SEC. 1.
Short title.
This Act may be cited as the “Flood Reduction, Wildlife Habitat, and Water Quality Improvement Act of 2019”.
¶
SEC. 2.
Permits for dredged or fill material.
Section 404 of the Federal Water Pollution Control Act (33 U.S.C. 1344) is amended—
¶
(1)
in subsection (c)—
¶
(A)
in the third sentence, by striking “The Administrator” and inserting the following:
¶
(B)
in the second sentence, by striking “Before making such determination” and inserting the following:
¶
(C)
by striking the subsection designation and all that follows through “The Administrator” in the first sentence and inserting the following:
¶
(D)
by inserting after paragraph (1) (as so designated) the following:
¶
(2)
Limitations.
The Administrator may not prohibit the specification of a defined area as a disposal site, or otherwise deny or restrict the use of a defined area as a disposal site—
¶
(A)
if the area is or contains a project of the Secretary for flood control;
¶
(B)
before an application for a permit under this section for the area has been filed; or
¶
(C)
after a permit under this section for the area has been issued by the Secretary.
¶
(A)
before considering a determination under paragraph (1), obtain the approval of the Administrator; and
¶
(B)
before publishing notice of a proposed determination under paragraph (1) for the area of a project, review, consider, and adequately refute the findings of an environmental impact statement for the project pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
¶
; and
¶
(E)
by adding at the end the following:
¶
(A)
In general.
Notwithstanding any other provision of law, a determination made by the Administrator under paragraph (1) with respect to the area of a project that is or contains a project of the Secretary for flood control before the date of enactment of the Flood Reduction, Wildlife Habitat, and Water Quality Improvement Act of 2019 shall no longer apply if—
¶
(i)
a more practicable alternative to the project has not been identified; and
¶
(ii)
as a result of a delay in construction of the project, severe flooding and damage to life and property have occurred.
¶
(B)
Judicial review.
Notwithstanding any other provision of law, an action taken by the Secretary to advance a project described in subparagraph (A) shall not be subject to judicial review.
¶
; and
¶
(2)
in subsection (r), by striking “under section 307),” and all that follows through the period at the end and inserting “under section 307).”.
¶