H.R. 7487
119th Congress
Reported by committee
Rural Jobs and Hydropower Expansion Act
To amend the Reclamation Project Act of 1939 to encourage non-Federal hydropower development with respect to Bureau of Reclamation projects.
Introduced
Feb 11, 2026
Committee
Aug 27, 2026
Passed House
Next step
Passed Senate
To President
Became law
+0 sections added
−0 removed
~1 modified
=1 unchanged
+73 words ·
−43 words
SEC. 2. Amendments to Reclamation Project Act Modified
SEC. 2. Amendments to Reclamation Project Act. Section 9(c) of the Reclamation Project Act of 1939 (53 (43 U.S.C. 485h(c); 53 Stat. 1194) is amended—
(1) by striking “(1)The Secretary is authorized” the subsection designation and inserting “The Secretary is authorized”; the following:
(c) Furnishing water to municipalities; sale of electric power; lease of power privileges.
(2) in paragraph (1), by striking “small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs” and inserting “hydropower using all Bureau of Reclamation facilities”;
(A) by striking “applicable transferred conduit” and inserting “applicable transferred works facility”;
(B) by striking “applicable reserved conduit” and inserting “applicable reserved works facility”; and
(C) by striking “power privilege offer for a small conduit” and inserting “power privilege offer for the”;
(A) by inserting “, or the management of Bureau of Reclamation facilities specially authorized for hydropower generation” before “, as water used”;
(C) by striking “shall be deemed incidental to” inserting “shall be deemed secondary to”; and
(A) by inserting “(referred to in this section as an “authorization”)” before “issued by the Federal Energy Regulatory Commission”;
(B) by striking “August 9, 2013,” and inserting “the date of the enactment of the Rural Jobs and Hydropower Expansion Act”; and
(C) by adding at the end “Any authorization issued by the Federal Energy Regulatory Commission with respect to a project shall remain in place until such authorization becomes inactive. As allowed by the Federal Energy Regulatory Commission, an authorization may be renewed and remain active. Once the authorization becomes inactive, project site jurisdiction shall shift to the Bureau of Reclamation exclusively.”;
(9) Nothing in this section shall expand or otherwise amend the Bureau of Reclamation lease of power privilege authorities outside the project boundary.
; and
(A) by striking subparagraphs (A), (C), (D), and (E);
⋯ Show 4 unchanged paragraphs
(B) by redesignating subparagraph (B) as subparagraph (A); and
(C) by adding at the end the following:
(B) Reserved works facility. The term reserved works facility means those facilities owned by the Bureau of Reclamation where the Bureau of Reclamation has retained responsibility for carrying out operation and maintenance activities.
(C) Transferred works facility. The term transferred works facility means a project facility where the operations and maintenance of that facility is carried out by a non-Federal entity under the provisions of a formal operations and maintenance transfer contract.