualified design for the property to be procured and that the technical risks and redesign risks associated with such property are low.
(E) The estimates of both the cost of the contract and the anticipated cost avoidance through the use of an economic order quantity contract are realistic.
(F) Entering into the contract will promote the national security interests of the United States.
(4) Certification requirement.—. Time period. The Secretary of Defense may not enter into a contract under paragraph (1) until a period of 30 days has elapsed following the date on which the Secretary certifies to the congressional defense committees, in writing, that each of the following conditions is satisfied:
(A) A sufficient number of end items of the system being acquired under such contract have been delivered at or within the most recently available estimates of the program acquisition unit cost or procurement unit cost for such system to determine that the estimates of the unit costs are realistic.
(B) During the fiscal year in which such contract is to be awarded, sufficient funds will be available to perform the contract in such fiscal year, and the future-years defense program submitted to Congress under section 221 of title 10, United States Code, for that fiscal year will include the funding required to execute the program without cancellation.
(C) The contract is a fixed-price type contract.
(D) The proposed contract provides for production at not less than minimum economic rates given the existing tooling and facilities.
(E) Determination. The Secretary has determined that each of the conditions described in subparagraphs (A) through (F) of paragraph (3) will be met by such contract and has provided the basis for such determination to the congressional defense committees.
(b) Buy-to-budget Acquisition.—. Subject to section 2308 of title 10, United States Code, the Secretary of Defense may procure a quantity of F–35 aircraft in excess of the quantity authorized by this Act.
SEC. 162. RELIEF FROM CONTRACTORS FOR FAILURE TO DELIVER READY-FOR-ISSUE SPARE PARTS FOR THE F–35 AIRCRAFT PROGRAM..
(a) Requirement to Seek Relief.—. Consistent with the findings and recommendations of the Inspector General of the Department of Defense in the report titled “Audit of F–35 Ready-For-Issue Spare Parts and Sustainment Performance Incentive 133 STAT. 1248 Fees” (DODIG–2019–094) and dated June 13, 2019, the Secretary of Defense shall seek relief, as described in subsection (b), from prime contractors that delivered noncompliant ready-for-issue spare parts pursuant a contract under the F–35 aircraft program.
(b) Relief Described.—. The relief sought by the Secretary of Defense under subsection (a) may include the following:
(1) Specific performance.
(2) Compensation for costs incurred by the Department of Defense as a result of the contractor’s failure to deliver compliant ready-for-issue spare parts under the contract.
(3) Any other form of remediation or compensation the Secretary determines to be appropriate.
(c) Rule of Construction.—. Nothing in this section shall be construed—
(1) to alter the terms of a contract under the F–35 aircraft program; or
(2) to authorize the Secretary of Defense to seek forms of relief beyond those otherwise available under law.
SEC. 163. LIMITATION ON AVAILABILITY OF FUNDS FOR REALLOCATION OF TURKISH F–35A AIRCRAFT TO THE UNITED STATES..
(a) Limitation.—. Time period.Certification. None of the funds authorized to be appropriated by this Act or otherwise made available for fiscal year 2020 for the Air Force may be obligated or expended to procure a covered F–35A aircraft for the United States Air Force until a period of 15 days has elapsed following the date on which the Secretary of Defense certifies to the congressional defense committees that—
(1) ancillary mission equipment, initial spare parts and materials, technical data, and publications will be procured for each covered F–35A aircraft delivered to the Air Force; and
(2) each such aircraft will be delivered to the Air Force in a common configuration that may be operated and integrated within the fleet of F–35A aircraft of the Air Force.
(b) Covered F–35A Aircraft Defined.—. In this section, the term “covered F–35A aircraft” means an F–35A aircraft previously procured by or on behalf of the Government of the Republic of Turkey in F–35 production lot 12, 13, or 14.
SEC. 164. REQUIREMENT TO ESTABLISH THE USE OF AN AGILE DEVOPS SOFTWARE DEVELOPMENT SOLUTION AS AN ALTERNATIVE FOR JOINT STRIKE FIGHTER AUTONOMIC LOGISTICS INFORMATION SYSTEM..
(a) Competitive Analysis.—. The Secretary of Defense shall conduct a competitive analysis of the performance and design architecture enhancement efforts between the currently fielded Autonomic logistics Information System, Autonomic Logistics Information System–Next, and the Department of the Air Force Agile Development Operations Madhatter initiative efforts, including system technology transition opportunities and timelines.
(c) Briefing.—. Deadline. Not later than September 30, 2020, the Secretary of Defense shall provide the congressional defense committees a briefing on the findings of the competitive analysis carried out under subsection (a).133 STAT. 1249
SEC. 165. F–35 SUSTAINMENT COST..
(a) Quarterly Update.—. The Under Secretary of Defense for Acquisition and Sustainment shall include in the quarterly report required under section 155 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115–232)—
(1) Data. sustainment cost data related to the F–35 program, including a comparison in itemized format of the cost of legacy aircraft and the cost of the F–35 program, based on a standardized set of criteria; and
(2) Evaluation. an evaluation and metrics on the extent to which the goals developed pursuant to subsection (b) are being achieved.
(b) Cost Reduction Plan.—.
(1) In general.—. The Under Secretary of Defense for Acquisition and Sustainment shall develop and implement a plan for achieving significant reductions in the costs to operate, maintain, and sustain the F–35 system.
(2) Elements.—. The plan required under paragraph (1) shall include the following elements:
(A) Specific changes in the management and execution of operation and support (O&S) cost elements to engender continuous and measurable process improvements.
(B) Specific actions the Department will implement in the near, mid, and long terms to reduce O&S costs.
(C) Firm and achievable timelines for implementing the specific actions and process changes.
(3) Report.—. Not later than 180 days after the date of the enactment of this Act, the Under Secretary shall submit to the congressional defense committees a report on the baseline plan developed pursuant to paragraph (1).
SEC. 166. REPORTS ON THE PROGRESS AND PERFORMANCE OF THE F–35 AIRCRAFT PROGRAM.. Assessments.
(a) F-35 Block 4 and Continuous Capability Development and Delivery Program.—. The Secretary of Defense shall include with the annual report required by section 224(d) of the National Defense Authorization Act for Fiscal Year 2017 (Public Law 114–328; 130 Stat. 2059) an integrated master schedule and past performance assessment for each planned phase of the F–35 Block 4 Upgrade and Continuous Capability Development and Delivery Program.
(b) Comptroller General Reports.—.
(1) Annual report required.—. Not later than 30 days after the date on which the budget of the President is submitted to Congress under section 1105(a) of title 31, United States Code, for each of fiscal years 2021 through 2025, the Comptroller General of the United States shall submit to the congressional defense committees a report on the F–35 aircraft program.
(2) Elements.—. Each report under paragraph (1) shall include, with respect to the F–35 aircraft program, the following:
(A) An assessment of the progress of manufacturing processes improvement under the program.
(B) The progress and results of the F–35 Block 4 Upgrade and Continuous Capability Development and Delivery Program and other follow-on modernization development and testing efforts.133 STAT. 1250
(C) An assessment of the Department’s schedule for delivering software upgrades in six-month, scheduled increments.
(D) The progress and results of any other significant hardware development and fielding efforts necessary for the F–35 Block 4 Upgrade and Continuous Capability Development and Delivery Program.
(E) Any other issues the Comptroller General determines to be appropriate.
(c) F–35 Block 4 Defined.—. In this section, the term “F–35 Block 4 Upgrade and Continuous Capability Development and Delivery Program” means Block 4 capability upgrades for the F–35 aircraft program as described in the Selected Acquisition Report for the program submitted to Congress in March 2019, pursuant to section 2432 of title 10, United States Code.